-
2
-
-
85151532938
-
Beyond partnerships: The power of lean supply chains
-
Jung, H., Chen, F.F. and Jeong, B. (eds), Springer, Surrey, UK
-
Rivera, L., Wan, H., Chen, F.F. and Lee, W., 2007, "Beyond partnerships: the power of lean supply chains," In Trends in Supply Chain Design and Management: Technologies and Methodologies, Jung, H., Chen, F.F. and Jeong, B. (eds), Springer, Surrey, UK, pp. 241-268.
-
(2007)
Trends in Supply Chain Design and Management: Technologies and Methodologies
, pp. 241-268
-
-
Rivera, L.1
Wan, H.2
Chen, F.F.3
Lee, W.4
-
3
-
-
50849103389
-
A web-based Kanban system for job dispatching, tracking, and performance monitoring
-
(in press)
-
Wan, H. and Chen, F.F., 2008, "A web-based Kanban system for job dispatching, tracking, and performance monitoring," International Journal of Advanced Manufacturing Technology, (in press).
-
(2008)
International Journal of Advanced Manufacturing Technology
-
-
Wan, H.1
Chen, F.F.2
-
4
-
-
0003432893
-
-
Quorum Books, London
-
Goranson, H.T., 1999, The Agile Virtual Enterprise: Cases, Metrics, Tools, Quorum Books, London.
-
(1999)
The Agile Virtual Enterprise: Cases, Metrics, Tools
-
-
Goranson, H.T.1
-
5
-
-
0003449926
-
-
3rd Edition, Institute of Industrial Engineers, Norcross, GA
-
Monden, Y., 1998, Toyota Production System: An Integrated Approach to Just-in-Time, 3rd Edition, Institute of Industrial Engineers, Norcross, GA.
-
(1998)
Toyota Production System: An Integrated Approach to Just-in-Time
-
-
Monden, Y.1
-
7
-
-
0017557653
-
Toyota production system and kanban system. Materialization of just-in-time and respect-for-human system
-
Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa, S., 1977, "Toyota production system and Kanban system: materialisation of just-in-time and respect-for-human system," International Journal of Production Research, 15(6), pp. 553-564. (Pubitemid 8573924)
-
(1977)
International Journal of Production Research
, vol.15
, Issue.6
, pp. 553-564
-
-
Sugimori, Y.1
Kusunoki, K.2
Cho, F.3
Uchikawa, S.4
-
8
-
-
0003463029
-
-
Macmillan, New York
-
Womack, J.P., Jones, D.T. and Roos, D., 1990, The Machine that Changed the World, Macmillan, New York.
-
(1990)
The Machine That Changed the World
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
-
11
-
-
0003931681
-
-
The Lean Enterprise Institute, Brookline, MA
-
Rother, M. and Shook, J., 1998, Learning to See-Value Stream Mapping to Add Value and Eliminate Muda, The Lean Enterprise Institute, Brookline, MA.
-
(1998)
Learning to See-Value Stream Mapping to Add Value and Eliminate Muda
-
-
Rother, M.1
Shook, J.2
-
12
-
-
0024865074
-
Simulating a Just-in-Time production system
-
Sarker, B.R., 1989, "Simulating a Just-in-Time production system," Computers and Industrial Engineering, 16(1), pp. 127-137.
-
(1989)
Computers and Industrial Engineering
, vol.16
, Issue.1
, pp. 127-137
-
-
Sarker, B.R.1
-
13
-
-
0028405569
-
The pull production system: Modelling and characteristics
-
Siha, S., 1994, "The pull production system: modelling and characteristics," International Journal of Production Research, 32(4), pp. 933-949.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.4
, pp. 933-949
-
-
Siha, S.1
-
14
-
-
0025430443
-
CONWIP: A pull alternative to Kanban
-
Spearman, M.L., Woodruff, D.L. and Hopp, W.J., 1990, "CONWIP: a pull alternative to Kanban," International Journal of Production Research, 28(5), pp. 879-894.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.5
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
15
-
-
0003491339
-
-
McGraw-Hill, New York
-
Sipper, D. and Bulfin, R.L. Jr, 1997, Production Planning, Control, and Integration, McGraw-Hill, New York.
