메뉴 건너뛰기




Volumn , Issue , 2005, Pages 1-315

Maintenance, Replacement, and Reliability: Theory and Applications

Author keywords

[No Author keywords available]

Indexed keywords


EID: 80051756256     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.1201/9781420044614     Document Type: Book
Times cited : (116)

References (125)
  • 1
    • 2942603678 scopus 로고    scopus 로고
    • New York: American Society of Mechanical Engineers International
    • ASME. (2003). Risk-Based Methods for Equipment Life Management. New York: American Society of Mechanical Engineers International.
    • (2003) Risk-Based Methods for Equipment Life Management
  • 7
    • 0022026157 scopus 로고
    • The cost of downtime for maintenance: Preliminary considerations
    • Geraerds, W.M.J. (1985). The cost of downtime for maintenance: preliminary considerations. Maintenance Management International, 5, 13-21.
    • (1985) Maintenance Management International , vol.5 , pp. 13-21
    • Geraerds, W.M.J.1
  • 14
  • 15
    • 0011026068 scopus 로고    scopus 로고
    • Cascading the balanced scorecard: A case study on Nova Scotia Power, Inc
    • Niven, P.R. (1999). Cascading the balanced scorecard: a case study on Nova Scotia Power, Inc. Journal of Strategic Performance Measurement, 3(2), 5-12.
    • (1999) Journal of Strategic Performance Measurement , vol.3 , Issue.2 , pp. 5-12
    • Niven, P.R.1
  • 21
    • 0003066140 scopus 로고    scopus 로고
    • Managing the maintenance performance of an electricity utility through the use of balanced scorecards
    • Tsang, A.H.C. and Brown, W.L. (1999). Managing the maintenance performance of an electricity utility through the use of balanced scorecards. New Engineering Journal, 2(3), 22-29.
    • (1999) New Engineering Journal , vol.2 , Issue.3 , pp. 22-29
    • Tsang, A.H.C.1    Brown, W.L.2
  • 26
    • 0004257011 scopus 로고
    • New York: Wiley, Reprinted in 1996 by the Society of Industrial and Applied Mathematics, Philadelphia, in their book series SIAM Classics in Applied Mathematics
    • Barlow, R. and Proschan, F. (1965). Mathematical Theory of Reliability. New York: Wiley. Reprinted in 1996 by the Society of Industrial and Applied Mathematics, Philadelphia, in their book series SIAM Classics in Applied Mathematics.
    • (1965) Mathematical Theory of Reliability
    • Barlow, R.1    Proschan, F.2
  • 31
    • 0040290068 scopus 로고
    • An overhaul policy for deteriorating equipment
    • A.K.S. Jardine, Ed. Manchester University Press, chap. 5
    • Davidson, D. (1970). An overhaul policy for deteriorating equipment. In Operational Research in Maintenance, A.K.S. Jardine, Ed. Manchester University Press, chap. 5, pp. 72-99.
    • (1970) Operational Research in Maintenance , pp. 72-99
    • Davidson, D.1
  • 32
    • 0040883474 scopus 로고
    • Planned replacement: Some theory and its application
    • Glasser, G.J. (1969). Planned replacement: some theory and its application. Journal of Quality Technology, 1.
    • (1969) Journal of Quality Technology , pp. 1
    • Glasser, G.J.1
  • 33
    • 85152847372 scopus 로고    scopus 로고
    • Component reliability, replacement and cost analysis with incomplete failure data
    • W.R. Blischke and D.N. Prabhakar Murthy, Eds. New York: Wiley, chap
    • Hastings, N.A.J. (2004). Component reliability, replacement and cost analysis with incomplete failure data. In Case Studies in Reliability and Maintenance, W.R. Blischke and D.N. Prabhakar Murthy, Eds. New York: Wiley, chap. 16.
    • (2004) Case Studies in Reliability and Maintenance , pp. 16
    • Hastings, N.A.J.1
  • 37
    • 85152839784 scopus 로고    scopus 로고
    • Unpublished B.A.Sc. thesis, Department of Mechanical and Industrial Engineering, University of Toronto
    • Kallis, C. (2003). Economic Life Calculation of Distribution Transformers. Unpublished B.A.Sc. thesis, Department of Mechanical and Industrial Engineering, University of Toronto.
    • (2003) Economic Life Calculation of Distribution Transformers
    • Kallis, C.1
  • 39
    • 0242301620 scopus 로고    scopus 로고
    • Optimization of the machining economics problem for a multistage transfer machine under failure, opportunistic and integrated replacement strategies
    • Kaspi, M. and Shabtay, D. (2003). Optimization of the machining economics problem for a multistage transfer machine under failure, opportunistic and integrated replacement strategies. International Journal of Production Research, 41, 2229-2247.
