메뉴 건너뛰기




Volumn 17, Issue 1 PART 1, 2008, Pages

A quantum genetic based scheduling algorithm for stochastic flow shop scheduling problem with random

(3)  Gu, JinWei a   Gu, Xingsheng a   Jiao, Bin a  

a NONE

Author keywords

Decision support systems in manufacturing; Intelligent manufacturing systems; Job and activity scheduling

Indexed keywords

COMPUTATIONAL RESULTS; CURRENT GENERATION; FORMER PROCESS; INTELLIGENT MANUFACTURING SYSTEMS; JOB AND ACTIVITY SCHEDULING; LIFE SPAN; PREEMPTIVE-REPEAT; QUANTUM COMPUTE; QUANTUM GATES; SCHEDULING SCHEMES; STOCHASTIC FLOW SHOP SCHEDULING; STOCHASTIC SIMULATIONS; WORKING MODE;

EID: 79961017997     PISSN: 14746670     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.3182/20080706-5-KR-1001.2798     Document Type: Conference Paper
Times cited : (8)

References (7)
  • 1
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
    • Allaoui, H. and Artiba, A(2004). Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. In: p 431-450, Computers and Industrial Engineering.
    • (2004) Computers and Industrial Engineering , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 2
    • 0029632622 scopus 로고
    • Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
    • J
    • ALLAHVERDI A, MITTENTHAL J (1995). Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function [J]. In: 81 (2): 367-387, European Journal of Operation Research.
    • (1995) European Journal of Operation Research , vol.81 , Issue.2 , pp. 367-387
    • Allahverdi, A.1    Mittenthal, J.2
  • 3
    • 0037118759 scopus 로고    scopus 로고
    • An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
    • J
    • ALCAIDE D and RODRIGUEZ. Other (2002). An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns [J]. In: 140 (2): 384-398, European Journal of Operation Research.
    • (2002) European Journal of Operation Research , vol.140 , Issue.2 , pp. 384-398
    • Alcaide, D.1    Rodriguez2
  • 4
    • 34249018250 scopus 로고    scopus 로고
    • A Hybrid Quantum-Inspired Genetic Algorithm for Multi-objective Scheduling
    • Bin-Bin Li and Ling Wang (2007). A Hybrid Quantum-Inspired Genetic Algorithm for Multi-objective Scheduling. In: 37 (3) : 576-591, IEEE Transactions on Systems, Man, and Cybernetics.
    • (2007) IEEE Transactions on Systems, Man, and Cybernetics , vol.37 , Issue.3 , pp. 576-591
    • Li, B.-B.1    Wang, L.2
  • 6
    • 85014751166 scopus 로고    scopus 로고
    • A review of the static stochastic flow shop scheduling problem
    • M. Gourgand, N. Grangeon, others (2000), A review of the static stochastic flow shop scheduling problem. In: 9(2) 183-214, Journal of Decision Systems.
    • (2000) Journal of Decision Systems , vol.9 , Issue.2 , pp. 183-214
    • Gourgand, M.1    Grangeon, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.