-
(1997)
Production Planning, Control, and Integration
-
-
Sipper, D.1
Bulfin Jr., R.L.2
-
17
-
-
33748781775
-
Building a lean supply chain
-
Phelps T., Smith M. and Hoenes T, 2004, "Building a lean supply chain," Manufacturing Engineering, 132, pp. 107-116.
-
(2004)
Manufacturing Engineering
, vol.132
, pp. 107-116
-
-
Phelps, T.1
Smith, M.2
Hoenes, T.3
-
19
-
-
29744466727
-
Lean extended: It's much more (and less) than you think
-
Schonberger, R.J., 2005, "Lean extended: it's much more (and less) than you think," Industrial Engineer, December, pp. 26-31.
-
(2005)
Industrial Engineer, December
, pp. 26-31
-
-
Schonberger, R.J.1
-
20
-
-
0242445193
-
The financial advantages of the lean supply chain
-
March/April
-
Reeve, J.M., 2002, "The financial advantages of the lean supply chain," Supply Chain Management Review, March/April, pp. 42-49.
-
(2002)
Supply Chain Management Review
, pp. 42-49
-
-
Reeve, J.M.1
-
21
-
-
48049086220
-
What makes a lean supply chain
-
October
-
Vitasek, K., Manrodt, K.B. and Abbott, J., 2005, "What makes a lean supply chain," Supply Chain Management Review, October, pp. 39-45.
-
(2005)
Supply Chain Management Review
, pp. 39-45
-
-
Vitasek, K.1
Manrodt, K.B.2
Abbott, J.3
-
22
-
-
0037091912
-
Agile manufacturing: A taxonomy of strategic and technological imperatives
-
DOI 10.1080/00207540110118370
-
Gunasekaran, A. and Yusuf, Y.Y., 2002, "Agile manufacturing: a taxonomy of strategic and technological imperatives," International Journal of Production Research, 40(6), pp. 1357-1385. (Pubitemid 34593777)
-
(2002)
International Journal of Production Research
, vol.40
, Issue.6
, pp. 1357-1385
-
-
Gunasekaran, A.1
Yusuf, Y.Y.2
-
23
-
-
0035841889
-
A review of agile manufacturing systems
-
DOI 10.1080/00207540110068790
-
Sanchez, L.M. and Nagi, R., 2001, "A review of agile manufacturing systems," International Journal of Production Research, 39(16), pp. 3561-3600. (Pubitemid 35165502)
-
(2001)
International Journal of Production Research
, vol.39
, Issue.16
, pp. 3561-3600
-
-
Sanchez, L.M.1
Nagi, R.2
-
24
-
-
0032675021
-
Agility, adaptability and leanness: A comparison of concepts and a study of practice
-
Katayama, H. and Bennett, D., 1999, "Agility, adaptability and leanness: a comparison of concepts and a study of practice," International Journal of Production Economics, 60-61(1), pp. 43-51.
-
(1999)
International Journal of Production Economics
, vol.60-61
, Issue.1
, pp. 43-51
-
-
Katayama, H.1
Bennett, D.2
-
25
-
-
0037146416
-
A comparative study of lean and agile manufacturing with a related survey of current practices in the UK
-
Yusuf, Y.Y. and Adeleye, E.O., 2002, "A comparative study of lean and agile manufacturing with a related survey of current practices in the UK," International Journal of Production Research, 40(17), pp. 4545-4562.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.17
, pp. 4545-4562
-
-
Yusuf, Y.Y.1
Adeleye, E.O.2
-
26
-
-
0003753636
-
-
Van Nostrand Reinhold, New York
-
Goldman, S.L., Nagel R.N. and Preiss, K., 1995, Agile Competitors and Virtual Organisations, Van Nostrand Reinhold, New York.
