1
-
-
85171825650
-
-
Calculating Wind Integration Costs: Separating Wind Energy Value from Integration Cost Impacts, NREL Report No. TP-550-46275, July
-
M. Milligan and B. Kirby, Calculating Wind Integration Costs: Separating Wind Energy Value from Integration Cost Impacts, NREL Report No. TP-550-46275, July 2009.
-
(2009)
-
-
Milligan, M.1
Kirby, B.2
-
2
-
-
85171822694
-
-
Capacity Requirements to Support Inter-Balancing Area Wind Delivery, NREL Report No. TP-550-46274, July
-
B. Kirby and M. Milligan, Capacity Requirements to Support Inter-Balancing Area Wind Delivery, NREL Report No. TP-550-46274, July 2009.
-
(2009)
-
-
Kirby, B.1
Milligan, M.2
-
3
-
-
85171827645
-
-
Hydro generators, reciprocating engine driven generators, and some fast-start combustion turbines do not require significant preparation time before they can start operating.
-
Hydro generators, reciprocating engine driven generators, and some fast-start combustion turbines do not require significant preparation time before they can start operating.
-
-
-
-
4
-
-
85171821520
-
We do not mean to trivialize the difficulty of performing this analysis
-
As will be discussed below, significant data is required and significant care must be taken to perform the analysis correctly. There are many common errors that some analysts continue to make.
-
We do not mean to trivialize the difficulty of performing this analysis. As will be discussed below, significant data is required and significant care must be taken to perform the analysis correctly. There are many common errors that some analysts continue to make.
-
-
-
-
5
-
-
85171827287
-
-
Ancillary- Service Details: Regulation, Load Following, and Generator Response, ORNL/CON-433, Oak Ridge National Laboratory, Oak Ridge, TN, Sept.
-
E. Hirst and B. Kirby, Ancillary- Service Details: Regulation, Load Following, and Generator Response, ORNL/CON-433, Oak Ridge National Laboratory, Oak Ridge, TN, Sept. 1996.
-
(1996)
-
-
Hirst, E.1
Kirby, B.2
-
6
-
-
85171826754
-
-
Allocating Costs of Ancillary Services: Contingency Reserves and Regulation, ORNL/TM 2003/152, Oak Ridge National Laboratory, Oak Ridge TN, June
-
E. Hirst and B. Kirby, Allocating Costs of Ancillary Services: Contingency Reserves and Regulation, ORNL/TM 2003/152, Oak Ridge National Laboratory, Oak Ridge TN, June 2003.
-
(2003)
-
-
Hirst, E.1
Kirby, B.2
-
7
-
-
85171828282
-
-
Ancillary Services: Technical and Commercial Insights, WärtsiläNorth America Inc., June
-
B. Kirby, Ancillary Services: Technical and Commercial Insights, WärtsiläNorth America Inc., June 2007, at www.consultkirby.com.
-
(2007)
-
-
Kirby, B.1
-
8
-
-
85171826567
-
The classic example is a sheep. A farmer raises a sheep. She sells mutton, hide, and wool. These are joint products
-
The costs for producing these joint products must be allocated to the joint products. The most common allocation principle is relative use, the more you use, the more you pay.
-
The classic example is a sheep. A farmer raises a sheep. She sells mutton, hide, and wool. These are joint products. She incurs various costs for raising the sheep, the joint costs of production. The electric system produces joint products: reliability, energy, capacity, convenient system access, ancillary services. The costs for producing these joint products must be allocated to the joint products. The most common allocation principle is relative use, the more you use, the more you pay.
-
She incurs various costs for raising the sheep, the joint costs of production. The electric system produces joint products: reliability, energy, capacity, convenient system access, ancillary services
-
-
-
9
-
-
85171825660
-
-
Cost-Causation-Based Tariffs for Wind Ancillary Service Impacts: Preprint, NREL Report No. CP-500-40073
-
See B. Kirby, M. Milligan and Y. Wan, Cost-Causation-Based Tariffs for Wind Ancillary Service Impacts: Preprint, NREL Report No. CP-500-40073, 2006, at http://www.nrel.gov/docs/fy06osti/40073.pdf.
-
(2006)
-
-
Kirby, B.1
Milligan, M.2
Wan, Y.3
-
10
-
-
85171812831
-
-
Electric- Power Ancillary Services, ORNL/CON-426, Oak Ridge National Laboratory, Oak Ridge, TN, Feb.
-
E. Hirst and B. Kirby, Electric- Power Ancillary Services, ORNL/CON-426, Oak Ridge National Laboratory, Oak Ridge, TN, Feb. 1996.
-
(1996)
-
-
Hirst, E.1
Kirby, B.2
-
11
-
-
85171813366
-
-
Wind Power Plant Behaviors: Analyses of Long-Term Wind Power Data, NREL Report No. TP-500-36551
-
See Y.H. Wan, Wind Power Plant Behaviors: Analyses of Long-Term Wind Power Data, NREL Report No. TP-500-36551, 2004
-
(2004)
-
-
Wan, Y.H.1
-
12
-
-
85171818095
-
-
Primer on Wind Power for Utility Applications, NREL Report No. TP-500-36230
-
Y.H. Wan, Primer on Wind Power for Utility Applications, NREL Report No. TP-500-36230, 2005.
-
(2005)
-
-
Wan, Y.H.1
-
13
-
-
85171827150
-
-
Wind Power Forecasting Errors over Multiple Timescales, NREL Report No. CP-5500-50614
-
See B.-M. Hodge and M. Milligan, Wind Power Forecasting Errors over Multiple Timescales, NREL Report No. CP-5500-50614, 2011.
-
(2011)
-
-
Hodge, B.-M.1
Milligan, M.2
-
14
-
-
85171819414
-
-
Combining Balancing Areas' Variability: Impacts on Wind Integration in the Western Interconnection
-
M. Milligan, B. Kirby, and S. Beuning, Combining Balancing Areas' Variability: Impacts on Wind Integration in the Western Interconnection, at http://www.nrel.gov/docs/fy10osti/48249.pdf.
-
-
-
Milligan, M.1
Kirby, B.2
Beuning, S.3
|