-
1
-
-
0033871635
-
Scheduling no-wait robotic cells with two and three machines
-
A. Agnetis Scheduling no-wait robotic cells with two and three machines European Journal of Operational Research 123 2000 303 314
-
(2000)
European Journal of Operational Research
, vol.123
, pp. 303-314
-
-
Agnetis, A.1
-
2
-
-
0034315580
-
Part sequencing in three-machine no-wait robotic cells
-
A. Agnetis, and D. Pacciarelli Part sequencing in three-machine no-wait robotic cells Operations Research Letters 27 4 2000 185 192
-
(2000)
Operations Research Letters
, vol.27
, Issue.4
, pp. 185-192
-
-
Agnetis, A.1
Pacciarelli, D.2
-
3
-
-
2942616688
-
Single-track multi-hoist scheduling problem: A collision-free resolution based on a branch and bound approach
-
A. Che, and C. Chu Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch and bound approach International Journal of Production Research 42 12 2004 2435 2456
-
(2004)
International Journal of Production Research
, vol.42
, Issue.12
, pp. 2435-2456
-
-
Che, A.1
Chu, C.2
-
4
-
-
10044233768
-
A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line
-
A. Che, and C. Chu A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line Operations Research Letters 33 3 2005 274 284
-
(2005)
Operations Research Letters
, vol.33
, Issue.3
, pp. 274-284
-
-
Che, A.1
Chu, C.2
-
5
-
-
48849099813
-
Optimal scheduling of material handling devices in a PCB production line: Problem formulation and a polynomial algorithm
-
(Article id: 364279)
-
A. Che, and C. Chu Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm Mathematical Problems in Engineering 2008 (Article id: 364279)
-
(2008)
Mathematical Problems in Engineering
-
-
Che, A.1
Chu, C.2
-
6
-
-
74549120245
-
Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
-
A. Che, P. Yan, N. Yang, and C. Chu Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times International Journal of Production Research 48/5 2010 1225 1243
-
(2010)
International Journal of Production Research
, vol.48
, Issue.5
, pp. 1225-1243
-
-
Che, A.1
Yan, P.2
Yang, N.3
Chu, C.4
-
7
-
-
79251626563
-
A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell
-
A. Che, H. Hu, M. Chabrol, and M. Gourgand A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell Computers and Operations Research 38 9 2011 1275 1285
-
(2011)
Computers and Operations Research
, vol.38
, Issue.9
, pp. 1275-1285
-
-
Che, A.1
Hu, H.2
Chabrol, M.3
Gourgand, M.4
-
8
-
-
27644439216
-
Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
-
Subaï Corinne, Baptiste Pierre, and Niel. Eric Scheduling issues for environmentally responsible manufacturing: the case of hoist scheduling in an electroplating line International Journal of Production Economics 99 2006 74 87
-
(2006)
International Journal of Production Economics
, vol.99
, pp. 74-87
-
-
Corinne, S.1
Pierre, B.2
Eric, N.3
-
10
-
-
23944522312
-
Sequencing and scheduling in robotic cells: Recent developments
-
M. Dawande, H.N. Geismar, S.P. Sethi, and C. Sriskandarajah Sequencing and scheduling in robotic cells: recent developments Journal of Scheduling 8 5 2005 387 426
-
(2005)
Journal of Scheduling
, vol.8
, Issue.5
, pp. 387-426
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.P.3
Sriskandarajah, C.4
-
12
-
-
0038022675
-
-
Technical Report ZPR97-277, Mathematisches Institut, Universität zu Köln, Germany
-
Heinrichs, U., Moll, C., 1997. On the Scheduling of one-dimensional Transport Systems. Technical Report ZPR97-277, Mathematisches Institut, Universität zu Köln, Germany.
