메뉴 건너뛰기




Volumn 39, Issue 10, 2011, Pages 6168-6177

Project finance risk evaluation of the Electric power industry of Serbia

Author keywords

Electric power industry; FMEA; Project finance risk

Indexed keywords

DEBT COLLECTION; ELECTRIC POWER INDUSTRIES; ENERGY SECTOR; FAILURE MODE AND EFFECTS ANALYSIS; FMEA; ON CURRENTS; PRICE RISKS; PROJECT ACTIVITIES; PROJECT FINANCE; PUBLIC ENTERPRISE; PUBLIC SECTOR; STRATEGIC INTEREST; STRATEGIC PARTNERS;

EID: 80052706339     PISSN: 03014215     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enpol.2011.07.017     Document Type: Article
Times cited : (34)

References (37)
  • 1
    • 41549152023 scopus 로고    scopus 로고
    • A decision support tool based on QFD and FMEA for the selection of manufacturing automation technologies
    • Almannai B., Greenough R., Kay J. A decision support tool based on QFD and FMEA for the selection of manufacturing automation technologies. Robotics and Computer-Integrated Manufacturing 2008, 24:501-507.
    • (2008) Robotics and Computer-Integrated Manufacturing , vol.24 , pp. 501-507
    • Almannai, B.1    Greenough, R.2    Kay, J.3
  • 4
    • 80052454317 scopus 로고    scopus 로고
    • Investigation of injury/illness data at a nuclear facility. Journal of Chemical Health and Safety, in press.
    • Cournoyer, M.E., Garcia, V.E., Gallegos, U.F., Wilburn, D.W., Investigation of injury/illness data at a nuclear facility. Journal of Chemical Health and Safety, in press. doi:10.1016/j.jchas.2010.11.008.
    • Cournoyer, M.E.1    Garcia, V.E.2    Gallegos, U.F.3    Wilburn, D.W.4
  • 5
    • 0029527545 scopus 로고
    • Financing the energy in developing countries
    • Dunkerley J. Financing the energy in developing countries. Energy Policy 1995, 23(11):929-939.
    • (1995) Energy Policy , vol.23 , Issue.11 , pp. 929-939
    • Dunkerley, J.1
  • 6
    • 80052732987 scopus 로고    scopus 로고
    • EBRD,.Transition Report 2004: Infrastructure in Transition. EBRD, London.
    • EBRD, 2004.Transition Report 2004: Infrastructure in Transition. EBRD, London.
    • (2004)
  • 7
    • 80052720086 scopus 로고    scopus 로고
    • EBRD, Transition Report 2008: Growth in Transition. EBRD, London.
    • EBRD, 2008.Transition Report 2008: Growth in Transition. EBRD, London.
    • (2008)
  • 8
    • 80052776384 scopus 로고    scopus 로고
    • EPS, The consolidated annual financial statements for, [Online]. Available: (accessed: 10 January 2010) (in Serbian).
    • EPS, The consolidated annual financial statements for, 2009. [Online]. Available: (accessed: 10 January 2010) (in Serbian). http://www.eps.rs/g_izvestaj/izvestaji%202010/Konsolidovani%20EPS%202009_Final.pdf.
    • (2009)
  • 12
    • 1442338659 scopus 로고    scopus 로고
    • Policy alternatives in reforming energy utilities in developing countries
    • Gabriele A. Policy alternatives in reforming energy utilities in developing countries. Energy Policy 2004, 32:1319-1337.
    • (2004) Energy Policy , vol.32 , pp. 1319-1337
    • Gabriele, A.1
  • 13
    • 80052749079 scopus 로고    scopus 로고
    • Harvard Business School Publishing Corporation, 3
    • Gary L. Managing Project Risk 2005, Harvard Business School Publishing Corporation, 3.
    • (2005) Managing Project Risk
    • Gary, L.1
  • 15
  • 16
    • 0036466940 scopus 로고    scopus 로고
    • Evaluating the risk of public private partnership for infrastructure projects
    • Grimsey D., Lewis M.K. Evaluating the risk of public private partnership for infrastructure projects. International Journal of Project Management 2002, 20:107-118.
    • (2002) International Journal of Project Management , vol.20 , pp. 107-118
    • Grimsey, D.1    Lewis, M.K.2
  • 17
    • 33750939029 scopus 로고    scopus 로고
    • Fuzzy inference to risk assessment on nuclear engineering systems
    • Guimaraes A.C.F., Lapa C.M.F. Fuzzy inference to risk assessment on nuclear engineering systems. Applied Soft Computing 2007, 7:17-28.
    • (2007) Applied Soft Computing , vol.7 , pp. 17-28
    • Guimaraes, A.C.F.1    Lapa, C.M.F.2
  • 18
    • 0032055682 scopus 로고    scopus 로고
    • Development and project financing of private power projects in developing countries: A case study of India
    • Gupta J.P., Sravat A.K. Development and project financing of private power projects in developing countries: A case study of India. International Journal of Project Management 1998, 16(2):99-105.
    • (1998) International Journal of Project Management , vol.16 , Issue.2 , pp. 99-105
    • Gupta, J.P.1    Sravat, A.K.2
  • 19
    • 58549114672 scopus 로고    scopus 로고
    • Electrifying integration: electricity production and the South East Europe regional energy market
