메뉴 건너뛰기




Volumn 8, Issue 4, 2011, Pages 865-868

On the flexible demand assignment problems: Case of unmanned aerial vehicles

Author keywords

Flexible demand assignment (FDA) problem; unmanned aerial vehicles (UAVs)

Indexed keywords

ASSIGNMENT PROBLEMS; COMPUTATIONAL EXPERIMENT; DEMAND-ASSIGNMENT; MULTI-RESOURCE GENERALIZED ASSIGNMENT PROBLEM; REAL PROBLEMS; SET-UP TIME; TEST EFFECTIVENESS;

EID: 80053649315     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2011.2159709     Document Type: Article
Times cited : (31)

References (23)
  • 1
    • 0001424551 scopus 로고
    • Algorithms for the multi-resource generalized assignment problem
    • B. Gavish and H. Pirkul, "Algorithms for the multi-resource generalized assignment problem, " Manage. Sci., vol. 37, pp. 695-713, 1991.
    • (1991) Manage. Sci. , vol.37 , pp. 695-713
    • Gavish, B.1    Pirkul, H.2
  • 2
    • 56349105078 scopus 로고    scopus 로고
    • The generalized assignment problem with flexible jobs
    • C. Rainwater, J. Geunes, and E. Romeijn, "The generalized assignment problem with flexible jobs, " Discrete Appl. Math., vol. 157, pp. 49-67, 2009.
    • (2009) Discrete Appl. Math. , vol.157 , pp. 49-67
    • Rainwater, C.1    Geunes, J.2    Romeijn, E.3
  • 3
    • 4243100666 scopus 로고    scopus 로고
    • Production planning with flexible product specifications: An application to specialty steel manufacturing
    • A. Balakrishnan and J. Geunes, "Production planning with flexible product specifications: An application to specialty steel manufacturing, " Oper. Res., vol. 51, pp. 94-112, 2003.
    • (2003) Oper. Res. , vol.51 , pp. 94-112
    • Balakrishnan, A.1    Geunes, J.2
  • 4
    • 19844377525 scopus 로고    scopus 로고
    • Build-to-order supply chain management: A literature review and framework for development
    • DOI 10.1016/j.jom.2004.10.005, PII S0272696304001184, The Build to Order Chain (BOSC) A Competitive Strategy for the 21st Century
    • A. Gunasekaran and E. W. T. Ngai, "Build-to-order supply chain management: A literature review and framework for development, " Offshoring of Service and Knowledge Work, vol. 23, pp. 423-451, 2005. (Pubitemid 40761046)
    • (2005) Journal of Operations Management , vol.23 , Issue.5 , pp. 423-451
    • Gunasekaran, A.1    Ngai, E.W.T.2
  • 5
    • 34248539177 scopus 로고
    • Flexibility in manufacturing: A survey
    • S. K. Sethi and S. P. Sethi, "Flexibility in manufacturing: A survey, " Int. J. Flexible Manuf. Syst., vol. 2, pp. 289-328, 1990.
    • (1990) Int. J. Flexible Manuf. Syst. , vol.2 , pp. 289-328
    • Sethi, S.K.1    Sethi, S.P.2
  • 6
    • 1242343574 scopus 로고    scopus 로고
    • Dynamic programming for delayed product differentiation
    • H.-M. Hsu and W.-P. Wang, "Dynamic programming for delayed product differentiation, " Eur. J. Oper. Res., vol. 156, pp. 183-193, 2004.
    • (2004) Eur. J. Oper. Res. , vol.156 , pp. 183-193
    • Hsu, H.-M.1    Wang, W.-P.2
  • 7
    • 74449093347 scopus 로고    scopus 로고
    • Supply flexibility strategies in Spanish firms: Results from a survey
    • E. M. Tachizawa and C. Gimenez, "Supply flexibility strategies in Spanish firms: Results from a survey, " Int. J. Prod. Economics, vol. 124, pp. 214-224, 2010.
