메뉴 건너뛰기




Volumn 62, Issue 4, 2011, Pages 1870-1878

A note on optimization in deteriorating systems using scheduling problems with the aging effect and resource allocation models

Author keywords

Aging effect; Resource allocation; Scheduling; Single machine

Indexed keywords

ACTIVE SUBSTANCE; AGING EFFECTS; AGING PHENOMENA; COMPLETION TIME; DETERIORATING SYSTEM; JOB PROCESSING TIME; MAXIMUM LATENESS; OPTIMIZATION PROBLEMS; POLYNOMIAL-TIME ALGORITHMS; RESOURCE ALLOCATION MODEL; RESOURCE CONSUMPTION; SCHEDULING PROBLEM; SINGLE MACHINES; SINGLE-MACHINE SCHEDULING; SOLUTION PROPERTY;

EID: 80051798225     PISSN: 08981221     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.camwa.2011.06.030     Document Type: Article
Times cited : (31)

References (23)
  • 2
    • 80051794428 scopus 로고    scopus 로고
    • Pickling and acid dipping
    • E.C. Groshart Pickling and acid dipping Metal Finishing 98 2000 183 193
    • (2000) Metal Finishing , vol.98 , pp. 183-193
    • Groshart, E.C.1
  • 3
    • 18544379207 scopus 로고    scopus 로고
    • Overview of surface preparation of metals prior to finishing: Part 2
    • DOI 10.1016/S0026-0576(03)90137-1
    • N.V. Mandich Overview of surface preparation of metals prior to finishing: part 2 Metal Finishing 101 2003 33 58 (Pubitemid 41161682)
    • (2003) Metal Finishing , vol.101 , Issue.10 , pp. 33-58
    • Mandich, N.V.1
  • 5
    • 40249098890 scopus 로고    scopus 로고
    • Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect
    • DOI 10.1057/palgrave.jors.2602363, PII 2602363
    • W.-H. Kuo, and D.-L. Yang Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect Journal of the Operational Research Society 59 2008 416 420 (Pubitemid 351334705)
    • (2008) Journal of the Operational Research Society , vol.59 , Issue.3 , pp. 416-420
    • Kuo, W.-H.1    Yang, D.-L.2
  • 7
    • 23744450823 scopus 로고    scopus 로고
    • A note on scheduling deteriorating jobs
    • DOI 10.1016/j.mcm.2004.09.004, PII S0895717705001500
    • G. Mosheiov A note on scheduling deteriorating jobs Mathematical and Computer Modelling 41 2005 883 886 (Pubitemid 41140279)
    • (2005) Mathematical and Computer Modelling , vol.41 , Issue.8-9 , pp. 883-886
    • Mosheiov, G.1
  • 8
    • 77952551347 scopus 로고    scopus 로고
    • Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities
    • S.-J. Yang, and D.-L. Yang Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities OMEGA International Journal of Management Science 38 2010 528 533
    • (2010) OMEGA International Journal of Management Science , vol.38 , pp. 528-533
    • Yang, S.-J.1    Yang, D.-L.2
  • 9
    • 77957918240 scopus 로고    scopus 로고
    • Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities
    • S.-J. Yang, and D.-L. Yang Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities Computers and Mathematics with Applications 60 2010 2161 2169
    • (2010) Computers and Mathematics with Applications , vol.60 , pp. 2161-2169
    • Yang, S.-J.1    Yang, D.-L.2
  • 10
    • 0000726721 scopus 로고    scopus 로고
    • Single-machine scheduling with trade-off between number of tardy jobs and resource allocation
    • DOI 10.1016/S0167-6377(96)00035-1, PII S0167637796000351
    • T.C.E. Cheng, Z.-L. Chen, and C.-L. Li Single-machine scheduling with trade-off between number of tardy jobs and resource allocation Operations Research Letters 19 1996 237 242 (Pubitemid 126395668)
    • (1996) Operations Research Letters , vol.19 , Issue.5 , pp. 237-242
    • Cheng, T.C.E.1    Chen, Z.-L.2    Li, C.-L.3
  • 11
    • 0029313350 scopus 로고
    • Single machine batch scheduling with deadlines and resource dependent processing times
    • T.C.E. Cheng, and M.Y. Kovalyov Single machine batch scheduling with deadlines and resource dependent processing times Operations Research Letters 17 1995 243 249
    • (1995) Operations Research Letters , vol.17 , pp. 243-249
    • Cheng, T.C.E.1    Kovalyov, M.Y.2
  • 12
    • 0037410951 scopus 로고    scopus 로고
    • Single machine scheduling with a variable common due date and resource-dependent processing times
    • DOI 10.1016/S0305-0548(02)00066-7, PII S0305054802000667
