-
1
-
-
0001424551
-
Algorithms for the multi-resource generalized assignment problem
-
B. Gavish and H. Pirkul, "Algorithms for the multi-resource generalized assignment problem, " Manage. Sci., vol. 37, pp. 695-713, 1991.
-
(1991)
Manage. Sci.
, vol.37
, pp. 695-713
-
-
Gavish, B.1
Pirkul, H.2
-
2
-
-
56349105078
-
The generalized assignment problem with flexible jobs
-
C. Rainwater, J. Geunes, and E. Romeijn, "The generalized assignment problem with flexible jobs, " Discrete Appl. Math., vol. 157, pp. 49-67, 2009.
-
(2009)
Discrete Appl. Math.
, vol.157
, pp. 49-67
-
-
Rainwater, C.1
Geunes, J.2
Romeijn, E.3
-
3
-
-
4243100666
-
Production planning with flexible product specifications: An application to specialty steel manufacturing
-
A. Balakrishnan and J. Geunes, "Production planning with flexible product specifications: An application to specialty steel manufacturing, " Oper. Res., vol. 51, pp. 94-112, 2003.
-
(2003)
Oper. Res.
, vol.51
, pp. 94-112
-
-
Balakrishnan, A.1
Geunes, J.2
-
4
-
-
19844377525
-
Build-to-order supply chain management: A literature review and framework for development
-
DOI 10.1016/j.jom.2004.10.005, PII S0272696304001184, The Build to Order Chain (BOSC) A Competitive Strategy for the 21st Century
-
A. Gunasekaran and E. W. T. Ngai, "Build-to-order supply chain management: A literature review and framework for development, " Offshoring of Service and Knowledge Work, vol. 23, pp. 423-451, 2005. (Pubitemid 40761046)
-
(2005)
Journal of Operations Management
, vol.23
, Issue.5
, pp. 423-451
-
-
Gunasekaran, A.1
Ngai, E.W.T.2
-
5
-
-
34248539177
-
Flexibility in manufacturing: A survey
-
S. K. Sethi and S. P. Sethi, "Flexibility in manufacturing: A survey, " Int. J. Flexible Manuf. Syst., vol. 2, pp. 289-328, 1990.
-
(1990)
Int. J. Flexible Manuf. Syst.
, vol.2
, pp. 289-328
-
-
Sethi, S.K.1
Sethi, S.P.2
-
6
-
-
1242343574
-
Dynamic programming for delayed product differentiation
-
H.-M. Hsu and W.-P. Wang, "Dynamic programming for delayed product differentiation, " Eur. J. Oper. Res., vol. 156, pp. 183-193, 2004.
-
(2004)
Eur. J. Oper. Res.
, vol.156
, pp. 183-193
-
-
Hsu, H.-M.1
Wang, W.-P.2
-
7
-
-
74449093347
-
Supply flexibility strategies in Spanish firms: Results from a survey
-
E. M. Tachizawa and C. Gimenez, "Supply flexibility strategies in Spanish firms: Results from a survey, " Int. J. Prod. Economics, vol. 124, pp. 214-224, 2010.
-
(2010)
Int. J. Prod. Economics
, vol.124
, pp. 214-224
-
-
Tachizawa, E.M.1
Gimenez, C.2
-
8
-
-
0037694032
-
A new decision- making structure for the order entry stage in make-to-order environments
-
S. M. R. Iravani, K. L. Lungkesorn, and D. Simchi-Levi, "A new decision- making structure for the order entry stage in make-to-order environments, " IIE Trans., vol. 35, pp. 389-403, 2003.
-
(2003)
IIE Trans.
, vol.35
, pp. 389-403
-
-
Iravani, S.M.R.1
Lungkesorn, K.L.2
Simchi-Levi, D.3
-
9
-
-
41949112231
-
Effective Neighborhood Operators for Solving the Flexible Demand Assignment Problem
-
DOI 10.1109/TASE.2007.897615, 4358084
-
F.Wang and A. Lim, "Effective neighborhood operators for solving the flexible demand assignment problem, " IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 289-297, Apr. 2008. (Pubitemid 351506274)
-
(2008)
IEEE Transactions on Automation Science and Engineering
, vol.5
, Issue.2
, pp. 289-297
-
-
Wang, F.1
Lim, A.2
-
10
-
-
53049101942
-
Solving knapsack problems with S-curve return functions
-
S. Agrali and J. Geunes, "Solving knapsack problems with S-curve return functions, " Eur. J. Oper. Res., vol. 193, pp. 605-615, 2009.
-
(2009)
Eur. J. Oper. Res.
, vol.193
, pp. 605-615
-
-
Agrali, S.1
Geunes, J.2
-
11
-
-
55049134379
-
Production planning with flexible customization using a branch-and-cut method
-
T. S. A. Ng and E. L. Johnson, "Production planning with flexible customization using a branch-and-cut method, " IIE Trans., vol. 40, pp. 1198-1210, 2008.
-
(2008)
IIE Trans.
, vol.40
, pp. 1198-1210
-
-
Ng, T.S.A.1
Johnson, E.L.2
-
12
-
-
77349084365
-
Efficient reformulations for dynamic lot-sizing problems with product substitution
-
J. C. Lang and W. Domschke, "Efficient reformulations for dynamic lot-sizing problems with product substitution, " OR Spectrum, vol. 32, pp. 263-291, 2010.