    • Hooper E., Medvedev A. Electrifying integration: electricity production and the South East Europe regional energy market. Utility Policy 2009, 17:24-33.
    • (2009) Utility Policy , vol.17 , pp. 24-33
    • Hooper, E.1    Medvedev, A.2
  • 20
    • 79957682872 scopus 로고    scopus 로고
    • The influence of global crisis on the South East European countries. In: Conference Proceedings: Security in the Postmodern Environment, (in Serbian).
    • Jednak, J., Jednak, S., Jednak, D., 2009a. The influence of global crisis on the South East European countries. In: Conference Proceedings: Security in the Postmodern Environment, vol. 6, pp. 275-286 (in Serbian).
    • (2009) , vol.6 , pp. 275-286
    • Jednak, J.1    Jednak, S.2    Jednak, D.3
  • 22
    • 66349088629 scopus 로고    scopus 로고
    • Overcoming barriers to wind project finance in Australia
    • Kann S. Overcoming barriers to wind project finance in Australia. Energy Policy 2009, 37:3139-3148.
    • (2009) Energy Policy , vol.37 , pp. 3139-3148
    • Kann, S.1
  • 23
    • 79954802753 scopus 로고    scopus 로고
    • Regional electricity markets in Europe: focus on the energy community. Utilities Policy, in press. Available online 20 October
    • Karova, R.. Regional electricity markets in Europe: focus on the energy community. Utilities Policy, in press. Available online 20 October 2010. http://doi:10.1016/j.jup.2010.10.001.
    • (2010)
    • Karova, R.1
  • 25
    • 79957741446 scopus 로고    scopus 로고
    • Implementation of the concession mechanism for infrastructure development
    • Milosavljevic M., Benkovic S. Implementation of the concession mechanism for infrastructure development. Management 2010, 55:35-42.
    • (2010) Management , vol.55 , pp. 35-42
    • Milosavljevic, M.1    Benkovic, S.2
  • 26
    • 80052771088 scopus 로고    scopus 로고
    • Official Gazette of the Republic of Serbia. No. 84/2004. Energy law.
    • Official Gazette of the Republic of Serbia. No. 84/2004. 2004. Energy law.
    • (2004)
  • 27
    • 80052768528 scopus 로고    scopus 로고
    • Official Gazette of the Republic of Serbia. No. 17/07. Implementation Program of that Strategy for 2007-2012 Period.
    • Official Gazette of the Republic of Serbia. No. 17/07. 2007. Implementation Program of that Strategy for 2007-2012 Period.
    • (2007)
  • 28
    • 80052725035 scopus 로고    scopus 로고
    • Official Gazette of Republic of Serbia. No.35/05. Energy Sector Development Strategy of Republic of Serbia by (Online). Available: (accessed: 10 January 2010).
    • Official Gazette of Republic of Serbia. No.35/05. Energy Sector Development Strategy of Republic of Serbia by 2015 (Online). Available: (accessed: 10 January 2010). http://www.ssl-link.com/mre/cms/mestoZaUploadFajlove/.
    • (2015)
  • 29
    • 58549092251 scopus 로고    scopus 로고
    • Evaluating the evidence on electricity reform: lessons for the South East Europe (SEE) market
    • Pollitt M. Evaluating the evidence on electricity reform: lessons for the South East Europe (SEE) market. Utility Policy 2009, 17:13-23.
    • (2009) Utility Policy , vol.17 , pp. 13-23
    • Pollitt, M.1
  • 31
    • 38649123669 scopus 로고    scopus 로고
    • A systematic methodology for the creation of six sigma projects: a case study of semiconductor foundry
    • Su C.T., Chou C.J. A systematic methodology for the creation of six sigma projects: a case study of semiconductor foundry. Expert Systems with Applications 2008, 34(4):2693-2703.
    • (2008) Expert Systems with Applications , vol.34 , Issue.4 , pp. 2693-2703
    • Su, C.T.1    Chou, C.J.2
  • 32
    • 38349053327 scopus 로고    scopus 로고
    • Risk analysis of a biomass combustion process using MOSAR and FMEA methods
    • Thivel P.X., Bultel Y., Delpech F. Risk analysis of a biomass combustion process using MOSAR and FMEA methods. Journal of Hazardous Materials 2008, 151(1):221-231.
    • (2008) Journal of Hazardous Materials , vol.151 , Issue.1 , pp. 221-231
    • Thivel, P.X.1    Bultel, Y.2    Delpech, F.3
  • 34
    • 56949104832 scopus 로고    scopus 로고
    • Recent progress in safety assessments of Japanese water-cooled solid breeder test blanket module
    • Tsuru D., Enoeda M., Akiba M. Recent progress in safety assessments of Japanese water-cooled solid breeder test blanket module. Fusion Engineering and Design 2008, 83:1747-1752.
    • (2008) Fusion Engineering and Design , vol.83 , pp. 1747-1752
    • Tsuru, D.1    Enoeda, M.2    Akiba, M.3
  • 35
    • 0030828304 scopus 로고    scopus 로고
    • Renewable energy finance and projcet ownership
    • Wiser R.H. Renewable energy finance and projcet ownership. Energy Policy 1997, 25(1):15-27.
    • (1997) Energy Policy , vol.25 , Issue.1 , pp. 15-27
    • Wiser, R.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.