메뉴 건너뛰기




Volumn 61, Issue 3, 2011, Pages 739-743

An effective neighborhood search algorithm for scheduling a flow shop of batch processing machines

Author keywords

Batch processing machines; Flow shop scheduling; Neighborhood search; Permutation

Indexed keywords

BATCH PROCESSING MACHINE; COMPUTATIONAL RESULTS; FLOW-SHOP SCHEDULING; FLOW-SHOPS; MAXIMUM LATENESS; NEIGHBORHOOD SEARCH; NEIGHBORHOOD SEARCH ALGORITHMS; NEW SOLUTIONS; PERMUTATION; SCHEDULING PROBLEM; SUB-PROBLEMS;

EID: 80053211943     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2011.05.005     Document Type: Article
Times cited : (20)

References (13)
  • 2
    • 18144395484 scopus 로고    scopus 로고
    • Mixed integer formulation to minimize makespan in a flow shop with batch processing machines
    • DOI 10.1016/j.mcm.2005.01.005, PII S0895717705000063
    • P. Damodaran, and K. Srihari Mixed integer formulation to minimize makespan in a flow shop with batch processing machines Mathematical and Computer Modelling 40 2004 1465 1472 (Pubitemid 40607890)
    • (2004) Mathematical and Computer Modelling , vol.40 , Issue.13 , pp. 1465-1472
    • Damodaran, P.1    Srihari, K.2
  • 4
    • 59749098192 scopus 로고    scopus 로고
    • An improved mixed integer linear formulation and lower bounds for minimizing makespan on a flow shop with batch processing machines
    • A.H. Kashan, and B. Karimi An improved mixed integer linear formulation and lower bounds for minimizing makespan on a flow shop with batch processing machines International Journal of Advanced Manufacturing Technology 40 2009 582 594
    • (2009) International Journal of Advanced Manufacturing Technology , vol.40 , pp. 582-594
    • Kashan, A.H.1    Karimi, B.2
  • 5
    • 78649458370 scopus 로고    scopus 로고
    • Variable neighborhood search for minimizing tardiness objectives on flow shop with batch processing machines
    • D.M. Lei, and X.P. Guo Variable neighborhood search for minimizing tardiness objectives on flow shop with batch processing machines International Journal of Production Research 49 2011 519 529
    • (2011) International Journal of Production Research , vol.49 , pp. 519-529
    • Lei, D.M.1    Guo, X.P.2
  • 7
    • 79751538046 scopus 로고    scopus 로고
    • Tabu search heuristic for two-machine flow shop with batch processing machines
    • in press
    • Liao, L. M.; & Huang, C. J. (in press). Tabu search heuristic for two-machine flow shop with batch processing machines. Computers and Industrial Engineering.
    • Computers and Industrial Engineering
    • Liao, L.M.1    Huang, C.J.2
  • 8
  • 10
    • 33748750428 scopus 로고    scopus 로고
    • Makespan minimization in a no-wait flow shop problem with two batching machines
    • DOI 10.1016/j.cor.2005.05.028, PII S0305054805001735
    • A. Oulamara Makespan minimization in a no-wait flow shop problem with two batching machines Computers and Operations Research 34 2007 1033 1050 (Pubitemid 44402890)
    • (2007) Computers and Operations Research , vol.34 , Issue.4 , pp. 1033-1050
    • Oulamara, A.1
  • 11
    • 0343517592 scopus 로고    scopus 로고
    • Problem reduction and decomposition approach for scheduling for a flowshop of batch processing machines
    • DOI 10.1016/S0377-2217(99)00031-4
    • C.S. Sung, Y.H. Kim, and S.H. Yoon A problem reduction and decomposition approach for scheduling for a flowshop of batch processing machines European Journal of Operational Research 121 2000 179 192 (Pubitemid 30546354)
    • (2000) European Journal of Operational Research , vol.121 , Issue.1 , pp. 179-192
    • Sung, C.S.1    Kim, Y.H.2    Yoon, S.H.3
  • 12
    • 0035341619 scopus 로고    scopus 로고
    • Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date
    • DOI 10.1016/S0377-2217(99)00447-6
    • C.S. Sung, and J.I. Min Scheduling in a two-machine flowshop with batch processing machines for earliness/tardiness measure under a common due date European Journal of Operational Research 131 2001 95 106 (Pubitemid 32264918)
    • (2001) European Journal of Operational Research , vol.131 , Issue.1 , pp. 95-106
    • Sung, C.S.1    Min, J.I.2
  • 13
    • 58849164121 scopus 로고    scopus 로고
    • Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines
    • A.D. Yimer, and K. Demirli Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines International Journal of Approximate Reasoning 50 2009 117 137
    • (2009) International Journal of Approximate Reasoning , vol.50 , pp. 117-137
    • Yimer, A.D.1    Demirli, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.