메뉴 건너뛰기




Volumn , Issue , 2006, Pages 275-280

Improving traditional earned value management by incorporating statistical process charts

Author keywords

Cause and effect analysis; Earned value; Project performance; Statistical control charts

Indexed keywords

CAUSE-AND-EFFECT ANALYSIS; CONTROL CHARTS; CORRECTIVE ACTIONS; EARNED VALUE; EARNED VALUE MANAGEMENT; INDIVIDUAL CONTROL; INDIVIDUAL PERFORMANCE; OBJECTIVE METHODS; PROJECT COST; PROJECT MANAGERS; PROJECT PERFORMANCE; STATISTICAL CONTROL; STATISTICAL PROCESS CHART; TECHNIQUES USED;

EID: 81255207349     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (7)

References (14)
  • 1
    • 33645957411 scopus 로고    scopus 로고
    • Earned value project management method and extensions
    • PMI
    • Anbari, F.T. (2003). "Earned Value Project Management Method and Extensions." Project Management Journal, PMI, 29(2), 12-23.
    • (2003) Project Management Journal , vol.29 , Issue.2 , pp. 12-23
    • Anbari, F.T.1
  • 2
    • 0002382548 scopus 로고    scopus 로고
    • Implementing earned value easily and effectively
    • PMI
    • Brandon, J. and Daniel, M. (1998). "Implementing Earned Value Easily and Effectively." Project Management Journal, PMI, 29(2), 11-18.
    • (1998) Project Management Journal , vol.29 , Issue.2 , pp. 11-18
    • Brandon, J.1    Daniel, M.2
  • 4
    • 0037118174 scopus 로고    scopus 로고
    • Evaluating environmental performance using statistical process control techniques
    • Corbett, C.J. and Pan, J.N. (2002). "Evaluating Environmental Performance using Statistical Process Control Techniques." European Journal of Operational Research, 139, 68-83.
    • (2002) European Journal of Operational Research , vol.139 , pp. 68-83
    • Corbett, C.J.1    Pan, J.N.2
  • 5
    • 80053414306 scopus 로고
    • Earned value technique for project performance
    • ASCE
    • Daniel, R.M. (1985). "Earned Value Technique for Project Performance." Journal of Management in Engineering, ASCE, 1(2), 79-94.
    • (1985) Journal of Management in Engineering , vol.1 , Issue.2 , pp. 79-94
    • Daniel, R.M.1
  • 8
    • 0028733964 scopus 로고
    • The essence of evolution of earned value
    • AACE
    • Fleming, Q.W. and Koppelman, J.M. (1994). "The Essence of Evolution of Earned Value." Journal of Cost Engineering, AACE, 36(11), 21-29.
    • (1994) Journal of Cost Engineering , vol.36 , Issue.11 , pp. 21-29
    • Fleming, Q.W.1    Koppelman, J.M.2
  • 11
    • 84992944192 scopus 로고    scopus 로고
    • Improving the performance of earned value analysis as a construction project management tool
    • Howes, R. (2000). "Improving the Performance of Earned Value Analysis as a Construction Project Management Tool." Journal of Construction and Architecture Management, 7(4), 399-411.
    • (2000) Journal of Construction and Architecture Management , vol.7 , Issue.4 , pp. 399-411
    • Howes, R.1
  • 14
    • 71049117045 scopus 로고    scopus 로고
    • Statistical process control of project performance
    • June, 2002
    • Lipke, W. (2002). "Statistical Process Control of Project Performance." The Measurable News, June, 2002, 25-28.
    • (2002) The Measurable News , pp. 25-28
    • Lipke, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.