3
-
-
40849142091
-
A genetic algorithm for the resource constrained multi-project scheduling problem
-
DOI 10.1016/j.ejor.2006.06.074, PII S0377221707005929
-
Goncalves J. F., Mendes, J. J. M. and Resende, M. G. C. A genetic algorithm for the resource constrained multi-project scheduling problem, European Journal of Operational Research, 2008, 189(3): 1171-1190. (Pubitemid 351400562)
-
(2008)
European Journal of Operational Research
, vol.189
, Issue.3
, pp. 1171-1190
-
-
Goncalves, J.F.1
Mendes, J.J.M.2
Resende, M.G.C.3
-
4
-
-
77957777989
-
A new approach to solving coupled task sets based on resource balance strategy in product development
-
Xiao R. B., Chen T. G. and Chen W. M. A new approach to solving coupled task sets based on resource balance strategy in product development, International Journal of Material and Product Technology, 2010, 39(3-4): 251-270.
-
(2010)
International Journal of Material and Product Technology
, vol.39
, Issue.3-4
, pp. 251-270
-
-
Xiao, R.B.1
Chen, T.G.2
Chen, W.M.3
-
5
-
-
84901433127
-
An artificial immune network for multimodal function optimization
-
Hawaii, USA, May
-
De Castro L. N. and Timmis J. I. An artificial immune network for multimodal function Optimization, In: Proceedings of the IEEE Congress on Evolutionary Computation, Hawaii, USA, May, 2002, pp. 699-704.
-
(2002)
Proceedings of the IEEE Congress on Evolutionary Computation
, pp. 699-704
-
-
De Castro, L.N.1
Timmis, J.I.2
-
6
-
-
23044474987
-
Optimal synthesis of mechanisms for path generation using refined numerical representation based model and AIS based searching method
-
DOI 10.1115/1.1898342
-
Liu Y. and Xiao, R. B. Optimal synthesis of mechanisms for path generation using refined numerical representation based model and AIS based searching method, Journal of Mechanical Design, 2005, 127(4): 688-691. (Pubitemid 41064225)
-
(2005)
Journal of Mechanical Design, Transactions of the ASME
, vol.127
, Issue.4
, pp. 688-691
-
-
Liu, Y.1
Xiao, R.2
-
7
-
-
35148821762
-
A powerful and efficient algorithm for numerical function optimization: Artificial bee colony (ABC) algorithm
-
DOI 10.1007/s10898-007-9149-x
-
Karaboga D. and Basturk B. A powerful and efficient algorithm for numerical function optimization: artificial bee colony (ABC) algorithm, Journal of Global Optimization, 2007, 39(3): 459-471. (Pubitemid 47551831)
-
(2007)
Journal of Global Optimization
, vol.39
, Issue.3
, pp. 459-471
-
-
Karaboga, D.1
Basturk, B.2
-
8
-
-
34548479029
-
On the performance of artificial bee colony (ABC) algorithm
-
DOI 10.1016/j.asoc.2007.05.007, PII S1568494607000531
-
Karaboga D. and Basturk B. On the performance of artificial bee colony (ABC) algorithm, Applied Soft Computing, 2008, 8(1): 687-697. (Pubitemid 47374599)
-
(2008)
Applied Soft Computing Journal
, vol.8
, Issue.1
, pp. 687-697
-
-
Karaboga, D.1
Basturk, B.2
-
9
-
-
0022025928
-
Multi-project scheduling: Analysis of project performance
-
Kurtulus I. S. and Narula S. C., Multi-project scheduling: analysis of project performance, IIE Transactions, 1985, 17(1): 58-66.
-
(1985)
IIE Transactions
, vol.17
, Issue.1
, pp. 58-66
-
-
Kurtulus, I.S.1
Narula, S.C.2
-
10
-
-
78650903054
-
An artificial immune network approach to multi-sensor land use/land cover classification
-
Gong B. Im J. and Mountrakis G. An artificial immune network approach to multi-sensor land use/land cover classification, Remote Sensing of Environment, 2011, 115(2): 600-614.
-
(2011)
Remote Sensing of Environment
, vol.115
, Issue.2
, pp. 600-614
-
-
Gong, B.1
Im, J.2
Mountrakis, G.3
-
11
-
-
0011717163
-
Toward the development of a complete multi-project scheduling system
-
Fendley L. G. Toward the development of a complete multi-project scheduling system, Journal of Industrial Engineering, 1968, 19(10): 505-515.
-
(1968)
Journal of Industrial Engineering
, vol.19
, Issue.10
, pp. 505-515
-
-
Fendley, L.G.1
-
12
-
-
0000698758
-
Characterization and generation of a general class of resource constrained project scheduling problems
-
Kolisch R., Sprecher, A. and Drexl, A. Characterization and generation of a general class of resource constrained project scheduling problems, Management Science, 1995, 41(10): 1693-1703.
-
(1995)
Management Science
, vol.41
, Issue.10
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
|