    • (2010) Int. J. Prod. Economics , vol.124 , pp. 214-224
    • Tachizawa, E.M.1    Gimenez, C.2
  • 8
    • 0037694032 scopus 로고    scopus 로고
    • A new decision- making structure for the order entry stage in make-to-order environments
    • S. M. R. Iravani, K. L. Lungkesorn, and D. Simchi-Levi, "A new decision- making structure for the order entry stage in make-to-order environments, " IIE Trans., vol. 35, pp. 389-403, 2003.
    • (2003) IIE Trans. , vol.35 , pp. 389-403
    • Iravani, S.M.R.1    Lungkesorn, K.L.2    Simchi-Levi, D.3
  • 9
    • 41949112231 scopus 로고    scopus 로고
    • Effective Neighborhood Operators for Solving the Flexible Demand Assignment Problem
    • DOI 10.1109/TASE.2007.897615, 4358084
    • F.Wang and A. Lim, "Effective neighborhood operators for solving the flexible demand assignment problem, " IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 289-297, Apr. 2008. (Pubitemid 351506274)
    • (2008) IEEE Transactions on Automation Science and Engineering , vol.5 , Issue.2 , pp. 289-297
    • Wang, F.1    Lim, A.2
  • 10
    • 53049101942 scopus 로고    scopus 로고
    • Solving knapsack problems with S-curve return functions
    • S. Agrali and J. Geunes, "Solving knapsack problems with S-curve return functions, " Eur. J. Oper. Res., vol. 193, pp. 605-615, 2009.
    • (2009) Eur. J. Oper. Res. , vol.193 , pp. 605-615
    • Agrali, S.1    Geunes, J.2
  • 11
    • 55049134379 scopus 로고    scopus 로고
    • Production planning with flexible customization using a branch-and-cut method
    • T. S. A. Ng and E. L. Johnson, "Production planning with flexible customization using a branch-and-cut method, " IIE Trans., vol. 40, pp. 1198-1210, 2008.
    • (2008) IIE Trans. , vol.40 , pp. 1198-1210
    • Ng, T.S.A.1    Johnson, E.L.2
  • 12
    • 77349084365 scopus 로고    scopus 로고
    • Efficient reformulations for dynamic lot-sizing problems with product substitution
    • J. C. Lang and W. Domschke, "Efficient reformulations for dynamic lot-sizing problems with product substitution, " OR Spectrum, vol. 32, pp. 263-291, 2010.
    • (2010) OR Spectrum , vol.32 , pp. 263-291
    • Lang, J.C.1    Domschke, W.2
  • 13
  • 14
    • 80053620602 scopus 로고    scopus 로고
    • Cooperative production switchover coordination for the real-time order acceptance decision
    • S. W. Yoon and S. Y. Nof, "Cooperative production switchover coordination for the real-time order acceptance decision, " Int. J. Prod. Res., vol. iFirst, pp. 1-14, 2010.
    • (2010) Int. J. Prod. Res. , vol.IFIRST , pp. 1-14
    • Yoon, S.W.1    Nof, S.Y.2
  • 15
    • 33847678988 scopus 로고    scopus 로고
    • Order acceptance with weighted tardiness
    • DOI 10.1016/j.cor.2005.11.012, PII S030505480500359X
    • S. A. Slotnick and T. E. Morton, "Order acceptance with weighted tardiness, " Comput. Oper. Res., vol. 34, pp. 3029-3042, 2007. (Pubitemid 46356735)
    • (2007) Computers and Operations Research , vol.34 , Issue.10 , pp. 3029-3042
    • Slotnick, S.A.1    Morton, T.E.2
  • 16
    • 0035480431 scopus 로고    scopus 로고
    • Greedy solutions of selection and ordering problems
    • DOI 10.1016/S0377-2217(00)00252-6, PII S0377221700002526
    • B. Alidaee, G. A. Kochenberger, and M. M. Amini, "Greedy solutions of selection and ordering problems., " Eur. J. Oper. Res., vol. 134, pp. 203-215, 2001. (Pubitemid 32639099)
