메뉴 건너뛰기




Volumn 34, Issue 1, 2012, Pages 161-170

Possibilistic programming approach for mid-term electric power planning in deregulated markets

Author keywords

Deregulated market; Electric power; GenCo; Planning; Possibilistic programming

Indexed keywords

AVAILABLE WATER; COMPUTATIONAL RESULTS; DEREGULATED MARKETS; ELECTRIC POWER; ELECTRICITY MARKET; GENCO; GENERATING UNIT; GENERATION COMPANIES; MARKET PRICE; MIXED INTEGER LINEAR PROGRAMMING; POSSIBILISTIC; POSSIBILISTIC PROGRAMMING; PRICE-BASED; SOLUTION APPROACH; SOLUTION METHODS;

EID: 81055140088     PISSN: 01420615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijepes.2011.10.014     Document Type: Article
Times cited : (26)

References (36)
  • 2
    • 30944432311 scopus 로고    scopus 로고
    • The prerequisites for effective competition in restructured wholesale electricity markets
    • DOI 10.1016/j.energy.2005.03.008, PII S0360544205000526, Electricity Market Reform and Deregulation
    • R. Hass, and H. Auer The prerequisites for effective competition in restructured wholesale electricity markets Energy 31 2006 857 864 (Pubitemid 43112194)
    • (2006) Energy , vol.31 , Issue.6-7 , pp. 857-864
    • Haas, R.1    Auer, H.2
  • 5
    • 34247101501 scopus 로고    scopus 로고
    • Power plant investment in restructured markets
    • DOI 10.1016/j.energy.2006.11.002, PII S0360544206003227
    • W.D. Walls, F.W. Rusco, and J. Ludwigson Power plant investment in restructured markets Energy 32 2007 1403 1413 (Pubitemid 46589887)
    • (2007) Energy , vol.32 , Issue.8 , pp. 1403-1413
    • Walls, W.D.1    Rusco, F.W.2    Ludwigson, J.3
  • 7
    • 56049126611 scopus 로고    scopus 로고
    • Dispatch modeling of a regional power generation system- integrating wind power
    • L. Goransson, and F. Johnsson Dispatch modeling of a regional power generation system- integrating wind power Renew Energy 34 2009 1040 1049
    • (2009) Renew Energy , vol.34 , pp. 1040-1049
    • Goransson, L.1    Johnsson, F.2
  • 8
    • 5144228382 scopus 로고    scopus 로고
    • A fuzzy optimization-based approach to large scale thermal unit commitment
    • M.M. El-Saadawi, M.A. Tantawi, and E. Tawfik A fuzzy optimization-based approach to large scale thermal unit commitment Electr Power Syst Res 72 2004 245 252
    • (2004) Electr Power Syst Res , vol.72 , pp. 245-252
    • El-Saadawi, M.M.1    Tantawi, M.A.2    Tawfik, E.3
  • 9
    • 13844320102 scopus 로고    scopus 로고
    • Fuzzy self-scheduling for GenCos
    • DOI 10.1109/TPWRS.2004.836176
    • H.Y. Yamin Fuzzy self-scheduling for GENCOs IEEE Trans Power Syst 20 1 2005 503 505 (Pubitemid 40259470)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.1 , pp. 503-505
    • Yamin, H.Y.1
  • 10
    • 0032004749 scopus 로고    scopus 로고
    • Optimal operating arrangements in the restructured worlds: Economic issues
    • R.S. Hartman, and R.D. Tabors Optimal operating arrangements in the restructured worlds: economic issues Energy Policy 26 2 1998 75 83
    • (1998) Energy Policy , vol.26 , Issue.2 , pp. 75-83
    • Hartman, R.S.1    Tabors, R.D.2
  • 11
    • 4043098244 scopus 로고    scopus 로고
    • Short-term scheduling on combined cycle units
    • B. Lu, and M. Shahidehpour Short-term scheduling on combined cycle units IEEE Trans Power Syst 19 3 2004 1616 1625
    • (2004) IEEE Trans Power Syst , vol.19 , Issue.3 , pp. 1616-1625
    • Lu, B.1    Shahidehpour, M.2
  • 12
    • 28244479344 scopus 로고    scopus 로고
    • Price-based unit commitment: A case of Lagrangian relaxation versus mixed integer programming
    • DOI 10.1109/TPWRS.2005.857391
    • T. Li, and M. Shahidehpour Price-based unit commitment: a case of Lagrangian relaxation versus mixed integer programming IEEE Trans Power Syst 20 4 2005 2015 2025 (Pubitemid 41700555)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 2015-2025
    • Li, T.1    Shahidehpour, M.2
  • 13
    • 15844397268 scopus 로고    scopus 로고
    • 2 emissions allowances market
    • DOI 10.1016/j.epsr.2004.11.005, PII S0378779605000301
    • 2 emissions allowances market Electr Power Syst Res 74 2005 257 265 (Pubitemid 40423909)
    • (2005) Electric Power Systems Research , vol.74 , Issue.2 , pp. 257-265
    • Pulgar-Painemal, H.A.1
  • 14
    • 33847673679 scopus 로고    scopus 로고
    • A three-stage short-term electric power planning procedure for a generation company in a liberalized market
