-
1
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extension
-
S. E. Elmaghraby, "The economic lot scheduling problem (ELSP): review and extension," Mgmt. Sci., vol. 24, pp. 587-597, 1978.
-
(1978)
Mgmt. Sci.
, vol.24
, pp. 587-597
-
-
Elmaghraby, S.E.1
-
2
-
-
0000380895
-
Note on the single-machine multi-product lot scheduling problem
-
R. Haessler, and S. A. Hogue, "Note on the single-machine multi-product lot scheduling problem," Mgmt. Sci., vol. 22, no. 8, pp. 909-912, 1976.
-
(1976)
Mgmt. Sci
, vol.22
, Issue.8
, pp. 909-912
-
-
Haessler, R.1
Hogue, S.A.2
-
3
-
-
0016553281
-
Scheduling a single machine multi-product system: A new approach
-
S. K. Goyal, "Scheduling a single machine multi-product system: A new approach," Int. J. Prod. Res., vol. 13, pp. 487-493, 1975.
-
(1975)
Int. J. Prod. Res.
, vol.13
, pp. 487-493
-
-
Goyal, S.K.1
-
4
-
-
0000326705
-
A dynamic programming approach to a lot scheduling problem
-
E. Bomberger, "A dynamic programming approach to a lot scheduling problem," Mgmt Sci., vol. 12, pp. 778-84, 1966.
-
(1966)
Mgmt Sci
, vol.12
, pp. 778-84
-
-
Bomberger, E.1
-
5
-
-
0015669867
-
An iterative procedure for the single-machine multi-product lot scheduling problem
-
C. L. Doll, and D. C. Whybark, "An iterative procedure for the single-machine multi-product lot scheduling problem," Mgmt Sci., vol. 20, pp. 50-55, 1973.
-
(1973)
Mgmt Sci.
, vol.20
, pp. 50-55
-
-
Doll, C.L.1
Whybark, D.C.2
-
6
-
-
0023295433
-
An extension of the extended basic period approach for economic lot scheduling problems
-
S. Axsater, "An extension of the extended basic period approach for economic lot scheduling problems," J. Optimiz. Theory. App., vol. 52, no. 2, pp. 179-189, 1987.
-
(1987)
J. Optimiz. Theory. App
, vol.52
, Issue.2
, pp. 179-189
-
-
Axsater, S.1
-
7
-
-
0026243201
-
The economic lot scheduling problem: Theory and practice
-
M. A. Lopez, and B. G. Kingsman, "The economic lot scheduling problem: theory and practice," Int. J. Prod. Econ., vol. 23, pp. 147-164, 1991.
-
(1991)
Int. J. Prod. Econ
, vol.23
, pp. 147-164
-
-
Lopez, M.A.1
Kingsman, B.G.2
-
8
-
-
0025720325
-
Survey of literature on continuously deteriorating inventory models
-
F. Raafat, "Survey of literature on continuously deteriorating inventory models," J. Oper. Res. Soc., vol. 42, pp. 27-37, 1991.
-
(1991)
J. Oper. Res. Soc.
, vol.42
, pp. 27-37
-
-
Raafat, F.1
-
9
-
-
0035480430
-
Recent trends in modeling of deteriorating inventory
-
S. K. Goyal, and B. C. Giri, "Recent trends in modeling of deteriorating inventory," Eur. J. Oper. Res., vol. 134, no. 1, pp. 1-16, 2001.
-
(2001)
Eur. J. Oper. Res.
, vol.134
, Issue.1
, pp. 1-16
-
-
Goyal, S.K.1
Giri, B.C.2
-
10
-
-
0000852513
-
Multi-objective optimization function optimization using non-dominated sorting genetic algorithms
-
N. Srinivas, and K. Deb, "Multi-objective optimization function optimization using non-dominated sorting genetic algorithms," Evol. Comput., vol. 2, pp. 221-248, 1995.
-
(1995)
Evol. Comput.