    • (2003) International Journal of Production Research , vol.41 , pp. 2229-2247
    • Kaspi, M.1    Shabtay, D.2
  • 40
    • 0002192597 scopus 로고
    • Some results for repairable systems with general repair
    • Kijima, M. (1989). Some results for repairable systems with general repair. Journal of Applied Probability, 26, 89-102.
    • (1989) Journal of Applied Probability , vol.26 , pp. 89-102
    • Kijima, M.1
  • 43
    • 3042638266 scopus 로고    scopus 로고
    • Modeling repairable systems reliability with explanatory variables and repair and maintenance actions
    • Lugtigheid, D., Banjevic, D., and Jardine, A.K.S. (2004). Modeling repairable systems reliability with explanatory variables and repair and maintenance actions. IMA Journal of Management Mathematics, 15, 89-110.
    • (2004) IMA Journal of Management Mathematics , vol.15 , pp. 89-110
    • Lugtigheid, D.1    Banjevic, D.2    Jardine, A.K.S.3
  • 45
    • 85060416694 scopus 로고
    • Reliable preventive maintenance scheduling
    • Malik, M.A.K. (1978). Reliable preventive maintenance scheduling. AIIE Transactions, R28, 331-332.
    • (1978) AIIE Transactions , vol.R28 , pp. 331-332
    • Malik, M.A.K.1
  • 48
    • 0016116368 scopus 로고
    • 2-stage replacement strategies and their application to manpower planning
    • Robinson, D. (1974). 2-stage replacement strategies and their application to manpower planning. Management Science Series B - Application, 2, 199-208.
    • (1974) Management Science Series B - Application , vol.2 , pp. 199-208
    • Robinson, D.1
  • 53
    • 0343161296 scopus 로고
    • Replacement policies for components that deteriorate
    • Woodman, R.C. (1967). Replacement policies for components that deteriorate. Operational Research Quarterly, 18.
    • (1967) Operational Research Quarterly , pp. 18
    • Woodman, R.C.1
  • 54
  • 55
    • 0035245259 scopus 로고    scopus 로고
    • A control-limit policy and software for condition-based maintenance optimization
    • Banjevic, D., Jardine, A.K.S., Makis, V., and Ennis, M. (2001). A control-limit policy and software for condition-based maintenance optimization. INFOR, 39, 32-50.
    • (2001) INFOR , vol.39 , pp. 32-50
    • Banjevic, D.1    Jardine, A.K.S.2    Makis, V.3    Ennis, M.4
  • 58
    • 0033366210 scopus 로고    scopus 로고
    • Developments in delay time analysis for modelling plant maintenance
    • Christer, A.H. (1999). Developments in delay time analysis for modelling plant maintenance. Journal of the Operational Research Society, 1120-1137.
    • (1999) Journal of the Operational Research Society , pp. 1120-1137
    • Christer, A.H.1
  • 60
    • 0010310279 scopus 로고
    • Balance maintenance costs against plant reliability with simulation modelling
    • Concannon, K.H., McPhee, J., and Jardine, A.K.S. (1990). Balance maintenance costs against plant reliability with simulation modelling. Industrial Enginering, 24-27.
    • (1990) Industrial Enginering , pp. 24-27
    • Concannon, K.H.1    McPhee, J.2    Jardine, A.K.S.3
  • 61
    • 0000336139 scopus 로고
    • Regression models and life tables (with discussion)
    • Cox, D.R. (1972). Regression models and life tables (with discussion). J. Roy. Stat. Soc.B, 34, 187-220.
    • (1972) J. Roy. Stat. Soc.B , vol.34 , pp. 187-220
    • Cox, D.R.1
  • 64
    • 84871528958 scopus 로고    scopus 로고
    • Interpretation of inspection data emanating from equipment condition monitoring tools: Method and software
    • Y.M. Armijo, Ed. World Scientific Publishing Company, Singapore
    • Jardine, A.K.S. and Banjevic, D. (2005). Interpretation of inspection data emanating from equipment condition monitoring tools: method and software. In Mathematical and Statistical Methods in Reliability, Y.M. Armijo, Ed. World Scientific Publishing Company, Singapore.
    • (2005) Mathematical and Statistical Methods in Reliability
    • Jardine, A.K.S.1    Banjevic, D.2
  • 67
    • 0032653742 scopus 로고    scopus 로고
    • Optimizing condition-based maintenance decisions for equipment subject to vibration monitoring
    • Jardine, A.K.S., Joseph, T., and Banjevic, D. (1999). Optimizing condition-based maintenance decisions for equipment subject to vibration monitoring. Journal of Quality in Maintenance Engineering, 5, 192-202.
    • (1999) Journal of Quality in Maintenance Engineering , vol.5 , pp. 192-202
    • Jardine, A.K.S.1    Joseph, T.2    Banjevic, D.3
  • 70
    • 0347615488 scopus 로고    scopus 로고
