Scheduling multiple robots in a no-wait re-entrant robotic flowshop

Author keywords

Multiple robots; No wait; Polynomial algorithm; Robotic flowshop; Scheduling

Indexed keywords

CYCLE TIME; CYCLIC PRODUCTION; CYCLIC SCHEDULING; ELECTRONIC INDUSTRIES; FLOW-SHOPS; LOT SIZE; MATERIAL HANDLING; MULTIPLE ROBOT; NO-WAIT; POLYNOMIAL ALGORITHM; SEMICONDUCTOR MANUFACTURING; WORST CASE;

EID: 80055055396     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2011.07.008     Document Type: Article
Times cited : (35)

References (32)
  • 1
    • 0033871635 scopus 로고    scopus 로고
    • Scheduling no-wait robotic cells with two and three machines
    • A. Agnetis Scheduling no-wait robotic cells with two and three machines European Journal of Operational Research 123 2000 303 314
    • (2000) European Journal of Operational Research , vol.123 , pp. 303-314
    • Agnetis, A.1
  • 2
    • 0034315580 scopus 로고    scopus 로고
    • Part sequencing in three-machine no-wait robotic cells
    • A. Agnetis, and D. Pacciarelli Part sequencing in three-machine no-wait robotic cells Operations Research Letters 27 4 2000 185 192
    • (2000) Operations Research Letters , vol.27 , Issue.4 , pp. 185-192
    • Agnetis, A.1    Pacciarelli, D.2
  • 3
    • 2942616688 scopus 로고    scopus 로고
    • Single-track multi-hoist scheduling problem: A collision-free resolution based on a branch and bound approach
    • A. Che, and C. Chu Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch and bound approach International Journal of Production Research 42 12 2004 2435 2456
    • (2004) International Journal of Production Research , vol.42 , Issue.12 , pp. 2435-2456
    • Che, A.1    Chu, C.2
  • 4
    • 10044233768 scopus 로고    scopus 로고
    • A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line
    • A. Che, and C. Chu A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line Operations Research Letters 33 3 2005 274 284
    • (2005) Operations Research Letters , vol.33 , Issue.3 , pp. 274-284
    • Che, A.1    Chu, C.2
  • 5
    • 48849099813 scopus 로고    scopus 로고
    • Optimal scheduling of material handling devices in a PCB production line: Problem formulation and a polynomial algorithm
    • (Article id: 364279)
    • A. Che, and C. Chu Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm Mathematical Problems in Engineering 2008 (Article id: 364279)
    • (2008) Mathematical Problems in Engineering
    • Che, A.1    Chu, C.2
  • 6
    • 74549120245 scopus 로고    scopus 로고
    • Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
    • A. Che, P. Yan, N. Yang, and C. Chu Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times International Journal of Production Research 48/5 2010 1225 1243
    • (2010) International Journal of Production Research , vol.48 , Issue.5 , pp. 1225-1243
    • Che, A.1    Yan, P.2    Yang, N.3    Chu, C.4
  • 7
    • 79251626563 scopus 로고    scopus 로고
    • A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell
    • A. Che, H. Hu, M. Chabrol, and M. Gourgand A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell Computers and Operations Research 38 9 2011 1275 1285
    • (2011) Computers and Operations Research , vol.38 , Issue.9 , pp. 1275-1285
    • Che, A.1    Hu, H.2    Chabrol, M.3    Gourgand, M.4
  • 8
    • 27644439216 scopus 로고    scopus 로고
    • Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
    • Subaï Corinne, Baptiste Pierre, and Niel. Eric Scheduling issues for environmentally responsible manufacturing: the case of hoist scheduling in an electroplating line International Journal of Production Economics 99 2006 74 87
    • (2006) International Journal of Production Economics , vol.99 , pp. 74-87
    • Corinne, S.1    Pierre, B.2    Eric, N.3
  • 13
  • 14
    • 0031269154 scopus 로고    scopus 로고
    • A strongly polynomial algorithm for no-wait cyclic robotic flow shop scheduling
    • V. Kats, and E. Levner A strongly polynomial algorithm for no-wait cyclic robotic flow shop scheduling Operations Research Letters 21 4 1997 171 179
    • (1997) Operations Research Letters , vol.21 , Issue.4 , pp. 171-179
    • Kats, V.1    Levner, E.2
  • 15
    • 0031540827 scopus 로고    scopus 로고
    • Minimizing the number of robots to meet a given cyclic schedule
    • V. Kats, and E. Levner Minimizing the number of robots to meet a given cyclic schedule Annals of Operations Research 69 1997 209 226
    • (1997) Annals of Operations Research , vol.69 , pp. 209-226
    • Kats, V.1    Levner, E.2
  • 16
    • 0345757595 scopus 로고    scopus 로고
    • Cyclic scheduling in a robotic production line
    • V. Kats, and E. Levner Cyclic scheduling in a robotic production line Journal of Scheduling 5 2002 23 41
    • (2002) Journal of Scheduling , vol.5 , pp. 23-41
    • Kats, V.1    Levner, E.2
  • 17
    • 0041682131 scopus 로고
    • Minimal quantity of operators for serving a homogeneous linear technological process
    • A.V. Karzanov, and E.M. Livshits Minimal quantity of operators for serving a homogeneous linear technological process Automation and Remote Control 3 1978 445 450