, vol.2
, pp. 221-248
-
-
Srinivas, N.1
Deb, K.2
-
11
-
-
0036530772
-
A fast and elitist multi-objective genetic algorithm: Nsga-II
-
K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan, "A fast and elitist multi-objective genetic algorithm: NSGA-II," IEEE Trans. Evol. Comput., vol. 6, no. 2, pp. 182-197, 2002.
-
(2002)
IEEE Trans. Evol. Comput
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
12
-
-
17944372286
-
On the feasibility testing of the economic lot scheduling problem using the extended basic period approach
-
M. J. Yao, S. E. Elmaghraby, and I. C. Chen, "On the feasibility testing of the economic lot scheduling problem using the extended basic period approach," J. Chin. Inst. Ind. Eng., vol. 20, pp. 435-448, 2003.
-
(2003)
J. Chin. Inst. Ind. Eng.
, vol.20
, pp. 435-448
-
-
Yao, M.J.1
Elmaghraby, S.E.2
Chen, I.C.3
-
13
-
-
71049145727
-
Non-dominated ranked genetic algorithm for solving multi-objective optimisation problems: Nrga
-
O. Al Jadaan, L. Rajamani, and C. R. Rao, "Non-dominated ranked genetic algorithm for solving multi-objective optimisation problems: NRGA," J. Theor. Appl. Inf. Tech., vol. 2, pp. 60-67, 2008.
-
(2008)
J. Theor. Appl. Inf. Tech
, vol.2
, pp. 60-67
-
-
Al Jadaan, O.1
Rajamani, L.2
Rao, C.R.3
-
14
-
-
17944365896
-
Solving the economic lot scheduling problem with deteriorating items using genetic algorithms
-
M. J. Yao, and J. X. Huang, "Solving the economic lot scheduling problem with deteriorating items using genetic algorithms," J. Food Eng., vol. 70, pp. 309-322, 2005.
-
(2005)
J. Food Eng
, vol.70
, pp. 309-322
-
-
Yao, M.J.1
Huang, J.X.2
-
15
-
-
0004140075
-
SPEA2: Improving the strength pareto evolutionary algorithm
-
Swiss Federal Inst. of Tech. (ETH) Zurich, Gloriastrasse CH-8092 Zurich, Switzerland
-
E. Zitzler, M. Laumanns, and L. Thiele, "SPEA2: Improving the strength Pareto evolutionary algorithm," Technical Report 103, Comput. Eng. Netw. Lab.(TIK), Swiss Federal Inst. of Tech. (ETH) Zurich, Gloriastrasse, 35, CH-8092 Zurich, Switzerland, 2001.
-
(2001)
Technical Report 103, Comput. Eng. Netw. Lab.(TIK)
, vol.35
-
-
Zitzler, E.1
Laumanns, M.2
Thiele, L.3
-
16
-
-
0028585530
-
A niched pareto genetic algorithm for multiobjective optimization
-
IEEE Press
-
J. Horn, N. Nafploitis, and D. E. Goldberg, "A niched Pareto genetic algorithm for multiobjective optimization," In proc. 1st IEEE Conf. on Evolutionary Computation, IEEE Press, pp. 82-87, 1994.
-
(1994)
Proc. 1st IEEE Conf. on Evolutionary Computation
, pp. 82-87
-
-
Horn, J.1
Nafploitis, N.2
Goldberg, D.E.3
-
18
-
-
0013326233
-
A fast and elitist multi objective genetic algorithm: Nsga-II
-
Kanpur: Kanpur Genetic Algorithms Laboratory (KanGAL)
-
K. Deb, S. Agarwal, A. Pratap, and T. Meyarivan, "A fast and elitist multi objective genetic algorithm: NSGA-II," Technical Report 200001, Indian Inst. of Tech., Kanpur: Kanpur Genetic Algorithms Laboratory (KanGAL), 2000a.
-
(2000)
Technical Report 200001, Indian Inst. of Tech.
-
-
Deb, K.1
Agarwal, S.2
Pratap, A.3
Meyarivan, T.4
|