메뉴 건너뛰기




Volumn , Issue , 2011, Pages 440-445

Managing performance based logistics by balancing reliability and spare parts stocking

Author keywords

equipment availability; performance based contracting; reliability optimization; service parts logistics; total cost of ownership

Indexed keywords

AFTER-SALES SERVICES; ANALYTICAL MODEL; CAPITAL EQUIPMENTS; ORIGINAL EQUIPMENT MANUFACTURERS; PERFORMANCE BASED; PERFORMANCE DRIVERS; PERFORMANCE-BASED LOGISTICS; PRODUCT RELIABILITY; QUANTITATIVE APPROACH; RELIABILITY OPTIMIZATION; SERVICE PARTS LOGISTICS; SERVICE PROVIDER; SPARE PARTS; TOTAL COST OF OWNERSHIP; USAGE RATE;

EID: 80052344734     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICQR2MSE.2011.5976648     Document Type: Conference Paper
Times cited : (4)

References (16)
  • 1
    • 38549161835 scopus 로고    scopus 로고
    • U. S. Department of Defense, U. S. Department of Defense, Washington, D. C.
    • U. S. Department of Defense, DoD guide for achieving reliability, availability, and maintainability. U. S. Department of Defense, Washington, D. C., 2005 http://www.dote.osd.mil/reports/RAMGuide.pdf
    • (2005) DoD Guide for Achieving Reliability, Availability, and Maintainability
  • 2
    • 38549086460 scopus 로고    scopus 로고
    • Performance contracting in after-sales service supply chains
    • S. H. Kim, M. A. Cohen, and S. Netessine, "Performance contracting in after-sales service supply chains", Management Science, vol. 53, pp. 1843-1858, 2007.
    • (2007) Management Science , vol.53 , pp. 1843-1858
    • Kim, S.H.1    Cohen, M.A.2    Netessine, S.3
  • 3
    • 40249098895 scopus 로고    scopus 로고
    • Spares provisioning under performance-based logistics contract: Profit-centric approach
    • 2008
    • D. Nowicki, U. D. Kumar, H. J. Steudel, and D. Verma. 2008. "Spares provisioning under performance-based logistics contract: profit-centric approach", The Journal of the Operational Research Society, vol. 59, no. 3, pp. 342-352, 2008.
    • (2008) The Journal of the Operational Research Society , vol.59 , Issue.3 , pp. 342-352
    • Nowicki, D.1    Kumar, U.D.2    Steudel, H.J.3    Verma, D.4
  • 10
    • 79951485814 scopus 로고    scopus 로고
    • Government Accountability Office GAO, G. A. Office, Ed., Washington D. C.: Government Accountability Office
    • Government Accountability Office (GAO), Joint Strike Fighter Recent Decisions by Department of Defense Add to Program Risks, vol. GAO-08-388, G. A. Office, Ed., Washington D. C.: Government Accountability Office, 2008.
    • (2008) Joint Strike Fighter Recent Decisions by Department of Defense Add to Program Risks , vol.GAO-08-388
  • 12
    • 77649338719 scopus 로고    scopus 로고
    • Optimization of component reliability in the design phase of capital goods
    • K. B. Öner, G. P. Kiesmüller, and G. J. van Houtum,. "Optimization of component reliability in the design phase of capital goods", European Journal of Operational Research, vol. 205, no. 3, pp. 615-624, 2010.
    • (2010) European Journal of Operational Research , vol.205 , Issue.3 , pp. 615-624
    • Öner, K.B.1    Kiesmüller, G.P.2    Van Houtum, G.J.3
  • 13
    • 59049099709 scopus 로고    scopus 로고
    • Spare parts inventory control considering stochastic growth of an installed base
    • T. Jin and H. Liao, "Spare parts inventory control considering stochastic growth of an installed base", Computers & Industrial Engineering, vol. 56, pp. 452-460, 2009.
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 452-460
    • Jin, T.1    Liao, H.2
  • 16
    • 84989738069 scopus 로고
    • Multiechelon inventory systems with lateral supply
    • C. C. Sherbrooke, "Multiechelon inventory systems with lateral supply", Naval Research Logistics, vol. 39, no. 1, pp. 29-40, 1992.
    • (1992) Naval Research Logistics , vol.39 , Issue.1 , pp. 29-40
    • Sherbrooke, C.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.