-
(1995)
Agile Competitors and Virtual Organisations
-
-
Goldman, S.L.1
Nagel, R.N.2
Preiss, K.3
-
27
-
-
0030535609
-
Cellular manufacturing using virtual cells
-
Kannan, V.R. and Ghosh, S., 1996, "Cellular manufacturing using virtual cells," International Journal of Operations & Production Management, 16(5), pp. 99-13.
-
(1996)
International Journal of Operations & Production Management
, vol.16
, Issue.5
, pp. 99-13
-
-
Kannan, V.R.1
Ghosh, S.2
-
28
-
-
0242360414
-
Development of virtual cellular manufacturing systems for SMEs
-
Babu, A.S., Nandurkar, K.N. and Thomas, A., 2000, "Development of virtual cellular manufacturing systems for SMEs," Logistics Information Management, 13(4), pp. 228-242.
-
(2000)
Logistics Information Management
, vol.13
, Issue.4
, pp. 228-242
-
-
Babu, A.S.1
Nandurkar, K.N.2
Thomas, A.3
-
29
-
-
0242364659
-
Capability-based distributed layout approach for virtual manufacturing cells
-
Baykasoglu, A., 2003, "Capability-based distributed layout approach for virtual manufacturing cells," International Journal of Production Research, 41(11), pp. 2597-2618.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.11
, pp. 2597-2618
-
-
Baykasoglu, A.1
-
30
-
-
0038824825
-
Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis
-
Prince, J. and Kay, J.M., 2003, "Combining lean and agile characteristics: creation of virtual groups by enhanced production flow analysis," International Journal of Production Economics, 85(3), pp. 305-318.
-
(2003)
International Journal of Production Economics
, vol.85
, Issue.3
, pp. 305-318
-
-
Prince, J.1
Kay, J.M.2
-
31
-
-
0344240982
-
Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain
-
Naylor, J.B., Naim, M.M. and Berry, D., 1999, "Leagility: integrating the lean and agile manufacturing paradigms in the total supply chain," International Journal of Production Economics, 62(1), pp. 107-118.
-
(1999)
International Journal of Production Economics
, vol.62
, Issue.1
, pp. 107-118
-
-
Naylor, J.B.1
Naim, M.M.2
Berry, D.3
-
32
-
-
33847363196
-
Literature review of JIT-KANBAN system
-
DOI 10.1007/s00170-005-0340-2
-
Kumar, C.S. and Panneerselvam, R., 2007, "Literature review of JIT-KANBAN system," International Journal of Advanced Manufacturing Technology, 32(3-4), pp. 393-408. (Pubitemid 46331772)
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.32
, Issue.3-4
, pp. 393-408
-
-
Kumar, C.S.1
Panneerselvam, R.2
-
33
-
-
84986958388
-
A review of the Kanban production control research literature
-
Berkley, B.J., 1992, "A review of the Kanban production control research literature," Production and Operations Management, 1(4), pp. 393-411.
-
(1992)
Production and Operations Management
, vol.1
, Issue.4
, pp. 393-411
-
-
Berkley, B.J.1
-
34
-
-
0023310442
-
An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanban
-
Philipoom, P.R., Rees, L.P., Taylor, B.W. III and Huang, P.Y., 1987, "An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanban", International Journal of Production Research, 25(3), pp. 457-72.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.3
, pp. 457-472
-
-
Philipoom, P.R.1
Rees, L.P.2
Taylor, B.W.3
Huang, P.Y.4
-
35
-
-
0024883395
-
Batching policy in Kanban system
-
Karmarkar, U.S. and Kekre, S., 1989, "Batching policy in Kanban system," Journal of Manufacturing Systems, 8(4), pp. 317-328.
