메뉴 건너뛰기




Volumn , Issue , 2011, Pages 263-272

Cross-layer analysis, testing and verification of automotive control software

Author keywords

Automotive control systems; Model based code generation; Model based testing and verification

Indexed keywords

AUTOMOTIVE CONTROL; AUTOMOTIVE CONTROL SYSTEMS; BRAKE CONTROL; CAN BUS; CODE GENERATION; CONTROL APPLICATIONS; CONTROL MESSAGES; CONTROL PERFORMANCE; CONTROL SOFTWARE; CONTROL TASK; CROSS-LAYER; CRUISE CONTROL; DESIGN FLOWS; ELECTRONIC CONTROL UNITS; EXECUTION TIME; FLEXRAY; MODEL BASED TESTING; MODEL-BASED CODE GENERATION; MULTI-LAYERED; RESEARCH CHALLENGES; SCHEDULING POLICIES; SIMULINK; TASK PARTITIONING;

EID: 80455179700     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1145/2038642.2038683     Document Type: Conference Paper
Times cited : (17)

References (58)
  • 4
    • 67249145644 scopus 로고    scopus 로고
    • Delay-aware period assignment in control systems
    • E. Bini and A. Cervin. Delay-aware period assignment in control systems. In IEEE RTSS, 2008.
    • (2008) IEEE RTSS
    • Bini, E.1    Cervin, A.2
  • 8
    • 33947633063 scopus 로고    scopus 로고
    • Resource management for control tasks based on the transient dynamics of closed-loop systems
    • R. Castane, P. Martí, M. Velasco, and A. Cervin. Resource management for control tasks based on the transient dynamics of closed-loop systems. In ECRTS, 2006.
    • (2006) ECRTS
    • Castane, R.1    Martí, P.2    Velasco, M.3    Cervin, A.4
  • 9
    • 33947670533 scopus 로고    scopus 로고
    • Optimal on-line scheduling of multiple control tasks: A case study
    • A. Cervin and P. Alriksson. Optimal on-line scheduling of multiple control tasks: A case study. In ECRTS, 2006.
    • (2006) ECRTS
    • Cervin, A.1    Alriksson, P.2
  • 10
    • 0037701352 scopus 로고    scopus 로고
    • How does control timing affect performance?. Analysis and simulation of timing using Jitterbug and TrueTime
    • A. Cervin, D. Henriksson, B. Lincoln, J. Eker, and Karl-Erik Årzén. How does control timing affect performance? Analysis and simulation of timing using Jitterbug and TrueTime. IEEE Control Systems Magazine, 23(3), 2003.
    • (2003) IEEE Control Systems Magazine , vol.23 , Issue.3
    • Cervin, A.1    Henriksson, D.2    Lincoln, B.3    Eker, J.4    Årzén, K.-E.5
  • 17
    • 31844450371 scopus 로고    scopus 로고
    • Dart: Directed automated random testing
    • P. Godefroid, N. Klarlund, and K. Sen. Dart: directed automated random testing. In PLDI, pages 213-223, 2005.
    • (2005) PLDI , pp. 213-223
    • Godefroid, P.1    Klarlund, N.2    Sen, K.3
  • 18
    • 79952919586 scopus 로고    scopus 로고
    • Co-design of Cyber-Physical Systems via controllers with flexible delay constraints
    • D. Goswami, R. Schneider, and S. Chakraborty. Co-design of Cyber-Physical Systems via controllers with flexible delay constraints. In ASP-DAC, 2011.
    • (2011) ASP-DAC
    • Goswami, D.1    Schneider, R.2    Chakraborty, S.3
  • 19
    • 79957550164 scopus 로고    scopus 로고
    • Re-engineering Cyber-Physical control applications for hybrid communication protocols
    • D. Goswami, R. Schneider, and S. Chakraborty. Re-engineering Cyber-Physical control applications for hybrid communication protocols. In DATE, 2011.
    • (2011) DATE
    • Goswami, D.1    Schneider, R.2    Chakraborty, S.3
  • 23
    • 77958494184 scopus 로고    scopus 로고
    • Reducing delay jitter of real-time control tasks through adaptive deadline adjustments
    • S. Hong, X. S. Hu, and M. D. Lemmon. Reducing delay jitter of real-time control tasks through adaptive deadline adjustments. In ECRTS, 2010.
    • (2010) ECRTS
    • Hong, S.1    Hu, X.S.2    Lemmon, M.D.3
  • 25
    • 80455165337 scopus 로고    scopus 로고
    • INCHRON. The CHRONSIM simulator. http://www.inchron.com/chronsim.html, 2010.
    • (2010) The CHRONSIM Simulator
  • 28
    • 70349257542 scopus 로고    scopus 로고
    • Symbolic analysis for improving simulation coverage of Simulink/Stateflow Models
    • A. Kanade, R. Alur, S. Ramesh, and K. C. Shashidhar. Symbolic analysis for improving simulation coverage of Simulink/Stateflow Models. In EMSOFT, 2008.
    • (2008) EMSOFT
    • Kanade, A.1    Alur, R.2    Ramesh, S.3    Shashidhar, K.C.4
  • 29
    • 80455146516 scopus 로고    scopus 로고
    • Software timing analysis using HW/SW co-simulation and instruction set simulator
    • J. Liu, M. Lajolo, and A. Sangiovanni-Vincentelli. Software timing analysis using HW/SW co-simulation and instruction set simulator. In CODES/CASHE, 1998.