    • DOI 10.1016/j.ijepes.2006.10.004, PII S0142061506001918
    • N. Nabona, and A. Pages A three-stage short-term electric power planning procedure for a generation company in a liberalized market Int J Electr Power Energy Syst 29 2007 408 421 (Pubitemid 46367208)
    • (2007) International Journal of Electrical Power and Energy Systems , vol.29 , Issue.5 , pp. 408-421
    • Nabona, N.1    Pages, A.2
  • 15
    • 37449012272 scopus 로고    scopus 로고
    • Fast Lagrangian relaxation for constrained generation scheduling in a centralized electricity market
    • DOI 10.1016/j.ijepes.2007.10.006, PII S0142061507001123
    • W. Ongsakul, and N. Petcharaks Fast Lagrangian relaxation for constrained generation scheduling in a centralized electricity market Int J Electr Power Energy Syst 30 2008 46 59 (Pubitemid 50011305)
    • (2008) International Journal of Electrical Power and Energy Systems , vol.30 , Issue.1 , pp. 46-59
    • Ongsakul, W.1    Petcharaks, N.2
  • 16
    • 44649156381 scopus 로고    scopus 로고
    • Hydrothermal self-scheduling problem in a day-ahead electricity market
    • S. Bisanovic, M. Hajro, and M. Dlakic Hydrothermal self-scheduling problem in a day-ahead electricity market Electr Power Syst Res 78 2008 1579 1596
    • (2008) Electr Power Syst Res , vol.78 , pp. 1579-1596
    • Bisanovic, S.1    Hajro, M.2    Dlakic, M.3
  • 17
    • 79951842133 scopus 로고    scopus 로고
    • Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units
    • J.P.S. Catalao, H.M.I. Pousinho, and V.M.F. Mendes Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units Int J Electr Power Energy Syst 32 2010 904 910
    • (2010) Int J Electr Power Energy Syst , vol.32 , pp. 904-910
    • Catalao, J.P.S.1    Pousinho, H.M.I.2    Mendes, V.M.F.3
  • 19
    • 77956339431 scopus 로고    scopus 로고
    • Short-term operation scheduling of a hydropower plant in the day-ahead electricity market
    • J.I. Perez-Diaz, J.R. Wilhelmi, and J.A. Sanches-Fernandez Short-term operation scheduling of a hydropower plant in the day-ahead electricity market Electr Power Syst Res 80 2010 1535 1542
    • (2010) Electr Power Syst Res , vol.80 , pp. 1535-1542
    • Perez-Diaz, J.I.1    Wilhelmi, J.R.2    Sanches-Fernandez, J.A.3
  • 20
    • 78650866387 scopus 로고    scopus 로고
    • Risk-constrained self-scheduling of a fuel and emission constrained power producer using rolling window procedure
    • S.J. Kazempour, and M. Parsa Moghaddam Risk-constrained self-scheduling of a fuel and emission constrained power producer using rolling window procedure Int J Electr Power Energy Syst 33 2011 359 368
    • (2011) Int J Electr Power Energy Syst , vol.33 , pp. 359-368
    • Kazempour, S.J.1    Parsa Moghaddam, M.2
  • 21
    • 2542598480 scopus 로고    scopus 로고
    • Unit commitment - A bibliographical survey
    • N.P. Padhy Unit commitment - a bibliographical survey IEEE Trans Power Syst 19 2004 1196 1205
    • (2004) IEEE Trans Power Syst , vol.19 , pp. 1196-1205
    • Padhy, N.P.1
  • 22
    • 65849274505 scopus 로고    scopus 로고
    • Optimization methods for solving the short-term hydrothermal coordination problem
    • L.A. Farhat, and M.E. El-Hawary Optimization methods for solving the short-term hydrothermal coordination problem Electr Power Syst Res 79 2009 1308 1320
    • (2009) Electr Power Syst Res , vol.79 , pp. 1308-1320
    • Farhat, L.A.1    El-Hawary, M.E.2
  • 23
    • 27144490723 scopus 로고    scopus 로고
    • A mixed integer programming solution for market clearing and reliability analysis
    • 2005 IEEE Power Engineering Society General Meeting
    • D. Streiffert, R. Philbrick, and A. Ott A mixed integer programming solution for market clearing and reliability analysis IEEE Power Eng Soc General Meeting 2005 2724 2731 (Pubitemid 41497419)
    • (2005) 2005 IEEE Power Engineering Society General Meeting , vol.3 , pp. 2724-2731
    • Streiffert, D.1    Philbrick, R.2    Ott, A.3
  • 24
    • 0034244481 scopus 로고    scopus 로고
    • Coordination between long-term and short-term generation scheduling with network constraints
    • M.K.C. Marwali, and M. Shahidehpour Coordination between long-term and short-term generation scheduling with network constraints IEEE Trans Power Syst 15 2000 1161 1167