    • (1978) Automation and Remote Control , vol.3 , pp. 445-450
    • Karzanov, A.V.1    Livshits, E.M.2
  • 18
    • 0028396353 scopus 로고
    • Determining optimal cyclic hoist schedules in a single-hoist electroplating line
    • L. Lei, and T.J. Wang Determining optimal cyclic hoist schedules in a single-hoist electroplating line IIE Transactions 26 2 1994 25 33
    • (1994) IIE Transactions , vol.26 , Issue.2 , pp. 25-33
    • Lei, L.1    Wang, T.J.2
  • 19
    • 33646102212 scopus 로고    scopus 로고
    • An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times
    • J. Leung, and E. Levner An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times Operation Research Letters 2006 465 572
    • (2006) Operation Research Letters , pp. 465-572
    • Leung, J.1    Levner, E.2
  • 20
    • 0037524472 scopus 로고    scopus 로고
    • Optimal cyclic scheduling for printed-circuit-board production lines with multiple hoists and general processing sequences
    • J. Leung, and G. Zhang Optimal cyclic scheduling for printed-circuit- board production lines with multiple hoists and general processing sequences IEEE Transactions on Robotics and Automation 19 3 2003 480 484
    • (2003) IEEE Transactions on Robotics and Automation , vol.19 , Issue.3 , pp. 480-484
    • Leung, J.1    Zhang, G.2
  • 21
    • 0027663342 scopus 로고
    • Minimizing the fleet size with dependent time window and single-track constraints
    • L. Lei, R. Armstrong, and S. Gu Minimizing the fleet size with dependent time window and single-track constraints Operations Research Letters 14 1993 91 98
    • (1993) Operations Research Letters , vol.14 , pp. 91-98
    • Lei, L.1    Armstrong, R.2    Gu, S.3
  • 22
    • 74449085396 scopus 로고    scopus 로고
    • A two-machine flowshop scheduling problem with deteriorating jobs and blocking
    • W. Lee, Y. Shiau, S. Chen, and C. Wu A two-machine flowshop scheduling problem with deteriorating jobs and blocking International Journal of Production Economics 124 1 2010 188 197
    • (2010) International Journal of Production Economics , vol.124 , Issue.1 , pp. 188-197
    • Lee, W.1    Shiau, Y.2    Chen, S.3    Wu, C.4
  • 24
    • 18744387412 scopus 로고    scopus 로고
    • An efficient optimal solution to the two-hoist no-wait cyclic scheduling problem
    • J. Liu, and Y. Jiang An efficient optimal solution to the two-hoist no-wait cyclic scheduling problem Operations Research 53 2 2005 313 327
    • (2005) Operations Research , vol.53 , Issue.2 , pp. 313-327
    • Liu, J.1    Jiang, Y.2
  • 25
    • 0007144602 scopus 로고
    • A dual of Dilworths decomposition theorem
    • L. Mirsky A dual of Dilworths decomposition theorem Am. Math. Monthly 78 1971 876 877
    • (1971) Am. Math. Monthly , vol.78 , pp. 876-877
    • Mirsky, L.1
  • 27
    • 0028317755 scopus 로고
    • A study of heuristics for bidirectional multi-hoist production scheduling systems
    • T. Sun, K. Lai, K. Lam, and K. So A study of heuristics for bidirectional multi-hoist production scheduling systems International Journal of Production Economics 33 1994 207 214
    • (1994) International Journal of Production Economics , vol.33 , pp. 207-214
    • Sun, T.1    Lai, K.2    Lam, K.3    So, K.4
  • 28
    • 77957784429 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for no-wait flowshop scheduling problem
    • L. Tseng, and Y. Lin A hybrid genetic algorithm for no-wait flowshop scheduling problem International Journal of Production Economics 128 1 2010 144 152
    • (2010) International Journal of Production Economics , vol.128 , Issue.1 , pp. 144-152
    • Tseng, L.1    Lin, Y.2
  • 29
    • 77955467320 scopus 로고    scopus 로고
    • A genetic local search algorithm for minimizing total flowtime in the permutation flowshop scheduling problem
    • L. Tseng, and Y. Lin A genetic local search algorithm for minimizing total flowtime in the permutation flowshop scheduling problem International Journal of Production Economics 127 1 2010 121 128
    • (2010) International Journal of Production Economics , vol.127 , Issue.1 , pp. 121-128
    • Tseng, L.1    Lin, Y.2
  • 31
    • 34250222467 scopus 로고    scopus 로고
    • Deadlock modeling and control of semiconductor track systems using resource-oriented Petri nets
    • N. Wu, and M. Zhou Deadlock modeling and control of semiconductor track systems using resource-oriented Petri nets International Journal of Production Research 45 15 2007 3439 3456
    • (2007) International Journal of Production Research , vol.45 , Issue.15 , pp. 3439-3456
    • Wu, N.1    Zhou, M.2
  • 32
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • N. Wu, C. Chu, F. Chu, and M. Zhou A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints IEEE Transactions on Semiconductor Manufacturing 21 2 2008 224 237
    • (2008) IEEE Transactions on Semiconductor Manufacturing , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.1    Chu, C.2    Chu, F.3    Zhou, M.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.