메뉴 건너뛰기




Volumn 57, Issue 1-4, 2011, Pages 215-224

A neural network-based build time estimator for layer manufactured objects

Author keywords

Artificial neural network; Build time estimation; Rapid prototyping

Indexed keywords

ACCURATE ESTIMATION; ARTIFICIAL NEURAL NETWORK; BUILD TIME; CRITICAL CASE; DRIVING FACTORS; DYNAMIC PERFORMANCE; NETWORK-BASED; PARAMETRIC APPROACH; PARAMETRIC METHOD; PARAMETRIC MODELS; TEST CASE;

EID: 80053562089     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-011-3284-8     Document Type: Article
Times cited : (72)

References (26)
  • 1
    • 70349280462 scopus 로고    scopus 로고
    • Analysis of interaction between geometry and efficiency of impeller pump using rapid prototyping
    • 10.1007/s00170-008-1908-4
    • D Rajenthirakumar KA Jagadeesh 2009 Analysis of interaction between geometry and efficiency of impeller pump using rapid prototyping Int J Adv Manuf Technol 44 890 899 10.1007/s00170-008-1908-4
    • (2009) Int J Adv Manuf Technol , vol.44 , pp. 890-899
    • Rajenthirakumar, D.1    Jagadeesh, K.A.2
  • 2
    • 74249120363 scopus 로고    scopus 로고
    • Agile product development through prototyping technologies: An examination pump-manufacturing company
    • 10.1007/s00170-009-2142-4
    • S Vinodh SR Devadasan S Maheshkumar M Aravindakshan M Arumugam K Balakrishnan 2010 Agile product development through prototyping technologies: an examination pump-manufacturing company Int J Adv Manuf Technol 46 5-8 663 679 10.1007/s00170-009-2142-4
    • (2010) Int J Adv Manuf Technol , vol.46 , Issue.58 , pp. 663-679
    • Vinodh, S.1    Devadasan, S.R.2    Maheshkumar, S.3    Aravindakshan, M.4    Arumugam, M.5    Balakrishnan, K.6
  • 3
    • 9444294520 scopus 로고    scopus 로고
    • Process build time estimator algorithm for lamined object manufacturing
    • 10.1108/13552540410562331
    • J Kechagias S Maropoulos S Karagiannis 2004 Process build time estimator algorithm for lamined object manufacturing Rapid Prototyping J 10 5 297 304 10.1108/13552540410562331
    • (2004) Rapid Prototyping J , vol.10 , Issue.5 , pp. 297-304
    • Kechagias, J.1    Maropoulos, S.2    Karagiannis, S.3
  • 4
    • 0032045538 scopus 로고    scopus 로고
    • Part orientation and build cost determination in layered manufacturing
    • PII S0010448597000833
    • P Alexander S Allen D Dutta 1998 Part orientation and build cost determination in layered manufacturing Comput-Aided Des 30 5 343 356 10.1016/S0010-4485(97)00083-3 (Pubitemid 128640704)
    • (1998) CAD Computer Aided Design , vol.30 , Issue.5 , pp. 343-356
    • Alexander, P.1    Allen, S.2    Dutta, D.3
  • 5
    • 27144471864 scopus 로고    scopus 로고
    • Determination of the optimal build direction for different rapid prototyping processes using multi-criterion decision making
    • DOI 10.1016/j.rcim.2005.03.001, PII S0736584505000232
    • H-S Byun KH Lee 2006 Determination of the optimal build direction for different rapid prototyping processes using multi-criterion decision making Robot Comput-Integr Manuf 22 69 80 10.1016/j.rcim.2005.03.001 (Pubitemid 41497911)
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.1 , pp. 69-80
    • Byun, H.-S.1    Lee, K.H.2
  • 6
    • 1442304648 scopus 로고    scopus 로고
    • The development of web-based E-business system for rapid prototyping manufacturing
    • Luo RC, Tzou JH, Lan CC (2003) The development of web-based E-business system for rapid prototyping manufacturing. Industrial Electronics Society, IECON'03 2:1290-1295
