-
1
-
-
0032002538
-
Decomposition of arbitrarily shaped binary morphological structuring elements using genetic algorithms
-
Anelli G., Broggi A., Destri G. Decomposition of arbitrarily shaped binary morphological structuring elements using genetic algorithms. IEEE Trans Pattern Anal Mach Intell 1998, 20(2):217-224.
-
(1998)
IEEE Trans Pattern Anal Mach Intell
, vol.20
, Issue.2
, pp. 217-224
-
-
Anelli, G.1
Broggi, A.2
Destri, G.3
-
2
-
-
0035367618
-
Solving nonlinear water management models using a combined genetic algorithm and linear programming approach
-
Cai X., McKinney D.C., Lasdon L.S. Solving nonlinear water management models using a combined genetic algorithm and linear programming approach. Adv Water Resour 2001, 24(6):667-676.
-
(2001)
Adv Water Resour
, vol.24
, Issue.6
, pp. 667-676
-
-
Cai, X.1
McKinney, D.C.2
Lasdon, L.S.3
-
3
-
-
43449094328
-
Guiding rational reservoir flood operation using penalty-type genetic algorithm
-
Chang L.C. Guiding rational reservoir flood operation using penalty-type genetic algorithm. J Hydrol 2008, 354:65-74.
-
(2008)
J Hydrol
, vol.354
, pp. 65-74
-
-
Chang, L.C.1
-
4
-
-
77955266443
-
Constrained genetic algorithms for optimizing multi-use reservoir operation
-
Chang L.C., Chang F.J., Wang K.W., Dai S.Y. Constrained genetic algorithms for optimizing multi-use reservoir operation. J Hydrol 2010, 390:66-74.
-
(2010)
J Hydrol
, vol.390
, pp. 66-74
-
-
Chang, L.C.1
Chang, F.J.2
Wang, K.W.3
Dai, S.Y.4
-
5
-
-
43649092022
-
Intelligent reservoir operation system based on evolving artificial neural networks
-
Chaves P., Chang F.J. Intelligent reservoir operation system based on evolving artificial neural networks. Adv Water Resour 2008, 31:926-936.
-
(2008)
Adv Water Resour
, vol.31
, pp. 926-936
-
-
Chaves, P.1
Chang, F.J.2
-
6
-
-
60549091177
-
Evolutionary artificial neural networks for hydrological systems forecasting
-
Chen Y.H., Chang F.J. Evolutionary artificial neural networks for hydrological systems forecasting. J Hydrol 2009, 367:125-137.
-
(2009)
J Hydrol
, vol.367
, pp. 125-137
-
-
Chen, Y.H.1
Chang, F.J.2
-
7
-
-
36148976159
-
Using a hybrid genetic algorithm-simulated annealing algorithm for fuzzy programming of reservoir operation
-
Chiu Y.C., Chang L.C., Chang F.J. Using a hybrid genetic algorithm-simulated annealing algorithm for fuzzy programming of reservoir operation. Hydrol Process 2007, 21:3162-3172.
-
(2007)
Hydrol Process
, vol.21
, pp. 3162-3172
-
-
Chiu, Y.C.1
Chang, L.C.2
Chang, F.J.3
-
8
-
-
38549091692
-
A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem
-
Debels D., Vanhoucke M. A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem. Oper Res 2007, 55(3):457-469.
-
(2007)
Oper Res
, vol.55
, Issue.3
, pp. 457-469
-
-
Debels, D.1
Vanhoucke, M.2
-
9
-
-
0003722376
-
-
Addison-Wesley, Reading, MA
-
Goldberg D.E. Genetic algorithms in search, optimization, and machine learning 1989, Addison-Wesley, Reading, MA. 2nd ed.
-
(1989)
Genetic algorithms in search, optimization, and machine learning
-
-
Goldberg, D.E.1
-
10
-
-
0021892558
-
Algorithms for optimizing hydropower system operation
-
Grygier T.C., Stedinger J.R. Algorithms for optimizing hydropower system operation. Water Resour Res 1985, 21(1):1-10.
-
(1985)
Water Resour Res
, vol.21
, Issue.1
, pp. 1-10
-
-
Grygier, T.C.1
Stedinger, J.R.2
-
12
-
-
0013725829
-
Real-time daily reservoir operation by mathematical programming
-
Houcks M.H. Real-time daily reservoir operation by mathematical programming. Water Resour Res 1982, 16(1):196-200.
-
(1982)
Water Resour Res
, vol.16
, Issue.1
, pp. 196-200
-
-
Houcks, M.H.1
-
13
-
-
0037001676
-
Linking genetic algorithms with stochastic dynamic programming to the long-term operation of a multireservoir system
-
40.1-9
-
Huang W.C., Yuang L.C., Lee C.M. Linking genetic algorithms with stochastic dynamic programming to the long-term operation of a multireservoir system. Water Resour Res 2002, 38(12). p. 40.1-9.
