-
1
-
-
0021623440
-
Travel-time models for automated storage/retrieval systems
-
Y.A. Bozer, and J.A. White Travel-time models for automated storage/retrieval systems IIE Transactions 16 4 1984 329 338
-
(1984)
IIE Transactions
, vol.16
, Issue.4
, pp. 329-338
-
-
Bozer, Y.A.1
White, J.A.2
-
2
-
-
0029254325
-
The impact of acceleration deceleration on travel-time models for automated storage-retrieval systems
-
D.T. Chang, U.P. Wen, and J.T. Lin The impact of acceleration deceleration on travel-time models for automated storage-retrieval systems IIE Transactions 27 1 1995 108 111
-
(1995)
IIE Transactions
, vol.27
, Issue.1
, pp. 108-111
-
-
Chang, D.T.1
Wen, U.P.2
Lin, J.T.3
-
4
-
-
80053182909
-
-
Federation Européenne de la Manutention, Section IX, Series Lifting Equipment 02.2001 (E)
-
Federation Européenne de la Manutention, Section IX, Series Lifting Equipment, Normativa FEM 9851: Performance Data of S/R Machines Cycle Times. 02.2001 (E).
-
Normativa FEM 9851: Performance Data of S/R Machines Cycle Times
-
-
-
5
-
-
40649106739
-
Performance analysis of single shuttle and twin shuttle AS/RS
-
Guo, S.; Liu, T.; 2007. Performance analysis of single shuttle and twin shuttle AS/RS. In Proceedings of the 2007 IEEE IEEEM.
-
(2007)
Proceedings of the 2007 IEEE IEEEM
-
-
Guo, S.1
Liu, T.2
-
6
-
-
50749133946
-
Using simulation to compare different automated storage/retrieval system designs
-
A. Houshyar, and I. Chung Using simulation to compare different automated storage/retrieval system designs Computers & Industrial Engineering. 21 1-4 1991 629 633
-
(1991)
Computers & Industrial Engineering.
, vol.21
, Issue.14
, pp. 629-633
-
-
Houshyar, A.1
Chung, I.2
-
9
-
-
0028741630
-
Analysis of dual-shuttle automated storage/retrieval systems
-
A. Keserla, and B.A. Peters Analysis of dual-shuttle automated storage/retrieval systems Journal of Manufacturing Systems. 13 6 1994 424 434
-
(1994)
Journal of Manufacturing Systems.
, vol.13
, Issue.6
, pp. 424-434
-
-
Keserla, A.1
Peters, B.A.2
-
10
-
-
0025661390
-
A framework for the exact evaluation of expected cycle times in automated storage systems with full-turnover item allocation and random service requests
-
J. Kim, and A. Seidmann A framework for the exact evaluation of expected cycle times in automated storage systems with full-turnover item allocation and random service requests Computers & Industrial Engineering. 18 4 1990 601 612
-
(1990)
Computers & Industrial Engineering.
, vol.18
, Issue.4
, pp. 601-612
-
-
Kim, J.1
Seidmann, A.2
-
11
-
-
0036721871
-
Travel time model for the warehousing system with a tower crane S/R machine
-
DOI 10.1016/S0360-8352(02)00122-5, PII S0360835202001225
-
S.G. Koh, B.S. Kim, and B.N. Kim Travel time model for the warehousing system with a tower crane S/R machine Computers & Industrial Engineering. 43 2002 495 507 (Pubitemid 34772207)
-
(2002)
Computers and Industrial Engineering
, vol.43
, Issue.3
, pp. 495-507
-
-
Koh, S.G.1
Kim, B.S.2
Kim, B.N.3
-
12
-
-
0025661040
-
An expert system framework for automated storage and retrieval system control
-
R.J. Linn, and R.A. Wysk An expert system framework for automated storage and retrieval system control Computers & Industrial Engineering. 18 1 1990 37 48
-
(1990)
Computers & Industrial Engineering.
, vol.18
, Issue.1
, pp. 37-48
-
-
Linn, R.J.1
Wysk, R.A.2
-
13
-
-
0031251499
-
Cycle-time computation, and dedicated storage assignment, for AS/R systems
-
M. Mansuri Cycle-time computation, and dedicated storage assignment, for AS/R systems Computers & Industrial Engineering. 33 1-2 1997 307 310
-
(1997)
Computers & Industrial Engineering.
, vol.33
, Issue.12
, pp. 307-310
-
-
Mansuri, M.1
-
14
-
-
0343559857
-
Multi-shuttle automated storage/retrieval systems
-
Department of Industrial Engineering, Auburn University
-
Meller, R. D.; Mungwattana, A.; 1995. Multi-shuttle automated storage/retrieval systems. Technical report 95-06, Department of Industrial Engineering, Auburn University.
-
(1995)
Technical Report 95-06
-
-
Meller, R.D.1
Mungwattana, A.2
-
17
-
-
0029196272
-
Simulation-based design evaluation of unit load automated storage/retrieval systems
-
S.U. Randhawa, and R. Shroff Simulation-based design evaluation of unit load automated storage/retrieval systems Computers & Industrial Engineering 28 1 1995 71 79
-
(1995)
Computers & Industrial Engineering
, vol.28
, Issue.1
, pp. 71-79
-
-
Randhawa, S.U.1
Shroff, R.2
-
19
-
-
0033904107
-
Warehouse design and control: Framework and literature review
-
DOI 10.1016/S0377-2217(99)00020-X
-
B. Rouwenhrst, B. Reuter, V. Stockrahm, G.J. van Houtum, R.J. Mantel, and W.H.M. Zijm Warehouse design and control: Framework and literature review European Journal of Operational Research 122 2000 515 533 (Pubitemid 30558884)
-
(2000)
European Journal of Operational Research
, vol.122
, Issue.3
, pp. 515-533
-
-
Rouwenhorst, B.1
Reuter, B.2
Stockrahm, V.3
Van Houtum, G.J.4
Mantel, R.J.5
Zijm, W.H.M.6
-
20
-
-
0345728125
-
Performance evaluation of a double shuttle automated storage and retrieval system
-
B.R. Sarker, A. Sabapathy, A.M. Lal, and M.H. Han Performance evaluation of a double shuttle automated storage and retrieval system Production Planning & Control 2 3 1991 207 213
-
(1991)
Production Planning & Control
, vol.2
, Issue.3
, pp. 207-213
-
-
Sarker, B.R.1
Sabapathy, A.2
Lal, A.M.3
Han, M.H.4
-
21
-
-
0000232214
-
Travel time models in automated storage/retrieval systems: A critical review
-
B.R. Sarker, and P.S. Babu Travel time models in automated storage/retrieval systems: A critical review International Journal of Production Economics 40 1995 173 184
-
(1995)
International Journal of Production Economics
, vol.40
, pp. 173-184
-
-
Sarker, B.R.1
Babu, P.S.2
|