메뉴 건너뛰기




Volumn 216, Issue 3, 2012, Pages 544-552

Approximation algorithms for the parallel flow shop problem

Author keywords

Approximation algorithms; Hybrid flow shop; Parallel flow shop; Scheduling; Worst case analysis

Indexed keywords

FLOW-SHOPS; HYBRID FLOW SHOP; JOHNSON'S RULE; MAKESPAN; NP-HARD PROBLEM; PARALLEL FLOW SHOP; SUB-PROBLEMS; TWO STAGE; WORST-CASE ANALYSIS; WORST-CASE PERFORMANCE;

EID: 80053928166     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2011.08.007     Document Type: Article
Times cited : (52)

References (17)
  • 3
    • 0003901991 scopus 로고
    • Scheduling multiprocessor flow shops
    • Du, D.-Z.; Sun, J. (Eds.)
    • Chen, B.; 1994. Scheduling multiprocessor flow shops. In: Du, D.-Z.; Sun, J. (Eds.), New Advances in Optimization and Approximation, pp. 1-8.
    • (1994) New Advances in Optimization and Approximation , pp. 1-8
    • Chen, B.1
  • 4
    • 0029254603 scopus 로고
    • Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage
    • B. Chen Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage Journal of the Operational Research Society 1995 234 244
    • (1995) Journal of the Operational Research Society , pp. 234-244
    • Chen, B.1
  • 5
    • 0023995996 scopus 로고
    • Two-stage, hybrid flowshop scheduling problem
    • J. Gupta Two-stage, hybrid flowshop scheduling problem Journal of the Operational Research Society 1988 359 364 (Pubitemid 18621609)
    • (1988) Journal of the Operational Research Society , vol.39 , Issue.4 , pp. 359-364
    • Gupta, J.1
  • 6
    • 0031543097 scopus 로고    scopus 로고
    • Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
    • J. Gupta, A. Hariri, and C. Potts Scheduling a two-stage hybrid flow shop with parallel machines at the first stage Annals of Operations Research 69 1997 171 191 (Pubitemid 127503103)
    • (1997) Annals of Operations Research , vol.69 , pp. 171-191
    • Gupta, J.N.D.1    Hariri, A.M.A.2    Potts, C.N.3
  • 7
    • 0026190509 scopus 로고
    • Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
    • J. Gupta, and E. Tunc Schedules for a two-stage hybrid flowshop with parallel machines at the second stage International Journal of Production Research 29 7 1991 1489 1502 (Pubitemid 21649910)
    • (1991) International Journal of Production Research , vol.29 , Issue.7 , pp. 1489-1502
    • Gupta Jatinder, N.D.1    Tunc Enar, A.2
  • 8
    • 0043043661 scopus 로고    scopus 로고
    • Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
    • J. Hoogeveen, J. Lenstra, and B. Veltman Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard European Journal of Operational Research 89 1 1996 172 175 (Pubitemid 126386771)
    • (1996) European Journal of Operational Research , vol.89 , Issue.1-2 , pp. 172-175
    • Hoogeveen, J.A.1    Lenstra, J.K.2    Veltman, B.3
  • 9
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with setup times included
    • S. Johnson Optimal two-and three-stage production schedules with setup times included Naval Research Logistics Quarterly 1 1 1954
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1
    • Johnson, S.1
  • 10
  • 12
    • 69749098025 scopus 로고    scopus 로고
    • Algorithms for a realistic variant of flowshop scheduling
    • B. Naderi, R. Ruiz, and M. Zandieh Algorithms for a realistic variant of flowshop scheduling Computers & Operations Research 37 2 2010 236 246
    • (2010) Computers & Operations Research , vol.37 , Issue.2 , pp. 236-246
    • Naderi, B.1    Ruiz, R.2    Zandieh, M.3
  • 13
    • 80053892372 scopus 로고    scopus 로고
    • Working paper of Hong Kong University of Science and Technology
    • Qi, X.; 2008. New results for scheduling two flowlines. Working paper of Hong Kong University of Science and Technology.
    • (2008) New Results for Scheduling Two Flowlines
    • Qi, X.1
  • 14
    • 73449099561 scopus 로고    scopus 로고
    • Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
    • I. Ribas, R. Leisten, and J. Framiñan Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective Computers & Operations Research 37 8 2010 1439 1454
    • (2010) Computers & Operations Research , vol.37 , Issue.8 , pp. 1439-1454
    • Ribas, I.1    Leisten, R.2    Framiñan, J.3
  • 16
    • 1042303029 scopus 로고    scopus 로고
    • The use of flowlines to simplify routing complexity in two-stage flowshops
    • G. Vairaktarakis, and M. Elhafsi The use of flowlines to simplify routing complexity in two-stage flowshops IIE Transactions 32 8 2000 687 699
    • (2000) IIE Transactions , vol.32 , Issue.8 , pp. 687-699
    • Vairaktarakis, G.1    Elhafsi, M.2
  • 17
    • 33745220037 scopus 로고    scopus 로고
    • Flexible flow shop scheduling: Optimum, heuristics and artificial intelligence solutions
    • DOI 10.1111/j.1468-0394.2005.00297.x
    • H. Wang Flexible flow shop scheduling: Optimum, heuristics and artificial intelligence solutions Expert Systems 22 2 2005 78 85 (Pubitemid 43906636)
    • (2005) Expert Systems , vol.22 , Issue.2 , pp. 78-85
    • Wang, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.