|
Volumn 2, Issue , 2010, Pages 923-934
|
Designing CO2 transmission pipelines without crack arrestors
a b |
Author keywords
[No Author keywords available]
|
Indexed keywords
ABU DHABI;
CARBON CAPTURE;
CODE REQUIREMENTS;
CONVENTIONAL OIL;
COST OPTIMIZATION;
CRITICAL POINTS;
DESIGN PRESSURE;
DESIGN WORK;
HIGH OPERATING PRESSURE;
INDUSTRIAL FACILITIES;
OIL AND GAS;
OIL RESERVOIRS;
PIPE-LINE SYSTEMS;
PIPELINE DESIGN;
PIPELINE NETWORKS;
PRIMARY FACTORS;
RESOLVE CONTENTION;
STEADY AND TRANSIENT;
STEEL WORKS;
TRANSMISSION PIPELINES;
WALL THICKNESS;
DESIGN;
DUCTILE FRACTURE;
GAS PIPELINES;
GAS PLANTS;
OPERATING COSTS;
OPTIMIZATION;
PETROLEUM RESERVOIR ENGINEERING;
PIPELINE CODES;
RESERVOIR MANAGEMENT;
CARBON DIOXIDE;
|
EID: 80054034553
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1115/IPC2010-31678 Document Type: Conference Paper |
Times cited : (6)
|
References (9)
|