메뉴 건너뛰기




Volumn , Issue , 2011, Pages 426-431

Approval procedures and consensus for building transmission lines: Obstacles and solutions

Author keywords

approval procedures; consensus; European energy policy; transmission planning

Indexed keywords

PLANNING;

EID: 80052115418     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/EEM.2011.5953123     Document Type: Conference Paper
Times cited : (3)

References (11)
  • 7
    • 80052129146 scopus 로고    scopus 로고
    • MVV study: http://ec.europa.eu/energy/infrastructure/studies/doc/2007-11- ten-e-evaluation.pdf
    • MVV Study
  • 9
    • 0011611650 scopus 로고
    • Public perceptions of electric power transmission lines
    • Furby et al.: Public Perceptions of electric power transmission lines, Journal of Environmental Psychology (1988) 8, 19-43
    • (1988) Journal of Environmental Psychology , vol.8 , pp. 19-43
    • Furby1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.