-
(2010)
OR Spectrum
, vol.32
, pp. 263-291
-
-
Lang, J.C.1
Domschke, W.2
-
13
-
-
37349082490
-
A new decision-making structure for the order entry stage in make-to-order environments
-
DOI 10.1016/j.ijpe.2007.01.004, PII S0925527307000503
-
M. Ebadian, M. Rabbani, F. Jolai, S. A. Torabi, and R. Tavakkoli- Moghaddam, "A new decision-making structure for the order entry stage in make-to-order environments, " Int. J. Prod. Economics, vol. 111, pp. 351-367, 2008. (Pubitemid 350299139)
-
(2008)
International Journal of Production Economics
, vol.111
, Issue.2
, pp. 351-367
-
-
Ebadian, M.1
Rabbani, M.2
Jolai, F.3
Torabi, S.A.4
Tavakkoli-Moghaddam, R.5
-
14
-
-
80053620602
-
Cooperative production switchover coordination for the real-time order acceptance decision
-
S. W. Yoon and S. Y. Nof, "Cooperative production switchover coordination for the real-time order acceptance decision, " Int. J. Prod. Res., vol. iFirst, pp. 1-14, 2010.
-
(2010)
Int. J. Prod. Res.
, vol.IFIRST
, pp. 1-14
-
-
Yoon, S.W.1
Nof, S.Y.2
-
15
-
-
33847678988
-
Order acceptance with weighted tardiness
-
DOI 10.1016/j.cor.2005.11.012, PII S030505480500359X
-
S. A. Slotnick and T. E. Morton, "Order acceptance with weighted tardiness, " Comput. Oper. Res., vol. 34, pp. 3029-3042, 2007. (Pubitemid 46356735)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.10
, pp. 3029-3042
-
-
Slotnick, S.A.1
Morton, T.E.2
-
16
-
-
0035480431
-
Greedy solutions of selection and ordering problems
-
DOI 10.1016/S0377-2217(00)00252-6, PII S0377221700002526
-
B. Alidaee, G. A. Kochenberger, and M. M. Amini, "Greedy solutions of selection and ordering problems., " Eur. J. Oper. Res., vol. 134, pp. 203-215, 2001. (Pubitemid 32639099)
-
(2001)
European Journal of Operational Research
, vol.134
, Issue.1
, pp. 203-215
-
-
Alidaee, B.1
Kochenberger, G.A.2
Amini, M.M.3
-
17
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
DOI 10.1016/j.ejor.2006.06.060, PII S0377221706008174
-
A. Allahverdi, C. T. Ng, T. C. E. Cheng, and M. Y. Kovalyov, "A survey of scheduling problems with setup times or costs, " Eur. J. Oper. Res., vol. 187, pp. 985-1032, 2008. (Pubitemid 350236619)
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
18
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
A. Allahverdi, J. N. D. Gupta, and T. Aldowaisan, "A review of scheduling research involving setup considerations, " OMEGA, vol. 27, pp. 219-239, 1999.
-
(1999)
OMEGA
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
19
-
-
35349012992
-
Priority-based assignment and routing of a fleet of unmanned combat aerial vehicles
-
DOI 10.1016/j.cor.2006.09.013, PII S0305054806002255
-
V. K. Shetty, M. Sudit, and R. Nagi, "Priority-based assignment and routing of a fleet of unmanned combat aerial vehicles, " Comput. Oper. Res., vol. 35, pp. 1813-1828, 2008. (Pubitemid 47615230)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.6
, pp. 1813-1828
-
-
Shetty, V.K.1
Sudit, M.2
Nagi, R.3
-
20
-
-
34447120112
-
Real-time optimal mission scheduling and flight path selection
-
DOI 10.1109/TAC.2007.899048
-
Y. Kim, D.-W. Gu, and I. Postlethwaite, "Real-time optimal mission scheduling and flight path selection, " IEEE Trans. Automat. Control, vol. 52, no. 6, pp. 1119-1123, Jun. 2007. (Pubitemid 47034044)
-
(2007)
IEEE Transactions on Automatic Control
, vol.52
, Issue.6
, pp. 1119-1123
-
-
Kim, Y.1
Gu, D.-W.2
Postlethwaite, I.3
-
21
-
-
85008019219
-
UAV task assignment: An experimental demonstration with integrated health monitoring
-
Mar.
-
B. Bethke, M. Valenti, and J. How, "UAV task assignment: An experimental demonstration with integrated health monitoring, " IEEE Robot. Autom. Mag., vol. 15, no. 1, pp. 39-44, Mar. 2008.
-
(2008)
IEEE Robot. Autom. Mag.
, vol.15
, Issue.1
, pp. 39-44
-
-
Bethke, B.1
Valenti, M.2
How, J.3
-
22
-
-
67650757522
-
A note on integer programming formulations of the real-time optimal scheduling and flight path selection of UAVs
-
B. Alidaee, H. Wang, and F. Landram, "A note on integer programming formulations of the real-time optimal scheduling and flight path selection of UAVs, " IEEE Trans. Control Syst. Technol., vol. 17, pp. 539-543, 2009.
-
(2009)
IEEE Trans. Control Syst. Technol.
, vol.17
, pp. 539-543
-
-
Alidaee, B.1
Wang, H.2
Landram, F.3
-
23
-
-
78049356699
-
A note on task assignment problems
-
B. Alidaee, H. Gao, and H. Wang, "A note on task assignment problems, " Comput. Ind. Eng., vol. 59, pp. 1015-1018, 2010.
-
(2010)
Comput. Ind. Eng.
, vol.59
, pp. 1015-1018
-
-
Alidaee, B.1
Gao, H.2
Wang, H.3
|