    • (2001) European Journal of Operational Research , vol.134 , Issue.1 , pp. 203-215
    • Alidaee, B.1    Kochenberger, G.A.2    Amini, M.M.3
  • 17
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • DOI 10.1016/j.ejor.2006.06.060, PII S0377221706008174
    • A. Allahverdi, C. T. Ng, T. C. E. Cheng, and M. Y. Kovalyov, "A survey of scheduling problems with setup times or costs, " Eur. J. Oper. Res., vol. 187, pp. 985-1032, 2008. (Pubitemid 350236619)
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1    Ng, C.T.2    Cheng, T.C.E.3    Kovalyov, M.Y.4
  • 18
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • A. Allahverdi, J. N. D. Gupta, and T. Aldowaisan, "A review of scheduling research involving setup considerations, " OMEGA, vol. 27, pp. 219-239, 1999.
    • (1999) OMEGA , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 19
    • 35349012992 scopus 로고    scopus 로고
    • Priority-based assignment and routing of a fleet of unmanned combat aerial vehicles
    • DOI 10.1016/j.cor.2006.09.013, PII S0305054806002255
    • V. K. Shetty, M. Sudit, and R. Nagi, "Priority-based assignment and routing of a fleet of unmanned combat aerial vehicles, " Comput. Oper. Res., vol. 35, pp. 1813-1828, 2008. (Pubitemid 47615230)
    • (2008) Computers and Operations Research , vol.35 , Issue.6 , pp. 1813-1828
    • Shetty, V.K.1    Sudit, M.2    Nagi, R.3
  • 20
    • 34447120112 scopus 로고    scopus 로고
    • Real-time optimal mission scheduling and flight path selection
    • DOI 10.1109/TAC.2007.899048
    • Y. Kim, D.-W. Gu, and I. Postlethwaite, "Real-time optimal mission scheduling and flight path selection, " IEEE Trans. Automat. Control, vol. 52, no. 6, pp. 1119-1123, Jun. 2007. (Pubitemid 47034044)
    • (2007) IEEE Transactions on Automatic Control , vol.52 , Issue.6 , pp. 1119-1123
    • Kim, Y.1    Gu, D.-W.2    Postlethwaite, I.3
  • 21
    • 85008019219 scopus 로고    scopus 로고
    • UAV task assignment: An experimental demonstration with integrated health monitoring
    • Mar.
    • B. Bethke, M. Valenti, and J. How, "UAV task assignment: An experimental demonstration with integrated health monitoring, " IEEE Robot. Autom. Mag., vol. 15, no. 1, pp. 39-44, Mar. 2008.
    • (2008) IEEE Robot. Autom. Mag. , vol.15 , Issue.1 , pp. 39-44
    • Bethke, B.1    Valenti, M.2    How, J.3
  • 22
    • 67650757522 scopus 로고    scopus 로고
    • A note on integer programming formulations of the real-time optimal scheduling and flight path selection of UAVs
    • B. Alidaee, H. Wang, and F. Landram, "A note on integer programming formulations of the real-time optimal scheduling and flight path selection of UAVs, " IEEE Trans. Control Syst. Technol., vol. 17, pp. 539-543, 2009.
    • (2009) IEEE Trans. Control Syst. Technol. , vol.17 , pp. 539-543
    • Alidaee, B.1    Wang, H.2    Landram, F.3
  • 23
    • 78049356699 scopus 로고    scopus 로고
    • A note on task assignment problems
    • B. Alidaee, H. Gao, and H. Wang, "A note on task assignment problems, " Comput. Ind. Eng., vol. 59, pp. 1015-1018, 2010.
    • (2010) Comput. Ind. Eng. , vol.59 , pp. 1015-1018
    • Alidaee, B.1    Gao, H.2    Wang, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.