    • C.T.D. Ng, T.C.E. Cheng, M.Y. Kovalyov, and S.S. Lam Single machine scheduling with a variable common due date and resource-dependent processing times Computers & Operations Research 30 2003 1173 1185 (Pubitemid 36346003)
    • (2003) Computers and Operations Research , vol.30 , Issue.8 , pp. 1173-1185
    • Ng Daniel, C.T.D.1    Cheng, T.C.E.2    Kovalyov, M.Y.3    Lam, S.S.4
  • 13
    • 0037941513 scopus 로고    scopus 로고
    • Batch scheduling with controllable setup and processing times to minimize total completion time
    • C.T.D. Ng, T.C.E. Cheng, and M.Y. Kovalyov Batch scheduling with controllable setup and processing times to minimize total completion time Journal of the Operational Research Society 54 2003 499 506
    • (2003) Journal of the Operational Research Society , vol.54 , pp. 499-506
    • Ng, C.T.D.1    Cheng, T.C.E.2    Kovalyov, M.Y.3
  • 14
    • 0019058538 scopus 로고
    • Choosing the job sequence and processing times to minimize total processing plus flow cost on a single machine
    • R.G. Vickson Choosing the job sequence and processing times to minimize total processing plus flow cost on a single machine Operations Research 28 1980 1155 1167 (Pubitemid 11450953)
    • (1980) Operations Research , vol.28 , Issue.5 , pp. 1155-1167
    • Vickson, R.G.1
  • 15
    • 0035187217 scopus 로고    scopus 로고
    • Impact of added rest breaks on the productivity and well being of workers
    • A.J. Dababneh, N. Swanson, and R.L. Shell Impact of added rest breaks on the productivity and well being of workers Ergonomics 44 2001 164 174 (Pubitemid 32058494)
    • (2001) Ergonomics , vol.44 , Issue.2 , pp. 164-174
    • Dababneh, A.J.1    Swanson, N.2    Shell, R.L.3
  • 16
    • 24944538120 scopus 로고
    • On a mechanistic approach to fatigue and rest periods
    • S. Eilon On a mechanistic approach to fatigue and rest periods International Journal of Production Research 3 1964 327 332
    • (1964) International Journal of Production Research , vol.3 , pp. 327-332
    • Eilon, S.1
  • 17
    • 18344411567 scopus 로고    scopus 로고
    • Investigation into the relationship between tool-wear and cutting environments when turning EN32 steel
    • M. Stanford, and P. Lister Investigation into the relationship between tool-wear and cutting environments when turning EN32 steel Industrial Lubrication & Tribology 56 2004 114 121
    • (2004) Industrial Lubrication & Tribology , vol.56 , pp. 114-121
    • Stanford, M.1    Lister, P.2
  • 18
    • 34249306917 scopus 로고    scopus 로고
    • Single-machine scheduling problems with start-time dependent processing time
    • DOI 10.1016/j.camwa.2006.07.012, PII S089812210700137X
    • W.-H. Kuo, and D.-L. Yang Single-machine scheduling problems with start-time dependent processing time Computers and Mathematics with Applications 53 2007 1658 1664 (Pubitemid 46818896)
    • (2007) Computers and Mathematics with Applications , vol.53 , Issue.11 , pp. 1658-1664
    • Kuo, W.-H.1    Yang, D.-L.2
  • 19
    • 65649091354 scopus 로고    scopus 로고
    • Single machine scheduling with decreasing linear deterioration under precedence constraints
    • J.-B. Wang Single machine scheduling with decreasing linear deterioration under precedence constraints Computers and Mathematics with Applications 58 2009 95 103
    • (2009) Computers and Mathematics with Applications , vol.58 , pp. 95-103
    • Wang, J.-B.1
  • 20
    • 79955669952 scopus 로고    scopus 로고
    • Single-machine scheduling with a nonlinear deterioration function
    • P.-J. Lai, and W.-C. Lee Single-machine scheduling with a nonlinear deterioration function Information Processing Letters 110 2010 455 459
    • (2010) Information Processing Letters , vol.110 , pp. 455-459
    • Lai, P.-J.1    Lee, W.-C.2
  • 23
    • 58349089245 scopus 로고    scopus 로고
    • Scheduling a maintenance activity to minimize total weighted completion-time
    • G. Mosheiov, and A. Sarig Scheduling a maintenance activity to minimize total weighted completion-time Computers and Mathematics with Applications 57 2009 619 623
    • (2009) Computers and Mathematics with Applications , vol.57 , pp. 619-623
    • Mosheiov, G.1    Sarig, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.