메뉴 건너뛰기




Volumn , Issue , 2011, Pages 291-295

Application of gene expression programming on dynamic job shop scheduling problem

Author keywords

dynamic job shop scheduling; gene expression programming; release date; scheduling rule

Indexed keywords

COMPUTATIONAL EXPERIMENT; DECODING SCHEME; DYNAMIC JOB SHOP SCHEDULING; EFFICIENT SCHEDULING; ENCODING SCHEMES; GENE EXPRESSION PROGRAMMING; HIGH QUALITY; ON DYNAMICS; PROBLEM INSTANCES; RELEASE DATE; SCHEDULING PROBLEM; SCHEDULING RULE; SEARCH TECHNIQUE; SOLUTION QUALITY;

EID: 80052200698     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CSCWD.2011.5960088     Document Type: Conference Paper
Times cited : (20)

References (14)
  • 2
    • 17444371106 scopus 로고
    • Learning distributed reactive strategies by genetic programming for the general job shop problem
    • Dankel, D., Stewan, J. (Eds.), 5-6 May 1994 Pensacola Beach, Florida, USA. Florida: IEEE Press
    • Atlan, L., Bonnet, J., & Naillon, M. (1994). Learning distributed reactive strategies by genetic programming for the general job shop problem. In: Dankel, D., Stewan, J. (Eds.), Proceedings of The 7th annual Florida Artificial Intelligence Research Symposium, 5-6 May 1994 Pensacola Beach, Florida, USA. Florida: IEEE Press.
    • (1994) Proceedings of the 7th Annual Florida Artificial Intelligence Research Symposium
    • Atlan, L.1    Bonnet, J.2    Naillon, M.3
  • 3
    • 0005889739 scopus 로고    scopus 로고
    • Job-shop scheduling with genetic programming
    • Whitley, L.D., Goldberg, D.E. et al. (Eds.), 8-12 July 2000 Las Vegas, Nevada, USA. San Fransisco, CA, USA: Morgan Kaufmann
    • Miyashita, K. (2000). Job-shop scheduling with genetic programming. In: Whitley, L.D., Goldberg, D.E. et al. (Eds.), Proceedings of Genetic and Evolutionary Computation Conference (GECCO-2000), 8-12 July 2000 Las Vegas, Nevada, USA. San Fransisco, CA, USA: Morgan Kaufmann, pp. 505-512.
    • (2000) Proceedings of Genetic and Evolutionary Computation Conference (GECCO-2000) , pp. 505-512
    • Miyashita, K.1
  • 4
    • 78650266092 scopus 로고    scopus 로고
    • Evolving scheduling rules with gene expression programming for dynamic single-machine scheduling problems
    • Nie, L., Shao, X.Y., Gao, L., & Li, W.D. (2010). Evolving scheduling rules with gene expression programming for dynamic single-machine scheduling problems. International Journal of Advanced Manufacturing Technology, 50, 729-747.
    • (2010) International Journal of Advanced Manufacturing Technology , vol.50 , pp. 729-747
    • Nie, L.1    Shao, X.Y.2    Gao, L.3    Li, W.D.4
  • 5
    • 0347499408 scopus 로고    scopus 로고
    • Gene expression programming: A new adaptive algorithm for solving problems
    • Ferreira, C. (2001). Gene expression programming: a new adaptive algorithm for solving problems. Complex System, 13(2), 87-129.
    • (2001) Complex System , vol.13 , Issue.2 , pp. 87-129
    • Ferreira, C.1
  • 7
    • 34548085379 scopus 로고    scopus 로고
    • Introduction to genetic programming
    • DOI 10.1145/1274000.1274116, Proceedings of GECCO 2007: Genetic and Evolutionary Computation Conference, Companion Material
    • Koza, J.R. (2007). Introduction to genetic programming. In: Lipson, H. (Eds.), Proceedings of GECCO 2007: Genetic and Evolutionary Computation Conference, 7-11 July 2007 London, England, UK. London: ACM Press, pp.3323-3365. (Pubitemid 47291119)
    • (2007) Proceedings of GECCO 2007: Genetic and Evolutionary Computation Conference, Companion Material , pp. 3323-3365
    • Koza, J.R.1
  • 8
    • 0036003024 scopus 로고    scopus 로고
    • Gene expression programming and one-dimensional chaotic maps
    • Hardy, Y., & Steeb, W.H. (2002). Gene expression programming and one-dimensional chaotic maps. International Journal of Modern Physics C, 13(1), 13-24.
    • (2002) International Journal of Modern Physics C , vol.13 , Issue.1 , pp. 13-24
    • Hardy, Y.1    Steeb, W.H.2
  • 9
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in job shop
    • Baker, K.R. (1984). Sequencing rules and due-date assignments in job shop. Management Science, 30(9), 1093-1104.
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, R.1
  • 10
  • 11
    • 0002066821 scopus 로고
    • Various optimizers for single-stage production
    • Smith, W.E. (1956). Various optimizers for single-stage production. Naval Research Logistics Quarterly, 3(1-2), 59-66.
    • (1956) Naval Research Logistics Quarterly , vol.3 , Issue.1-2 , pp. 59-66
    • Smith, W.E.1
  • 12
    • 0003666178 scopus 로고
    • Research Report 43, Management Science Research Project, University of California at Los Angeles, Los Angeles, CA
    • Jackson, J.R. (1955). Scheduling a Production Line to Minimize Maximum Tardiness. Research Report 43, Management Science Research Project, University of California at Los Angeles, Los Angeles, CA.
    • (1955) Scheduling A Production Line to Minimize Maximum Tardiness
    • Jackson, J.R.1
  • 14
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt, R. (1989). A survey of priority rule-based scheduling. OR Spectrum, 11(1), 3-16.
    • (1989) OR Spectrum , vol.11 , Issue.1 , pp. 3-16
    • Haupt, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.