-
(1989)
Journal of Manufacturing Systems
, vol.8
, Issue.4
, pp. 317-328
-
-
Karmarkar, U.S.1
Kekre, S.2
-
36
-
-
0030269796
-
Operations planning for kanbans between two adjacent workstations
-
Sarker, B.R. and Balan, C.V., 1996, "Operations planning for Kanbans between two adjacent workstations," Computers and Industrial Engineering, 31(1-2), pp. 221-224. (Pubitemid 126380023)
-
(1996)
Computers and Industrial Engineering
, vol.31
, Issue.1-2
, pp. 221-224
-
-
Sarker, B.R.1
Balan, C.V.2
-
37
-
-
0031273822
-
Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types
-
Rshini, B.S. and Ran, C.R., 1997, "Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types," International Journal of Production Research, 35(11), pp. 3133-3156.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.11
, pp. 3133-3156
-
-
Rshini, B.S.1
Ran, C.R.2
-
38
-
-
0034135524
-
Pull type manufacturing systems with multiple product types
-
Altiok, T. and Shiue, G.A., 2000, "Pull type manufacturing systems with multiple product types," IIE Transactions, 32(2), pp. 15-124.
-
(2000)
IIE Transactions
, vol.32
, Issue.2
, pp. 15-124
-
-
Altiok, T.1
Shiue, G.A.2
-
39
-
-
0023330726
-
A mathematical programming approach to a deterministic Kanban system
-
Bitran, G.R. and Chang, L., 1987, "A mathematical programming approach to a deterministic Kanban system," Management Science, 33(4), pp. 427-441.
-
(1987)
Management Science
, vol.33
, Issue.4
, pp. 427-441
-
-
Bitran, G.R.1
Chang, L.2
-
40
-
-
0023345352
-
Configuring a Kanban system using a discrete optimisation of multiple stochastic responses
-
Davis, W.J. and Stubitz, S.J., 1987, "Configuring a Kanban system using a discrete optimisation of multiple stochastic responses," International Journal of Production Research, 25(5), pp. 721-740.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.5
, pp. 721-740
-
-
Davis, W.J.1
Stubitz, S.J.2
-
41
-
-
0002845096
-
Lean production in an international supply chain
-
Levy, D.L., 1997, "Lean production in an international supply chain," Sloan Management Review, 38(2), pp. 94-102.
-
(1997)
Sloan Management Review
, vol.38
, Issue.2
, pp. 94-102
-
-
Levy, D.L.1
-
42
-
-
84865090523
-
Japanese automakers, U.S. suppliers and supply-chain superiority
-
Liker, J.K. and Wu, Y.C., 2000, "Japanese automakers, U.S. suppliers and supplychain superiority," Sloan Management Review, 42(1), pp. 81-93. (Pubitemid 33715282)
-
(2001)
MIT Sloan Management Review
, vol.42
, Issue.1
, pp. 81-93
-
-
Liker, J.K.1
Wu, Y.-C.2
-
43
-
-
50849108354
-
Dis"card"ing the paper Kanban: Electronic web-based Kanbans support lean manufacturing
-
Cutler, T.R., 2005, "Dis"card"ing the paper Kanban: electronic web-based Kanbans support lean manufacturing," InMFG, 62, pp. 30-31.
-
(2005)
InMFG
, vol.62
, pp. 30-31
-
-
Cutler, T.R.1
-
45
-
-
50849132386
-
Internet Kanban delivers just in time
-
March/April
-
Osborne, T., 2002, "Internet Kanban delivers just in time," Illinois Manufacturer Magazine, March/April, pp. 9-27.
-
(2002)
Illinois Manufacturer Magazine
, pp. 9-27
-
-
Osborne, T.1
-
46
-
-
0036722388
-
A synergic analysis for Web-based enterprise resources planning systems
-
DOI 10.1016/S0920-5489(01)00105-2, PII S0920548901001052
-
Yen, D.C., Chou, D.C. and Chang, J., 2002, "A synergic analysis for Web-based enterprise resource planning systems," Computer Standards & Interfaces, 24(4), pp. 337-346. (Pubitemid 34624226)
-
(2002)
Computer Standards and Interfaces
, vol.24
, Issue.4
, pp. 337-346
-
-
Yen, D.C.1
Chou, D.C.2
Chang, J.3
-
47
-
-
0037804638
-
Web-ERP: The new generation of enterprise resource planning
-
Ng, J.K.C. and Ip, W.H., 2003, "Web-ERP: the new generation of enterprise resource planning," Journal of Materials Processing Technology, 138(1), pp. 590-593.
