메뉴 건너뛰기




Volumn 56, Issue 9-12, 2011, Pages 1181-1193

Optimal CBPM policy considering maintenance effects and environmental condition

Author keywords

Environmental condition; Multi objective optimization; Optimal maintenance policy; Sequential imperfect maintenance

Indexed keywords

ADVANCED MANUFACTURING SYSTEMS; ENVIRONMENTAL CONDITIONS; ENVIRONMENTAL FACTORS; HAZARD RATES; IMPROVEMENT FACTORS; MAINTENANCE COST; MAINTENANCE CYCLES; MAINTENANCE EFFECT; MAINTENANCE POLICY; MAINTENANCE SCHEDULING; MONITORED SYSTEMS; MULTI OBJECTIVE; MULTIPLE ATTRIBUTE VALUE THEORY; OPTIMAL MAINTENANCE POLICIES; PREDICTIVE MAINTENANCE; RECURSIONS; SEQUENTIAL IMPERFECT MAINTENANCE; SYSTEM EFFICIENCY;

EID: 80053573852     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-011-3235-4     Document Type: Article
Times cited : (29)

References (38)
  • 1
    • 36049025876 scopus 로고    scopus 로고
    • Maintenance scheduling to support the operation of manufacturing and production assets
    • DOI 10.1007/s00170-006-0593-4
    • ASB Tam WM Chan JWH Price 2007 Maintenance scheduling to support the operation of manufacturing and production assets Int J Adv Manuf Technol 34 399 405 10.1007/s00170-006-0593-4 (Pubitemid 350092351)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.34 , Issue.3-4 , pp. 399-405
    • Tam, A.S.B.1    Chan, W.M.2    Price, J.W.H.3
  • 2
    • 0033101728 scopus 로고    scopus 로고
    • The impact of new production technologies on the maintenance function: An empirical study
    • 1714762 0945.90554 10.1080/002075499191562
    • L Swanson 1999 The impact of new production technologies on the maintenance function: an empirical study Int J Prod Res 37 849 869 1714762 0945.90554 10.1080/002075499191562
    • (1999) Int J Prod Res , vol.37 , pp. 849-869
    • Swanson, L.1
  • 3
    • 54849189300 scopus 로고    scopus 로고
    • A virtual collaborative maintenance architecture for manufacturing enterprises
    • 10.1007/s10845-008-0126-0
    • K Jenab S Zolfaghari 2008 A virtual collaborative maintenance architecture for manufacturing enterprises J Intell Manuf 19 763 771 10.1007/s10845-008-0126-0
    • (2008) J Intell Manuf , vol.19 , pp. 763-771
    • Jenab, K.1    Zolfaghari, S.2
  • 4
    • 0002362385 scopus 로고
    • Optimum preventive maintenance policies
    • 127433 0095.34304 10.1287/opre.8.1.90
    • RE Barlow LC Hunter 1960 Optimum preventive maintenance policies Oper Res 8 90 100 127433 0095.34304 10.1287/opre.8.1.90
    • (1960) Oper Res , vol.8 , pp. 90-100
    • Barlow, R.E.1    Hunter, L.C.2
  • 5
    • 27744581624 scopus 로고    scopus 로고
    • Effects of maintenance policies on the productivity of flexible manufacturing cells
    • DOI 10.1016/j.omega.2004.10.010, PII S0305048304001616
    • M Savsar 2006 Effects of maintenance policies on the productivity of flexible manufacturing cells Omega Int J Manage Sci 34 274 282 10.1016/j.omega.2004.10.010 (Pubitemid 41600564)
    • (2006) Omega , vol.34 , Issue.3 , pp. 274-282
    • Savsar, M.1
  • 6
    • 33744537035 scopus 로고    scopus 로고
    • Optimal periodic replacement policy for a two-unit system with failure rate interaction
    • DOI 10.1007/s00170-004-2486-8
    • MT Lai YC Chen 2006 Optimal periodic replacement policy for a two-unit system with failure rate interaction Int J Adv Manuf Technol 29 367 371 2276987 10.1007/s00170-004-2486-8 (Pubitemid 43814110)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.3-4 , pp. 367-371
    • Lai, M.-T.1    Chen, Y.-C.2
  • 7
    • 0036643077 scopus 로고    scopus 로고
