메뉴 건너뛰기




Volumn 88, Issue 12, 2011, Pages 5056-5068

Development of a scalable infrastructure model for planning electricity generation and CO2 mitigation strategies under mandated reduction of GHG emission

Author keywords

Electricity generation; Infrastructure

Indexed keywords

CARBON DIOXIDE; CLIMATE CHANGE; ELECTRICITY; GREENHOUSE GASES; POWER PLANTS;

EID: 80052270222     PISSN: 03062619     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apenergy.2011.07.010     Document Type: Article
Times cited : (21)

References (15)
  • 1
    • 80052273534 scopus 로고    scopus 로고
    • Carbon dioxide capture and storage. IPCC special report;
    • Metz BD, De Coninck O, Loos H, Meyer M. Carbon dioxide capture and storage. IPCC special report; 2005.
    • (2005)
    • Metz, B.D.1    De Coninck, O.2    Loos, H.3    Meyer, M.4
  • 2
    • 80052262116 scopus 로고    scopus 로고
    • Navigating the numbers-greenhouse gas data and international climate policy. Report of the world resources institute;
    • Baumert K, Herzog T, Pershing J. Navigating the numbers-greenhouse gas data and international climate policy. Report of the world resources institute; 2005.
    • (2005)
    • Baumert, K.1    Herzog, T.2    Pershing, J.3
  • 3
    • 33947387930 scopus 로고    scopus 로고
    • 2
    • 2. Energy 2007, 32(7):1163-1176.
    • (2007) Energy , vol.32 , Issue.7 , pp. 1163-1176
    • Davison, J.1
  • 4
    • 71849108978 scopus 로고    scopus 로고
    • A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty
    • Chen W.T., et al. A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty. Appl Energy 2010, 87(3):1033-1047.
    • (2010) Appl Energy , vol.87 , Issue.3 , pp. 1033-1047
    • Chen, W.T.1
  • 5
    • 78149359356 scopus 로고    scopus 로고
    • Planning regional energy system in association with greenhouse gas mitigation under uncertainty
    • Li Y.P., Huang G.H., Chen X. Planning regional energy system in association with greenhouse gas mitigation under uncertainty. Appl Energy 2011, 88(3):599-611.
    • (2011) Appl Energy , vol.88 , Issue.3 , pp. 599-611
    • Li, Y.P.1    Huang, G.H.2    Chen, X.3
  • 6
    • 47749085551 scopus 로고    scopus 로고
    • Integrated capacity planning for electricity generation: a fuzzy environmental policy analysis approach
    • Nasiri F., Huang G. Integrated capacity planning for electricity generation: a fuzzy environmental policy analysis approach. Energy Sources Part B Econ Planning Policy 2008, 3(3):259-279.
    • (2008) Energy Sources Part B Econ Planning Policy , vol.3 , Issue.3 , pp. 259-279
    • Nasiri, F.1    Huang, G.2
  • 7
    • 43949146925 scopus 로고    scopus 로고
    • Greenhouse gas emission permit trading with different uncertainties in emission sources
    • Nahorski Z., Horabik J. Greenhouse gas emission permit trading with different uncertainties in emission sources. J Energy Eng 2008, 134(2):47-52.
    • (2008) J Energy Eng , vol.134 , Issue.2 , pp. 47-52
    • Nahorski, Z.1    Horabik, J.2
  • 8
    • 0036891469 scopus 로고    scopus 로고
    • Prospective analysis of beyond Kyoto climate policy: a sequential game framework
    • Císcar J.C., Soria A. Prospective analysis of beyond Kyoto climate policy: a sequential game framework. Energy Policy 2002, 30(15):1327-1335.
    • (2002) Energy Policy , vol.30 , Issue.15 , pp. 1327-1335
    • Císcar, J.C.1    Soria, A.2
  • 9
    • 79955901967 scopus 로고    scopus 로고
    • Development of a scalable and comprehensive infrastructure model for carbon dioxide utilization and disposal
    • Han J.-H., Lee I.-B. Development of a scalable and comprehensive infrastructure model for carbon dioxide utilization and disposal. Ind Eng Chem Res 2011, 50(10):6297-6315.
    • (2011) Ind Eng Chem Res , vol.50 , Issue.10 , pp. 6297-6315
    • Han, J.-H.1    Lee, I.-B.2
  • 11
    • 85020979333 scopus 로고    scopus 로고
    • National Energy Committee (NEC), the 1st national energy master plan the 3rd national energy committee report 2008;
    • National Energy Committee (NEC), the 1st national energy master plan the 3rd national energy committee report 2008; 2008.
    • (2008)
  • 12
    • 80052272342 scopus 로고    scopus 로고
    • Korea Electric Power COrporation (KEPCO), the monthly report on major electric power statistics;
    • Korea Electric Power COrporation (KEPCO), the monthly report on major electric power statistics; 2010. p. 377.
    • (2010) , pp. 377
  • 13
    • 0029499304 scopus 로고
    • The capacitated plant location problem
    • Sridharan R. The capacitated plant location problem. Eur J Operational Res 1995, 87(2):203-213.
    • (1995) Eur J Operational Res , vol.87 , Issue.2 , pp. 203-213
    • Sridharan, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.