-
(2003)
Journal of Materials Processing Technology
, vol.138
, Issue.1
, pp. 590-593
-
-
Ng, J.K.C.1
Ip, W.H.2
-
48
-
-
0037448857
-
A strategic framework for the management of ERP enabled e-business change
-
Ash, C.G. and Burn, J.M., 2003, "A strategic framework for the management of ERP enabled e-business change," European Journal of Operational Research, 146(2), pp. 373-387.
-
(2003)
European Journal of Operational Research
, vol.146
, Issue.2
, pp. 373-387
-
-
Ash, C.G.1
Burn, J.M.2
-
49
-
-
0346332891
-
Software component architecture in supply chain management
-
Verwijmeren, M., 2004, "Software component architecture in supply chain management," Computers in Industry, 53(2), pp. 165-178.
-
(2004)
Computers in Industry
, vol.53
, Issue.2
, pp. 165-178
-
-
Verwijmeren, M.1
-
50
-
-
33750162493
-
A web-based logistics management system for agile supply demand network design
-
DOI 10.1108/17410380610707384, Dispersed Manufacturing Networks
-
Helo, P., Xiao, Y. and Jiao, J.R., 2006, "A web-based logistics management system for agile supply demand network design," Journal of Manufacturing Technology Management, 17(6), pp. 1058-1077. (Pubitemid 44601852)
-
(2006)
Journal of Manufacturing Technology Management
, vol.17
, Issue.8
, pp. 1058-1077
-
-
Helo, P.1
Xiao, Y.2
Jiao, J.R.3
-
51
-
-
37049008698
-
A Web-based ERP system for business services and supply chain management: Application to real-world process scheduling
-
DOI 10.1016/j.ejor.2006.09.015, PII S037722170600840X
-
Tarantilis, C.D., Kiranoudis, C.T. and Theodorakopoulos, N.D., 2008, "A Web-based ERP system for business services and supply chain management: application to realworld process scheduling," European Journal of Operational Research, 187(3), pp. 1310-1326. (Pubitemid 350245719)
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1310-1326
-
-
Tarantilis, C.D.1
Kiranoudis, C.T.2
Theodorakopoulos, N.D.3
-
52
-
-
36249014309
-
Optimal method for changing the number of kanbans in the e-Kanban system and its applications
-
DOI 10.1080/00207540601096940, PII 772390752
-
Kotani, S., 2007, "Optimal method for changing the number of Kanbans in the e-Kanban system and its applications," International Journal of Production Research 45(24), pp. 5789-5809. (Pubitemid 350129556)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.24
, pp. 5789-5809
-
-
Kotani, S.1
-
53
-
-
85151511705
-
A systems approach to viable RFID implementation in the supply chain
-
Jung, H., Chen, F.F. and Jeong, B. (eds), Springer, Surrey, UK
-
Saygin, C., Sarangapani, J. and Grasman, S.E., 2007, "A systems approach to viable RFID implementation in the supply chain," In Trends in Supply Chain Design and Management: Technologies and Methodologies, Jung, H., Chen, F.F. and Jeong, B. (eds), Springer, Surrey, UK, pp. 3-27.
-
(2007)
Trends in Supply Chain Design and Management: Technologies and Methodologies
, pp. 3-27
-
-
Saygin, C.1
Sarangapani, J.2
Grasman, S.E.3
-
54
-
-
0029369874
-
Physically reconfigurable virtual cells: A dynamic model for a highly dynamic environment
-
Rheault, M., Drolet, J.R. and Abdulnour, G., 1995, "Physically reconfigurable virtual cells: a dynamic model for a highly dynamic environment," Computers and Industrial Engineering, 29(1), pp. 221-225.
-
(1995)
Computers and Industrial Engineering
, vol.29
, Issue.1
, pp. 221-225
-
-
Rheault, M.1
Drolet, J.R.2
Abdulnour, G.3
|