-
(1997)
On the Scheduling of One-dimensional Transport Systems
-
-
Heinrichs, U.1
Moll, C.2
-
14
-
-
0031269154
-
A strongly polynomial algorithm for no-wait cyclic robotic flow shop scheduling
-
V. Kats, and E. Levner A strongly polynomial algorithm for no-wait cyclic robotic flow shop scheduling Operations Research Letters 21 4 1997 171 179
-
(1997)
Operations Research Letters
, vol.21
, Issue.4
, pp. 171-179
-
-
Kats, V.1
Levner, E.2
-
15
-
-
0031540827
-
Minimizing the number of robots to meet a given cyclic schedule
-
V. Kats, and E. Levner Minimizing the number of robots to meet a given cyclic schedule Annals of Operations Research 69 1997 209 226
-
(1997)
Annals of Operations Research
, vol.69
, pp. 209-226
-
-
Kats, V.1
Levner, E.2
-
16
-
-
0345757595
-
Cyclic scheduling in a robotic production line
-
V. Kats, and E. Levner Cyclic scheduling in a robotic production line Journal of Scheduling 5 2002 23 41
-
(2002)
Journal of Scheduling
, vol.5
, pp. 23-41
-
-
Kats, V.1
Levner, E.2
-
17
-
-
0041682131
-
Minimal quantity of operators for serving a homogeneous linear technological process
-
A.V. Karzanov, and E.M. Livshits Minimal quantity of operators for serving a homogeneous linear technological process Automation and Remote Control 3 1978 445 450
-
(1978)
Automation and Remote Control
, vol.3
, pp. 445-450
-
-
Karzanov, A.V.1
Livshits, E.M.2
-
18
-
-
0028396353
-
Determining optimal cyclic hoist schedules in a single-hoist electroplating line
-
L. Lei, and T.J. Wang Determining optimal cyclic hoist schedules in a single-hoist electroplating line IIE Transactions 26 2 1994 25 33
-
(1994)
IIE Transactions
, vol.26
, Issue.2
, pp. 25-33
-
-
Lei, L.1
Wang, T.J.2
-
19
-
-
33646102212
-
An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times
-
J. Leung, and E. Levner An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times Operation Research Letters 2006 465 572
-
(2006)
Operation Research Letters
, pp. 465-572
-
-
Leung, J.1
Levner, E.2
-
20
-
-
0037524472
-
Optimal cyclic scheduling for printed-circuit-board production lines with multiple hoists and general processing sequences
-
J. Leung, and G. Zhang Optimal cyclic scheduling for printed-circuit- board production lines with multiple hoists and general processing sequences IEEE Transactions on Robotics and Automation 19 3 2003 480 484
-
(2003)
IEEE Transactions on Robotics and Automation
, vol.19
, Issue.3
, pp. 480-484
-
-
Leung, J.1
Zhang, G.2
-
21
-
-
0027663342
-
Minimizing the fleet size with dependent time window and single-track constraints
-
L. Lei, R. Armstrong, and S. Gu Minimizing the fleet size with dependent time window and single-track constraints Operations Research Letters 14 1993 91 98
-
(1993)
Operations Research Letters
, vol.14
, pp. 91-98
-
-
Lei, L.1
Armstrong, R.2
Gu, S.3
-
22
-
-
74449085396
-
A two-machine flowshop scheduling problem with deteriorating jobs and blocking
-
W. Lee, Y. Shiau, S. Chen, and C. Wu A two-machine flowshop scheduling problem with deteriorating jobs and blocking International Journal of Production Economics 124 1 2010 188 197
-
(2010)
International Journal of Production Economics
, vol.124
, Issue.1
, pp. 188-197
-
-
Lee, W.1
Shiau, Y.2
Chen, S.3
Wu, C.4
-
24
-
-
18744387412
-
An efficient optimal solution to the two-hoist no-wait cyclic scheduling problem
-
J. Liu, and Y. Jiang An efficient optimal solution to the two-hoist no-wait cyclic scheduling problem Operations Research 53 2 2005 313 327
-
(2005)
Operations Research
, vol.53
, Issue.2
, pp. 313-327
-
-
Liu, J.1
Jiang, Y.2
-
25
-
-
0007144602
-
A dual of Dilworths decomposition theorem
-
L. Mirsky A dual of Dilworths decomposition theorem Am. Math. Monthly 78 1971 876 877
-
(1971)
Am. Math. Monthly
, vol.78
, pp. 876-877
-
-
Mirsky, L.1
-
27
-
-
0028317755
-
A study of heuristics for bidirectional multi-hoist production scheduling systems
-
T. Sun, K. Lai, K. Lam, and K. So A study of heuristics for bidirectional multi-hoist production scheduling systems International Journal of Production Economics 33 1994 207 214
-
(1994)
International Journal of Production Economics
, vol.33
, pp. 207-214
-
-
Sun, T.1
Lai, K.2
Lam, K.3
So, K.4
-
28
-
-
77957784429
-
A hybrid genetic algorithm for no-wait flowshop scheduling problem
-
L. Tseng, and Y. Lin A hybrid genetic algorithm for no-wait flowshop scheduling problem International Journal of Production Economics 128 1 2010 144 152
-
(2010)
International Journal of Production Economics
, vol.128
, Issue.1
, pp. 144-152
-
-
Tseng, L.1
Lin, Y.2
-
29
-
-
77955467320
-
A genetic local search algorithm for minimizing total flowtime in the permutation flowshop scheduling problem
-
L. Tseng, and Y. Lin A genetic local search algorithm for minimizing total flowtime in the permutation flowshop scheduling problem International Journal of Production Economics 127 1 2010 121 128
-
(2010)
International Journal of Production Economics
, vol.127
, Issue.1
, pp. 121-128
-
-
Tseng, L.1
Lin, Y.2
-
31
-
-
34250222467
-
Deadlock modeling and control of semiconductor track systems using resource-oriented Petri nets
-
N. Wu, and M. Zhou Deadlock modeling and control of semiconductor track systems using resource-oriented Petri nets International Journal of Production Research 45 15 2007 3439 3456
-
(2007)
International Journal of Production Research
, vol.45
, Issue.15
, pp. 3439-3456
-
-
Wu, N.1
Zhou, M.2
-
32
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
N. Wu, C. Chu, F. Chu, and M. Zhou A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints IEEE Transactions on Semiconductor Manufacturing 21 2 2008 224 237
-
(2008)
IEEE Transactions on Semiconductor Manufacturing
, vol.21
, Issue.2
, pp. 224-237
-
-
Wu, N.1
Chu, C.2
Chu, F.3
Zhou, M.4
|