메뉴 건너뛰기




Volumn 17, Issue 1, 2007, Pages 9-29

Heuristic approach to train rescheduling

Author keywords

Constraint programming; Heuristics; Job shop scheduling; Train rescheduling

Indexed keywords


EID: 79960929596     PISSN: 03540243     EISSN: 23346043     Source Type: Journal    
DOI: 10.2298/YJOR0701009M     Document Type: Article
Times cited : (9)

References (12)
  • 1
    • 85181641459 scopus 로고    scopus 로고
    • Computer aided railway engineering
    • Mellit, B., Hill R.J., Allan J., Sciutto, G., Brebbia, C.A. (Eds.), WIT press-Computational Mechanics Publications, Comreco Rail Ltd York, England
    • Bater, W.M., "Computer aided railway engineering", in: Mellit, B., Hill R.J., Allan J., Sciutto, G., Brebbia, C.A. (Eds.), Computers in Railways VI, WIT press-Computational Mechanics Publications, Comreco Rail Ltd York, England, 1998, 199-211.
    • (1998) Computers in Railways , vol.6 , pp. 199-211
    • Bater, W.M.1
  • 2
    • 0028436769 scopus 로고
    • A fast heuristic for the train scheduling problem
    • Cai, X., and Goh, C.J., "A fast heuristic for the train scheduling problem", Computers and Operations Research, 21(5) (1994) 499-510.
    • (1994) Computers and Operations Research , vol.21 , Issue.5 , pp. 499-510
    • Cai, X.1    Goh, C.J.2
  • 4
    • 0036604832 scopus 로고    scopus 로고
    • Using real time information for effective dynamic scheduling
    • Cowling, P., Johansson, M., "Using real time information for effective dynamic scheduling", European Journal of Operational Research, 139(2) (2002) 230-244.
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 230-244
    • Cowling, P.1    Johansson, M.2
  • 7
    • 84867781291 scopus 로고    scopus 로고
    • Trip scheduling on single track networks - The TUFF train scheduler
    • Kreuger, P., Carlsson, M., Olsson, J., Sjoland, T., and Astrom, E., "Trip scheduling on single track networks - the TUFF train scheduler", Workshop on Industrial Constraint Directed Scheduling, 1997, 1-12. (Downloadable from website http://citeseer.ist.psu.edu/cache/ papers/cs/2088/http:zSzzSzwww.sics.sezSz~alfzSzcp-97-ws.pdf/kreuger97trip.pdf)
    • (1997) Workshop on Industrial Constraint Directed Scheduling , pp. 1-12
    • Kreuger, P.1    Carlsson, M.2    Olsson, J.3    Sjoland, T.4    Astrom, E.5
  • 10
    • 84882949537 scopus 로고    scopus 로고
    • A hybrid constraint-based method for single-track railway scheduling problem
    • University of Leeds
    • Oliveira, E., and Smith, B.M., "A hybrid constraint-based method for single-track railway scheduling problem", Report 2001.04, School of Computing, University of Leeds, 2001. (Downloadable from http://www.comp.leeds.ac.uk/research/pubs/reports/2001/2001-04.pdf).
    • (2001) Report 2001. 04, School of Computing
    • Oliveira, E.1    Smith, B.M.2
  • 12
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies and methods
    • Vieira, E.G, Herrmann, J.W., and Lin, E., "Rescheduling manufacturing systems: a framework of strategies, policies and methods", Journal of Scheduling, 6 (2003) 39-62.
    • (2003) Journal of Scheduling , vol.6 , pp. 39-62
    • Vieira, E.G.1    Herrmann, J.W.2    Lin, E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.