메뉴 건너뛰기




Volumn , Issue , 2011, Pages

Protection algorithm for a wind turbine generator in a large wind farm

Author keywords

Delayed operation; Instantaneous operation; Non operation; Outage section minimization; Wind turbine generator protection

Indexed keywords

DELAYED OPERATION; EMTP-RV; FAULT SCENARIOS; FEEDER FAULTS; GRID FAULT; INSTANTANEOUS OPERATION; INTERNAL FAULTS; NEGATIVE-SEQUENCE CURRENTS; NON-OPERATION; PHASE ANGLES; PROTECTION ALGORITHMS; SEQUENCE CURRENT; WIND FARM; WIND TURBINE GENERATOR PROTECTION;

EID: 80053345917     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PTC.2011.6019337     Document Type: Conference Paper
Times cited : (2)

References (7)
  • 1
    • 0032641694 scopus 로고    scopus 로고
    • Design and field testing of a source based protection relay for wind farms
    • Jul.
    • S. J. Haslam, P. A. Crossley, and N. Jenkins, "Design and field testing of a source based protection relay for wind farms," IEEE Trans. on Power Deliv., Vol. 14, No. 3, pp. 818-823, Jul. 1999.
    • (1999) IEEE Trans. on Power Deliv. , vol.14 , Issue.3 , pp. 818-823
    • Haslam, S.J.1    Crossley, P.A.2    Jenkins, N.3
  • 2
    • 0032661733 scopus 로고    scopus 로고
    • Design and evaluation of a wind farm protection relay
    • Jan.
    • S. J. Haslam, P. A. Crossley, and N. Jenkins, "Design and evaluation of a wind farm protection relay," IEE Proc. -Gener. Transm. Distrib., Vol. 146, No. 1, pp. 37-44, Jan. 1999.
    • (1999) IEE Proc. -Gener. Transm. Distrib. , vol.146 , Issue.1 , pp. 37-44
    • Haslam, S.J.1    Crossley, P.A.2    Jenkins, N.3
  • 3
    • 33947658982 scopus 로고    scopus 로고
    • Adaptive distance relay setting for lines connecting wind farms
    • Mar.
    • A. K. Pradhan, and Géza Joós, "Adaptive distance relay setting for lines connecting wind farms," IEEE Trans. on Energy Conversion, Vol. 22, No. 1, pp. 206-213, Mar. 2007.
    • (2007) IEEE Trans. on Energy Conversion , vol.22 , Issue.1 , pp. 206-213
    • Pradhan, A.K.1    Joós, G.2
  • 4
    • 79960819767 scopus 로고    scopus 로고
    • GE Multilin. [online]. Available
    • GE Consumer & Industrial Multilin, W650-Wind generator protection system instruction manuals, 2006 GE Multilin. [online]. Available: http://www.gedigitalenergy.com/app/ViewFiles.aspx?prod=w650&type=3
    • (2006) W650-Wind Generator Protection System Instruction Manuals
  • 5
    • 84882960480 scopus 로고    scopus 로고
    • [online]. Available
    • Schweitzer Engineering Laboratories, SEL-700GW wind generator relay. [online]. Available: http://www.selinc.com/sel-700gw/
    • SEL-700GW Wind Generator Relay
  • 7
    • 80053360594 scopus 로고    scopus 로고
    • Wind power plant substation and collector system redundancy, reliability, and economics
    • Wind Plant Collector Design WG
    • Wind Plant Collector Design WG, "Wind power plant substation and collector system redundancy, reliability, and economics," in Proc. 2009 IEEE Power and Energy Society General Meeting, Calgary, Canada, Jul. 2009.
    • Proc. 2009 IEEE Power and Energy Society General Meeting, Calgary, Canada, Jul. 2009


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.