-
(2002)
Water Resour Res
, vol.38
, Issue.12
-
-
Huang, W.C.1
Yuang, L.C.2
Lee, C.M.3
-
14
-
-
0038321354
-
Genetic algorithms with decomposition procedures for multidimensional 0-1 knapsack problems with block angular structures
-
Kato K., Sakawa M. Genetic algorithms with decomposition procedures for multidimensional 0-1 knapsack problems with block angular structures. IEEE Trans Syst Man Cybernet - Part B: Cybernet 2003, 33(3):410-419.
-
(2003)
IEEE Trans Syst Man Cybernet - Part B: Cybernet
, vol.33
, Issue.3
, pp. 410-419
-
-
Kato, K.1
Sakawa, M.2
-
15
-
-
10044223342
-
-
A GA-based approach for scheduling decomposable data grid applications. In: Proceedings of the 2004 international conference on parallel processing;
-
Kim S, Weissman JB. A GA-based approach for scheduling decomposable data grid applications. In: Proceedings of the 2004 international conference on parallel processing; 2003.
-
(2003)
-
-
Kim, S.1
Weissman, J.B.2
-
16
-
-
0003715857
-
-
Prentice-Hall, New Jersey
-
Loucks D.P., Stedinger J.R., Haith D.A. Water resources systems planning and management 1981, Prentice-Hall, New Jersey, p. 320-32.
-
(1981)
Water resources systems planning and management
, pp. 320-32
-
-
Loucks, D.P.1
Stedinger, J.R.2
Haith, D.A.3
-
17
-
-
84873009833
-
Exploiting block structure to improve resource-constrained project schedules
-
Kluwer, F. Glover, I. Osman, J. Kelley (Eds.)
-
Mausser H.E., Lawrence S.R. Exploiting block structure to improve resource-constrained project schedules. Metaheuristics 1995: state of the art 1995, Kluwer. F. Glover, I. Osman, J. Kelley (Eds.).
-
(1995)
Metaheuristics 1995: state of the art
-
-
Mausser, H.E.1
Lawrence, S.R.2
-
19
-
-
4444294743
-
LSSPER: solving the resource-constrained project scheduling problem with large neighbourhood search
-
Palpant M., Artigues C., Michelon P. LSSPER: solving the resource-constrained project scheduling problem with large neighbourhood search. Ann Oper Res 2004, 131:237-257.
-
(2004)
Ann Oper Res
, vol.131
, pp. 237-257
-
-
Palpant, M.1
Artigues, C.2
Michelon, P.3
-
20
-
-
0038504801
-
An improved algorithm for hydropower optimization
-
Reznicek K.K., Simonovic S.P. An improved algorithm for hydropower optimization. Water Resour Res 1990, 26(2):189-198.
-
(1990)
Water Resour Res
, vol.26
, Issue.2
, pp. 189-198
-
-
Reznicek, K.K.1
Simonovic, S.P.2
-
21
-
-
80052828337
-
-
Managing water resources: methods and tools for a systems approach. London: UNESCO, Paris and Earthscan James & James;
-
Simonovic SP. Managing water resources: methods and tools for a systems approach. London: UNESCO, Paris and Earthscan James & James; 2009.
-
(2009)
-
-
Simonovic, S.P.1
-
22
-
-
0024431968
-
An improved methodology for short-term operation of a single multipurpose reservoir
-
Simonovic S.P., Burn D.H. An improved methodology for short-term operation of a single multipurpose reservoir. Water Resour Res 1989, 25(1):1-8.
-
(1989)
Water Resour Res
, vol.25
, Issue.1
, pp. 1-8
-
-
Simonovic, S.P.1
Burn, D.H.2
-
23
-
-
0036531774
-
Network decomposition techniques for resource constrained project scheduling
-
Sprecher A. Network decomposition techniques for resource constrained project scheduling. J Oper Res Soc 2002, 53(4):405-414.
-
(2002)
J Oper Res Soc
, vol.53
, Issue.4
, pp. 405-414
-
-
Sprecher, A.1
-
24
-
-
33646507305
-
Reservoir management to balance ecosystem and human needs: incorporating the paradigm of the ecological flow regime
-
Suen J.P., Eheart J.W. Reservoir management to balance ecosystem and human needs: incorporating the paradigm of the ecological flow regime. Water Resour Res 2006, 42(3):W03417.
-
(2006)
Water Resour Res
, vol.42
, Issue.3
-
-
Suen, J.P.1
Eheart, J.W.2
-
25
-
-
0022268780
-
Reservoir management and operation models: a state-of-the-art review
-
Yeh W.W.-G. Reservoir management and operation models: a state-of-the-art review. Water Resour Res 1985, 21(12):1797-1818.
-
(1985)
Water Resour Res
, vol.21
, Issue.12
, pp. 1797-1818
-
-
Yeh, W.W.-G.1
|