    • Extended block replacement policy with shock models and used items
    • DOI 10.1016/S0377-2217(01)00224-7, PII S0377221701002247
    • SH Sheu WS Griffith 2002 Extended block replacement policy with shock models and used items Eur J Oper Res 140 50 60 1894085 0998.90062 10.1016/S0377-2217(01)00224-7 (Pubitemid 34249685)
    • (2002) European Journal of Operational Research , vol.140 , Issue.1 , pp. 50-60
    • Sheu, S.-H.1    Griffith, W.S.2
  • 8
    • 47749144776 scopus 로고    scopus 로고
    • Modelling of multi-stage production lines with maintenance operations
    • 10.1080/09511920701575112
    • M Savsar 2008 Modelling of multi-stage production lines with maintenance operations Int J Comput Integ M 21 396 406 10.1080/09511920701575112
    • (2008) Int J Comput Integ M , vol.21 , pp. 396-406
    • Savsar, M.1
  • 9
    • 0036837706 scopus 로고    scopus 로고
    • Optimal inspection and preventive maintenance of units with revealed and unrevealed failures
    • DOI 10.1016/S0951-8320(02)00154-0, PII S0951832002001540
    • FG Badia MD Berrade CA Campos 2002 Optimal inspection and preventive maintenance of units with revealed and unrevealed failures Reliab Eng Syst Saf 78 157 163 10.1016/S0951-8320(02)00154-0 (Pubitemid 35167610)
    • (2002) Reliability Engineering and System Safety , vol.78 , Issue.2 , pp. 157-163
    • Badia, F.G.1    Berrade, M.D.2    Campos, C.A.3
  • 10
    • 65049083989 scopus 로고    scopus 로고
    • Confidence interval for optimal preventive maintenance interval and its applications in maintenance planning
    • 10.1007/s00170-007-1315-2
    • T Halim LC Tang 2009 Confidence interval for optimal preventive maintenance interval and its applications in maintenance planning Int J Adv Manuf Technol 40 203 213 10.1007/s00170-007-1315-2
    • (2009) Int J Adv Manuf Technol , vol.40 , pp. 203-213
    • Halim, T.1    Tang, L.C.2
  • 11
    • 67649922887 scopus 로고    scopus 로고
    • Scheduling sequence-dependent setup time job shops with preventive maintenance
    • 10.1007/s00170-008-1693-0
    • B Naderi M Zandieh SMTF Ghomi 2009 Scheduling sequence-dependent setup time job shops with preventive maintenance Int J Adv Manuf Technol 43 170 181 10.1007/s00170-008-1693-0
    • (2009) Int J Adv Manuf Technol , vol.43 , pp. 170-181
    • Naderi, B.1    Zandieh, M.2    Smtf, G.3
  • 12
    • 28944449352 scopus 로고    scopus 로고
    • Selection and validation of predictive regression and neural network models based on designed experiments
    • DOI 10.1080/07408170500346378, PII P67327115554238
    • CXJ Feng ZG Yu A Kusiak 2006 Selection and validation of predictive regression and neural network models based on designed experiments IIE Trans 38 13 23 10.1080/07408170500346378 (Pubitemid 41781493)
    • (2006) IIE Transactions (Institute of Industrial Engineers) , vol.38 , Issue.1 , pp. 13-23
    • Feng, C.-X.J.1    Yu, Z.-G.2    Kusiak, A.3
  • 13
    • 33846960196 scopus 로고    scopus 로고
    • The application of genetic algorithm in the development of preventive maintenance analytic model
    • 10.1007/s00170-005-0314-4
    • YS Shum DC Gong 2007 The application of genetic algorithm in the development of preventive maintenance analytic model Int J Adv Manuf Technol 32 169 183 10.1007/s00170-005-0314-4
    • (2007) Int J Adv Manuf Technol , vol.32 , pp. 169-183
    • Shum, Y.S.1    Gong, D.C.2
  • 14
    • 33747672649 scopus 로고    scopus 로고
    • A model for preventive maintenance operations and forecasting
    • DOI 10.1007/s10845-005-0017-6
    • DD Sheu JY Kuo 2006 A model for preventive maintenance operations and forecasting J Intell Manuf 17 441 451 10.1007/s10845-005-0017-6 (Pubitemid 44273768)