    • Case experience comparing the RCM approach to plane maintenance with a modeling approach
    • W.R. Blische and D.N. Murthy, Eds. New York: Wiley
    • Jia, X. and Christer, A.H.C. (2003). Case experience comparing the RCM approach to plane maintenance with a modeling approach. In Case Studies in Reliability and Maintenance, W.R. Blische and D.N. Murthy, Eds. New York: Wiley.
    • (2003) Case Studies in Reliability and Maintenance
    • Jia, X.1    Christer, A.H.C.2
  • 73
    • 85152843526 scopus 로고    scopus 로고
    • Private communication subsequent to presentation: Kingsbury, R.L., Jardine, A.K.S., and Picknell, J.V. (1998)
    • Paper presented at Aerospace Technology Working Group, NASA/Industry National Meeting, Cocoa Beach, FL, October
    • Kingsbury, R.L. (1999). Private communication subsequent to presentation: Kingsbury, R.L., Jardine, A.K.S., and Picknell, J.V. (1998). Reliability Centered Maintenance. Paper presented at Aerospace Technology Working Group, NASA/Industry National Meeting, Cocoa Beach, FL, October 14-16.
    • (1999) Reliability Centered Maintenance , pp. 14-16
    • Kingsbury, R.L.1
  • 75
    • 0000466370 scopus 로고
    • Optimal replacement in the proportional hazards model
    • Makis, V. and Jardine, A.K.S. (1992). Optimal replacement in the proportional hazards model. INFOR, 20, 172-183.
    • (1992) INFOR , vol.20 , pp. 172-183
    • Makis, V.1    Jardine, A.K.S.2
  • 86
    • 85152824398 scopus 로고    scopus 로고
    • Optimizing condition based maintenance
    • J.D. Campbell and A.K.S. Jardine, Eds. New York: Marcel Dekker, chap
    • Wiseman, M. (2001). Optimizing condition based maintenance. In Maintenance Excellence, J.D. Campbell and A.K.S. Jardine, Eds. New York: Marcel Dekker, chap. 12.
    • (2001) Maintenance Excellence , pp. 12
    • Wiseman, M.1
  • 89
    • 85060424898 scopus 로고
    • Noranda equipment replacement system
    • G.E. Lasker, Ed. Oxford: Pergamon Press
    • Buttimore, B. and Lim, A. (1981). Noranda equipment replacement system. In Applied Systems and Cybernetics, Vol. II, G.E. Lasker, Ed. Oxford: Pergamon Press, pp. 1069-1073.
    • (1981) Applied Systems and Cybernetics , vol.2 , pp. 1069-1073
    • Buttimore, B.1    Lim, A.2
  • 96
    • 85033107679 scopus 로고
    • A study on the optimum size of plant maintenance gangs
    • A.K.S. Jardine, Ed. Manchester, U.K., Manchester University Press
    • Carruthers, A.J., MacGow, I., and Hackemer, G.C. (1970). A study on the optimum size of plant maintenance gangs. In Operational Research in Maintenance, A.K.S. Jardine, Ed. Manchester, U.K., Manchester University Press.
    • (1970) Operational Research in Maintenance
    • Carruthers, A.J.1    MacGow, I.2    Hackemer, G.C.3
  • 97
    • 0010310279 scopus 로고
    • Balance maintenance cost against plant reliability with simulation modeling
    • January
    • Concannon, K.H., Jardine, A.K.S., and McPhee, J. (1990). Balance maintenance cost against plant reliability with simulation modeling. Industrial Engineering, January, pp. 24-27.
    • (1990) Industrial Engineering , pp. 24-27
    • Concannon, K.H.1    Jardine, A.K.S.2    McPhee, J.3
  • 98
    • 0003585628 scopus 로고
    • London: Chapman and Hall
    • Cox, D.R. and Smith, W.L. (1961). Queues. London: Chapman and Hall.
    • (1961) Queues
    • Cox, D.R.1    Smith, W.L.2
  • 104
    • 85060427394 scopus 로고
    • Project selection and analysis
    • G. Salvendy, Ed. New York: Wiley, chap
    • Theusen, G.J. (1992). Project selection and analysis. In Handbook of Industrial Engineering, G. Salvendy, Ed. New York: Wiley, chap. 51.
    • (1992) Handbook of Industrial Engineering , pp. 51
    • Theusen, G.J.1
  • 105
    • 84936051385 scopus 로고
    • Working curves for delayed exponential calls served in random order
    • Wilkinson, R.I. (1953). Working curves for delayed exponential calls served in random order. Bell System Technical Journal, 32.
    • (1953) Bell System Technical Journal , pp. 32
    • Wilkinson, R.I.1
  • 110
    • 0028464909 scopus 로고
    • Model accuracy and goodness of fit for the Weibull distribution with suspended items
    • Ang, J.Y.T. and Hastings, N.A.J. (1994). Model accuracy and goodness of fit for the Weibull distribution with suspended items. Microelectronics and Reliability, 34, 1177-1184.
    • (1994) Microelectronics and Reliability , vol.34 , pp. 1177-1184
    • Ang, J.Y.T.1    Hastings, N.A.J.2
  • 115


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.