    • (2000) IEEE Trans Power Syst , vol.15 , pp. 1161-1167
    • Marwali, M.K.C.1    Shahidehpour, M.2
  • 26
    • 28244477409 scopus 로고    scopus 로고
    • Long-term security-constrained unit commitment: Hybrid Dantzig-Wolfe decomposition and subgradient approach
    • DOI 10.1109/TPWRS.2005.857286
    • Y. Fu, M. Shahidehpour, and Z. Li Long-term security-constrained unit commitment: hybrid Dantzig-Wolfe decomposition and subgradient approach IEEE Trans Power Syst 20 2005 2093 2106 (Pubitemid 41700564)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 2093-2106
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 27
    • 34548724404 scopus 로고    scopus 로고
    • Fuzzy possibilistic model for medium-term power generation planning with environmental criteria
    • DOI 10.1016/j.enpol.2007.05.020, PII S0301421507002182
    • E. Muela, G. Schweickardt, and F. Garces Fuzzy possibilistic model for medium-term power generation planning with environmental criteria Energ Policy 35 2007 5643 5655 (Pubitemid 47424012)
    • (2007) Energy Policy , vol.35 , Issue.11 , pp. 5643-5655
    • Muela, E.1    Schweickardt, G.2    Garces, F.3
  • 28
    • 69949096536 scopus 로고    scopus 로고
    • Practical aspects in solving the medium-term operation planning problem of hydrothermal power systems by using the progressive hedging method
    • M.L.L. Dos Santos, E.L. Da Silva, E.C. Finardi, and R.E.C. Gocalves Practical aspects in solving the medium-term operation planning problem of hydrothermal power systems by using the progressive hedging method Int J Electr Power Energy Syst 31 2009 546 552
    • (2009) Int J Electr Power Energy Syst , vol.31 , pp. 546-552
    • Dos Santos, M.L.L.1    Da Silva, E.L.2    Finardi, E.C.3    Gocalves, R.E.C.4
  • 29
    • 0026202578 scopus 로고
    • Fuzzy dynamic programming: An application to unit commitment
    • C.C. Su, and Y.Y. Hsu Fuzzy dynamic programming: an application to unit commitment IEEE Trans Power Syst 6 3 1991 1231 1237
    • (1991) IEEE Trans Power Syst , vol.6 , Issue.3 , pp. 1231-1237
    • Su, C.C.1    Hsu, Y.Y.2
  • 31
    • 77649273047 scopus 로고    scopus 로고
    • Generation planning in Iranian power plants with fuzzy hierarchical production planning
    • R. Tanha Aminloei, and S.F. Ghaderi Generation planning in Iranian power plants with fuzzy hierarchical production planning Energy Convers Manage 51 2010 1230 1241
    • (2010) Energy Convers Manage , vol.51 , pp. 1230-1241
    • Tanha Aminloei, R.1    Ghaderi, S.F.2
  • 33
    • 0026898945 scopus 로고
    • A new approach to some possibilistic linear programming problems
    • Y.J. Lai, and C.L. Hwang A new approach to some possibilistic linear programming problems Fuzzy Set Syst 49 1992 121 133
    • (1992) Fuzzy Set Syst , vol.49 , pp. 121-133
    • Lai, Y.J.1    Hwang, C.L.2
  • 34
    • 33750738038 scopus 로고    scopus 로고
    • Linear programming with fuzzy parameters: An interactive method resolution
    • DOI 10.1016/j.ejor.2005.10.002, PII S0377221705006454
    • M. Jimenez, M. Arenas, A. Bilbao, and M.V. Rodriguez Linear programming with fuzzy parameters: an interactive method resolution Eur J Oper Res 77 2007 1599 1609 (Pubitemid 44709440)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1599-1609
    • Jimenez, M.1    Arenas, M.2    Bilbao, A.3    Rodriguez, M.V.4
  • 35
    • 12244265834 scopus 로고    scopus 로고
    • Solving a multiobjective possibilistic problem through compromise programming
    • DOI 10.1016/j.ejor.2003.11.028, PII S0377221704000499
    • M.A. Parra, A.B. Terol, B.P. Gladish, and M.V. Rodriguez Solving multiobjective possibilistic problem through compromise programming Eur J Oper Res 64 2005 748 759 (Pubitemid 40114594)
    • (2005) European Journal of Operational Research , vol.164 , Issue.3 SPEC. ISS. , pp. 748-759
    • Parra, M.A.1    Terol, A.B.2    Gladish, B.P.3    Uria, M.V.R.4
  • 36
    • 0036685786 scopus 로고    scopus 로고
    • Expected value of fuzzy variable and fuzzy expected value models
    • DOI 10.1109/TFUZZ.2002.800692, PII 1011092002800692
    • B. Liu, and Y.-K. Liu Expected value of fuzzy variable and expected value models IEEE Trans Fuzzy Syst 10 2002 445 450 (Pubitemid 34950049)
    • (2002) IEEE Transactions on Fuzzy Systems , vol.10 , Issue.4 , pp. 445-450
    • Liu, B.1    Liu, Y.-K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.