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.4 , pp. 441-451
    • Sheu, D.D.1    Kuo, J.Y.2
  • 16
    • 1642601903 scopus 로고    scopus 로고
    • Classes of imperfect repair models based on reduction of failure intensity or virtual age
    • 10.1016/S0951-8320(03)00173-X
    • L Doyen O Gaudoin 2004 Classes of imperfect repair models based on reduction of failure intensity or virtual age Reliab Eng Syst Saf 84 45 56 10.1016/S0951-8320(03)00173-X
    • (2004) Reliab Eng Syst Saf , vol.84 , pp. 45-56
    • Doyen, L.1    Gaudoin, O.2
  • 17
    • 33845605765 scopus 로고    scopus 로고
    • Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation
    • DOI 10.1016/j.ress.2006.01.006, PII S0951832006000305
    • X Zhou L Xi J Lee 2007 Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation Reliab Eng Syst Saf 92 530 534 10.1016/j.ress.2006.01.006 (Pubitemid 44959910)
    • (2007) Reliability Engineering and System Safety , vol.92 , Issue.4 , pp. 530-534
    • Zhou, X.1    Xi, L.2    Lee, J.3
  • 18
    • 0033117187 scopus 로고    scopus 로고
    • Age-dependent reliability model considering effects of maintenance and working conditions
    • 10.1016/S0951-8320(98)00050-7
    • S Martorell A Sanchez V Serradell 1999 Age-dependent reliability model considering effects of maintenance and working conditions Reliab Eng Syst Saf 64 19 31 10.1016/S0951-8320(98)00050-7
    • (1999) Reliab Eng Syst Saf , vol.64 , pp. 19-31
    • Martorell, S.1    Sanchez, A.2    Serradell, V.3
  • 19
    • 33746216902 scopus 로고    scopus 로고
    • Intelligent prognostics tools and e-maintenance
    • DOI 10.1016/j.compind.2006.02.014, PII S0166361506000522
    • J Lee J Ni D Djurdjanovic H Qiu H Liao 2006 Intelligent prognostics tools and e-maintenance Comput Ind 57 476 489 10.1016/j.compind.2006.02.014 (Pubitemid 44093746)
    • (2006) Computers in Industry , vol.57 , Issue.6 , pp. 476-489
    • Lee, J.1    Ni, J.2    Djurdjanovic, D.3    Qiu, H.4    Liao, H.5
  • 20
    • 70449590251 scopus 로고    scopus 로고
    • A hybrid learning-based model for on-line monitoring and diagnosis of out-of-control signals in multivariate manufacturing processes
    • 1198.90159 10.1080/00207540801942208
    • J Yu L Xi 2009 A hybrid learning-based model for on-line monitoring and diagnosis of out-of-control signals in multivariate manufacturing processes Int J Prod Res 47 4077 4108 1198.90159 10.1080/00207540801942208
    • (2009) Int J Prod Res , vol.47 , pp. 4077-4108
    • Yu, J.1    Xi, L.2
  • 21
    • 0031680355 scopus 로고    scopus 로고
    • A decision optimization model for condition-based maintenance
    • 10.1108/13552519810213644
    • AKS Jardine V Makis D Banjevic D Braticevic M Ennis 1998 A decision optimization model for condition-based maintenance J Qual Maint Eng 4 115 121 10.1108/13552519810213644
    • (1998) J Qual Maint Eng , vol.4 , pp. 115-121
    • Jardine, A.K.S.1    Makis, V.2    Banjevic, D.3    Braticevic, D.4    Ennis, M.5
  • 22
    • 0032653742 scopus 로고    scopus 로고
    • Optimizing condition-based maintenance decisions for equipment subject to vibration monitoring
    • 10.1108/13552519910282647
    • AKS Jardine T Joseph D Banjevic 1999 Optimizing condition-based maintenance decisions for equipment subject to vibration monitoring J Qual Maint Eng 5 192 202 10.1108/13552519910282647
    • (1999) J Qual Maint Eng , vol.5 , pp. 192-202
    • Jardine, A.K.S.1    Joseph, T.2    Banjevic, D.3
  • 23
    • 74249104832 scopus 로고    scopus 로고