    • (2003) Industrial Electronics Society, IECON'03 , vol.2 , pp. 1290-1295
    • Luo, R.C.1    Tzou, J.H.2    Lan, C.C.3
  • 7
    • 0035427333 scopus 로고    scopus 로고
    • A study of the build-time estimation problem for Stereolithography systems
    • DOI 10.1016/S0736-5845(01)00007-2, PII S0736584501000072
    • J Giannatsis V Dedoussis L Laios 2001 A study of the build-time estimation problem for stereolithography systems Robot Comput-Integr Manuf 17 295 304 10.1016/S0736-5845(01)00007-2 (Pubitemid 32543778)
    • (2001) Robotics and Computer-Integrated Manufacturing , vol.17 , Issue.4 , pp. 295-304
    • Giannatsis, J.1    Dedoussis, V.2    Laios, L.3
  • 8
    • 62549115131 scopus 로고    scopus 로고
    • Determination of optimal build orientation based on satisfactory degree theory for RPT
    • Zhao J, Liu W, Wu J (2006) Determination of optimal build orientation based on satisfactory degree theory for RPT, J CAD/CAM, 6 (1)
    • (2006) J CAD/CAM , vol.6 , Issue.1
    • Zhao, J.1    Liu, W.2    Wu, J.3
  • 9
    • 33644696009 scopus 로고    scopus 로고
    • Determination of optimal build direction in rapid prototyping with variable slicing
    • DOI 10.1007/s00170-004-2355-5
    • HS Byun KH Lee 2006 Determination of optimal build direction in rapid prototyping with variable slicing Int J Adv Manuf Technol 28 307 313 10.1007/s00170-004-2355-5 (Pubitemid 43333547)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.28 , Issue.3-4 , pp. 307-313
    • Byun, H.S.1    Lee, K.H.2
  • 10
    • 0029517101 scopus 로고
    • Multi-objective optimization of part building orientation in stereolithography
    • 10.1108/13552549510104429
    • W Cheng J Fuh A Nee YS Wong HT Loh T Miyazawa 1995 Multi-objective optimization of part building orientation in stereolithography Rapid Prototyping J 1 4 339 345 10.1108/13552549510104429
    • (1995) Rapid Prototyping J , vol.1 , Issue.4 , pp. 339-345
    • Cheng, W.1    Fuh, J.2    Nee, A.3    Wong, Y.S.4    Loh, H.T.5    Miyazawa, T.6
  • 11
    • 0029391903 scopus 로고
    • Export system-based selection of the preferred direction of build for rapid prototyping processes
    • 10.1007/BF00124677
    • D Frank G Fadel 1995 Export system-based selection of the preferred direction of build for rapid prototyping processes J Intell Manuf 6 5 339 345 10.1007/BF00124677
    • (1995) J Intell Manuf , vol.6 , Issue.5 , pp. 339-345
    • Frank, D.1    Fadel, G.2
  • 12
    • 0032658598 scopus 로고    scopus 로고
    • Consideration of optimal orientation for different rapid prototyping
    • 10.1108/13552549910267344
    • F Xu TL Oh YS Wong 1999 Consideration of optimal orientation for different rapid prototyping Rapid Prototyping J 5 2 54 60 10.1108/ 13552549910267344
    • (1999) Rapid Prototyping J , vol.5 , Issue.2 , pp. 54-60
    • Xu, F.1    Oh, T.L.2    Wong, Y.S.3
  • 13
    • 33750286990 scopus 로고    scopus 로고
    • Empirical laser sintering time estimator for Duraform PA
    • DOI 10.1080/00207540600622522, PII P10607779R090751
    • M Ruffo C Tuck R Hague 2006 Empirical laser sintering time estimator for Duraform PA Int J Prod Res 44 23 5131 5146 1128.90430 10.1080/00207540600622522 (Pubitemid 44627513)
    • (2006) International Journal of Production Research , vol.44 , Issue.23 , pp. 5131-5146
    • Ruffo, M.1    Tuck, C.2    Hague, R.3
  • 14
    • 68849097783 scopus 로고    scopus 로고
    • Neural-network-based model for build-time estimation in selective laser sintering
    • 10.1243/09544054JEM1324