    • (1998) CODES/CASHE
    • Liu, J.1    Lajolo, M.2    Sangiovanni-Vincentelli, A.3
  • 30
    • 0037298576 scopus 로고    scopus 로고
    • Timed multitasking for real-time embedded software
    • J. Liu and E. Lee. Timed multitasking for real-time embedded software. IEEE Control Systems Magazine, 23:65-75, 2002.
    • (2002) IEEE Control Systems Magazine , vol.23 , pp. 65-75
    • Liu, J.1    Lee, E.2
  • 31
    • 34548738230 scopus 로고    scopus 로고
    • Hybrid concolic testing
    • R. Majumdar and K. Sen. Hybrid concolic testing. In ICSE, pages 416-426, 2007.
    • (2007) ICSE , pp. 416-426
    • Majumdar, R.1    Sen, K.2
  • 32
    • 80052010603 scopus 로고    scopus 로고
    • Schedulability analysis of distributed Cyber-Physical applications on mixed time-/event-triggered bus architectures with retransmissions
    • A. Masrur, D. Goswami, R. Schneider, H. Voit, A. Annaswamy, and S. Chakraborty. Schedulability analysis of distributed Cyber-Physical applications on mixed time-/event-triggered bus architectures with retransmissions. In IEEE SIES, 2011.
    • (2011) IEEE SIES
    • Masrur, A.1    Goswami, D.2    Schneider, R.3    Voit, H.4    Annaswamy, A.5    Chakraborty, S.6
  • 34
  • 36
    • 80455146787 scopus 로고    scopus 로고
    • Modeling with the Timing Definition Language (TDL)
    • W. Pree and J. Templ. Modeling with the Timing Definition Language (TDL). In ASWSD, 2006.
    • (2006) ASWSD
    • Pree, W.1    Templ, J.2
  • 40
    • 0028599634 scopus 로고
    • Hardware/software co-simulation
    • J. A. Rowson. Hardware/software co-simulation. In DAC, 1994.
    • (1994) DAC
    • Rowson, J.A.1
  • 41
  • 42
    • 67649201777 scopus 로고    scopus 로고
    • An approach to reverse engineering of C programs to Simulink models with conformance testing
    • I. Saha, K. Chakraborty, S. Roy, B. V. Reddy, V. Kurapati, and V. Sharma. An approach to reverse engineering of C programs to Simulink models with conformance testing. In ISEC, 2009.
    • (2009) ISEC
    • Saha, I.1    Chakraborty, K.2    Roy, S.3    Reddy, B.V.4    Kurapati, V.5    Sharma, V.6
  • 45
    • 70349241887 scopus 로고    scopus 로고
    • Randomized directed testing (redirect) for Simulink/Stateflow Models
    • M. Satpathy, A. Yeolekar, and S. Ramesh. Randomized directed testing (redirect) for Simulink/Stateflow Models. In EMSOFT, 2008.
    • (2008) EMSOFT
    • Satpathy, M.1    Yeolekar, A.2    Ramesh, S.3
  • 46
    • 81355124068 scopus 로고    scopus 로고
    • Constraint-driven synthesis and tool-support for FlexRay-Based automotive control systems
    • R. Schneider, D. Goswami, S. Zafar, M. Lukasiewycz, and S. Chakraborty. Constraint-driven synthesis and tool-support for FlexRay-Based automotive control systems. In CODES+ISSS, 2011.
    • (2011) CODES+ISSS
    • Schneider, R.1    Goswami, D.2    Zafar, S.3    Lukasiewycz, M.4    Chakraborty, S.5
  • 47
  • 48
    • 84907933831 scopus 로고    scopus 로고
    • Gametime: A toolkit for timing analysis of software
    • S. A. Seshia and J. Kotker. Gametime: A toolkit for timing analysis of software. In TACAS/ETAPS, 2011.
    • (2011) TACAS/ETAPS
    • Seshia, S.A.1    Kotker, J.2
  • 50
    • 80455146502 scopus 로고    scopus 로고
    • Dynamic scheduling and control-quality optimization of self-triggered control applications
    • S. Soheil, P. Eles, Z. Peng, P. Tabuada, and A. Cervin. Dynamic scheduling and control-quality optimization of self-triggered control applications. In IEEE RTSS, 2010.
    • (2010) IEEE RTSS
    • Soheil, S.1    Eles, P.2    Peng, Z.3    Tabuada, P.4    Cervin, A.5
  • 51
    • 80455146518 scopus 로고    scopus 로고
    • sal.csl.sri.com
    • sal.csl.sri.com.
  • 56
    • 0036575409 scopus 로고    scopus 로고
    • Stability analysis of networked control systems
    • DOI 10.1109/87.998034, PII S1063653602034218
    • G. C. Walsh, H. Ye, and L. G. Bushnell. Stability analysis of networked control systemss. IEEE Trans. on Control System Technology, 10(3):438-446, 2002. (Pubitemid 34630818)
    • (2002) IEEE Transactions on Control Systems Technology , vol.10 , Issue.3 , pp. 438-446
    • Walsh, G.C.1    Ye, H.2    Bushnell, L.G.3
  • 58
    • 80455125430 scopus 로고    scopus 로고
    • Task scheduling for control oriented requirements for Cyber-Physical Systems
    • F. Zhang, K. Szwaykowska, W. Wolf, and V. J. Mooney. Task scheduling for control oriented requirements for Cyber-Physical Systems. In IEEE RTSS, 2008.
    • (2008) IEEE RTSS
    • Zhang, F.1    Szwaykowska, K.2    Wolf, W.3    Mooney, V.J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.