    • Scheduling flowshops with condition-based maintenance constraint to minimize expected makespan
    • 10.1007/s00170-009-2151-3
    • E Safari SJ Sadjadi K Shahanaghi 2010 Scheduling flowshops with condition-based maintenance constraint to minimize expected makespan Int J Adv Manuf Technol 46 757 767 10.1007/s00170-009-2151-3
    • (2010) Int J Adv Manuf Technol , vol.46 , pp. 757-767
    • Safari, E.1    Sadjadi, S.J.2    Shahanaghi, K.3
  • 24
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • DOI 10.1016/j.cor.2005.12.007, PII S0305054805004041
    • R Ruiz JC García-Díaz C Maroto 2007 Considering scheduling and preventive maintenance in the flowshop sequencing problem Comput Oper Res 34 3314 3330 1128.90031 10.1016/j.cor.2005.12.007 (Pubitemid 46517859)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3314-3330
    • Ruiz, R.1    Carlos Garcia-Diaz, J.2    Maroto, C.3
  • 25
    • 70450260889 scopus 로고    scopus 로고
    • A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling
    • 10.1007/s10845-008-0157-6
    • B Naderi M Zandieh SMT Fatemi Ghomi 2009 A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling J Intell Manuf 20 683 694 10.1007/s10845-008-0157-6
    • (2009) J Intell Manuf , vol.20 , pp. 683-694
    • Naderi, B.1    Zandieh, M.2    Fatemi Ghomi, S.M.T.3
  • 26
    • 67651204593 scopus 로고    scopus 로고
    • Optimal production run length and maintenance schedule for a deteriorating production system
    • 10.1007/s00170-008-1773-1
    • TH Lee 2009 Optimal production run length and maintenance schedule for a deteriorating production system Int J Adv Manuf Technol 43 959 963 10.1007/s00170-008-1773-1
    • (2009) Int J Adv Manuf Technol , vol.43 , pp. 959-963
    • Lee, T.H.1
  • 27
    • 0026837810 scopus 로고
    • Cost optimization of maintenance scheduling for a system with assured reliability
    • 0825.90423 10.1109/24.126665
    • V Jayabalan D Chaudhuri 1992 Cost optimization of maintenance scheduling for a system with assured reliability IEEE Trans Reliab 41 21 25 0825.90423 10.1109/24.126665
    • (1992) IEEE Trans Reliab , vol.41 , pp. 21-25
    • Jayabalan, V.1    Chaudhuri, D.2
  • 28
    • 77958072496 scopus 로고    scopus 로고
    • Single-machine-based production scheduling model integrated preventive maintenance planning
    • 10.1007/s00170-009-2514-9
    • E Pan W Liao L Xi 2010 Single-machine-based production scheduling model integrated preventive maintenance planning Int J Adv Manuf Technol 50 365 375 10.1007/s00170-009-2514-9
    • (2010) Int J Adv Manuf Technol , vol.50 , pp. 365-375
    • Pan, E.1    Liao, W.2    Xi, L.3
  • 29
    • 0024054513 scopus 로고
    • Sequential imperfect preventive maintenance policies
    • 942309 0648.90031 10.1109/24.3758
    • T Nakagawa 1988 Sequential imperfect preventive maintenance policies IEEE Trans Reliab 37 295 298 942309 0648.90031 10.1109/24.3758
    • (1988) IEEE Trans Reliab , vol.37 , pp. 295-298
    • Nakagawa, T.1
  • 30
    • 52149114233 scopus 로고    scopus 로고
    • Modelling and optimizing sequential imperfect preventive maintenance
    • 10.1016/j.ress.2008.03.002
    • M Bartholomew-Biggs MJ Zuo X Li 2009 Modelling and optimizing sequential imperfect preventive maintenance Reliab Eng Syst Saf 94 53 62 10.1016/j.ress.2008.03.002
    • (2009) Reliab Eng Syst Saf , vol.94 , pp. 53-62
    • Bartholomew-Biggs, M.1    Zuo, M.J.2    Li, X.3
  • 31
    • 0033905057 scopus 로고    scopus 로고
    • Optimizing maintenance and repair policies via a combination of genetic algorithms and Monte Carlo simulation