    • J Munguía J Ciurana C Riba 2009 Neural-network-based model for build-time estimation in selective laser sintering Proc Inst Mech Eng, B: J Eng Manuf 223 8 995 1003 10.1243/09544054JEM1324
    • (2009) Proc Inst Mech Eng, B: J Eng Manuf , vol.223 , Issue.8 , pp. 995-1003
    • Munguía, J.1    Ciurana, J.2    Riba, C.3
  • 15
    • 53349090818 scopus 로고    scopus 로고
    • Stereolithography build time estimation based on volumetric calculation
    • 10.1108/13552540810907938
    • I Campbell J Combrink D de Beer L Barnard 2008 Stereolithography build time estimation based on volumetric calculation Rapid Prototyping J 14 5 271 279 10.1108/13552540810907938
    • (2008) Rapid Prototyping J , vol.14 , Issue.5 , pp. 271-279
    • Campbell, I.1    Combrink, J.2    De Beer, D.3    Barnard, L.4
  • 16
    • 78650396691 scopus 로고    scopus 로고
    • Build time estimator for determining optimal part orientation
    • 10.1243/09544054JEM1913
    • AS Nezhad M Vatani F Barazandeh A Rahimi 2010 Build time estimator for determining optimal part orientation Proc Inst Mech Eng B J Eng Manuf 224 12 1905 1913 10.1243/09544054JEM1913
    • (2010) Proc Inst Mech Eng B J Eng Manuf , vol.224 , Issue.12 , pp. 1905-1913
    • Nezhad, A.S.1    Vatani, M.2    Barazandeh, F.3    Rahimi, A.4
  • 17
    • 33847174670 scopus 로고    scopus 로고
    • Price quotation methodology for stereolithography parts based on STL model
    • DOI 10.1016/j.cie.2006.12.005, PII S0360835206002105
    • HB Lan YC Ding 2007 Price quotation methodology for stereolithography parts based on STL model Comput Ind Eng 52 2 241 256 10.1016/j.cie.2006.12.005 (Pubitemid 46282346)
    • (2007) Computers and Industrial Engineering , vol.52 , Issue.2 , pp. 241-256
    • Lan, H.1    Ding, Y.2
  • 19
    • 0042091884 scopus 로고    scopus 로고
    • A review of rapid prototyping technologies and systems
    • DOI 10.1016/0010-4485(95)00035-6
    • X Yan P Gu 1996 A review of rapid prototyping technologies and systems Comput-Aided Des 28 4 307 318 10.1016/0010-4485(95)00035-6 (Pubitemid 126403899)
    • (1996) CAD Computer Aided Design , vol.28 , Issue.4 , pp. 307-318
    • Yan, X.1    Gu, P.2
  • 22
    • 77951136769 scopus 로고    scopus 로고
    • Parametric cost analysis for WEB based e-commerce of layer manufactured object
    • 10.1080/00207540802183653
    • L Di Angelo P Di Stefano 2010 Parametric cost analysis for WEB based e-commerce of layer manufactured object Int J Prod Res 48 7 2127 2140 10.1080/00207540802183653
    • (2010) Int J Prod Res , vol.48 , Issue.7 , pp. 2127-2140
    • Di Angelo, L.1    Di Stefano, P.2
  • 24
    • 14844354357 scopus 로고    scopus 로고
    • The training of neural networks to model manufacturing processes
    • DOI 10.1007/s10845-005-4823-7
    • W Sukthomya J Tannock 2005 The training of neural networks to model manufacturing processes J Intell Manuf 16 39 51 10.1007/s10845-005-4823-7 (Pubitemid 40356754)
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.1 , pp. 39-51
    • Sukthomya, W.1    Tannock, J.2
  • 26
    • 0037474521 scopus 로고    scopus 로고
    • Selection of training samples for model updating using neural networks
    • 10.1006/jsvi.2001.3915
    • CC Chang TYP Chang YG Xu WM To 2002 Selection of training samples for model updating using neural networks J Sound Vib 249 5 867 883 10.1006/jsvi.2001.3915
    • (2002) J Sound Vib , vol.249 , Issue.5 , pp. 867-883
    • Chang, C.C.1    Chang, T.Y.P.2    Xu, Y.G.3    To, W.M.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.