    • DOI 10.1016/S0951-8320(00)00007-7
    • M Marseguerra E Zio 2000 Optimizing maintenance and repair policies via a combination of genetic algorithms and Monte Carlo simulation Reliab Eng Syst Saf 68 69 83 10.1016/S0951-8320(00)00007-7 (Pubitemid 30594621)
    • (2000) Reliability Engineering and System Safety , vol.68 , Issue.1 , pp. 69-83
    • Marseguerra, M.1    Zio, E.2
  • 32
    • 2142714506 scopus 로고    scopus 로고
    • A study of availability-centered preventive maintenance for multi-component systems
    • 10.1016/j.ress.2003.11.011
    • YT Tsai KS Wang LC Tsai 2004 A study of availability-centered preventive maintenance for multi-component systems Reliab Eng Syst Saf 84 261 270 10.1016/j.ress.2003.11.011
    • (2004) Reliab Eng Syst Saf , vol.84 , pp. 261-270
    • Tsai, Y.T.1    Wang, K.S.2    Tsai, L.C.3
  • 33
    • 22344431748 scopus 로고    scopus 로고
    • Performance analysis of an FMS operating under different failure rates and maintenance policies
    • DOI 10.1007/s10696-005-1009-8
    • M Savsar 2005 Performance analysis of an FMS operating under different failure rates and maintenance policies Int J Flex Manuf Sys 16 229 249 1137.90458 10.1007/s10696-005-1009-8 (Pubitemid 40997686)
    • (2005) International Journal of Flexible Manufacturing Systems , vol.16 , Issue.3 , pp. 229-249
    • Savsar, M.1
  • 34
    • 0030105804 scopus 로고    scopus 로고
    • An overall model for maintenance optimization
    • DOI 10.1016/0951-8320(95)00055-0
    • J Vatn P Hokstad L Bodsberg 1996 An overall model for maintenance optimization Reliab Eng Syst Saf 51 241 257 10.1016/0951-8320(95)00055-0 (Pubitemid 126349478)
    • (1996) Reliability Engineering and System Safety , vol.51 , Issue.3 , pp. 241-257
    • Vatn, J.1    Hokstad, P.2    Bodsberg, L.3
  • 35
    • 0036604021 scopus 로고    scopus 로고
    • Age replacement policy: A multi-attribute value model
    • DOI 10.1016/S0951-8320(02)00021-2, PII S0951832002000212
    • R Jiang P Ji 2002 Age replacement policy: a multi-attribute value model Reliab Eng Syst Saf 76 311 318 10.1016/S0951-8320(02)00021-2 (Pubitemid 34545610)
    • (2002) Reliability Engineering and System Safety , vol.76 , Issue.3 , pp. 311-318
    • Jiang, R.1    Ji, P.2
  • 36
    • 39749159847 scopus 로고    scopus 로고
    • Optimization of cost and downtime for replacement model following the expiration of warranty
    • DOI 10.1016/j.ress.2007.05.005, PII S0951832007001585
    • KM Jung SS Han DH Park 2008 Optimization of cost and downtime for replacement model following the expiration of warranty Reliab Eng Syst Saf 93 995 1003 10.1016/j.ress.2007.05.005 (Pubitemid 351305191)
    • (2008) Reliability Engineering and System Safety , vol.93 , Issue.7 , pp. 995-1003
    • Jung, K.M.1    Han, S.S.2    Park, D.H.3
  • 37
    • 67749116576 scopus 로고    scopus 로고
    • Bi-objective optimization algorithms for joint production and maintenance scheduling: Application to the parallel machine problem
    • 10.1007/s10845-008-0113-5
    • A Berrichi L Amodeo F Yalaoui E Châtelet M Mezghiche 2009 Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem J Intell Manuf 20 389 400 10.1007/s10845-008-0113-5
    • (2009) J Intell Manuf , vol.20 , pp. 389-400
    • Berrichi, A.1    Amodeo, L.2    Yalaoui, F.3    Châtelet, E.4    Mezghiche, M.5
  • 38
    • 0018517702 scopus 로고
    • Reliable preventive maintenance policy
    • MAK Malik 1979 Reliable preventive maintenance policy AIIE Trans 11 221 228
    • (1979) AIIE Trans , vol.11 , pp. 221-228
    • Malik, M.A.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.