메뉴 건너뛰기




Volumn 26, Issue 3, 2011, Pages 1444-1453

Balancing supply and demand under mixed pricing rules in multi-area electricity markets

Author keywords

Explicitly defined prices; implicitly defined prices; market coupling; mixed complementarity problem; multi area market clearing; multi area power dispatch; price coupling

Indexed keywords

EXPLICITLY DEFINED PRICES; IMPLICITLY DEFINED PRICES; MARKET CLEARING; MARKET COUPLING; MIXED COMPLEMENTARITY PROBLEMS; POWER DISPATCH; PRICE-COUPLING;

EID: 79960893852     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2010.2079338     Document Type: Article
Times cited : (32)

References (27)
  • 1
    • 79960891464 scopus 로고    scopus 로고
    • Medium-Term Vision for the Internal Electricity Market, Mar., [Online]. Available
    • Medium-Term Vision for the Internal Electricity Market, European Commission Directorate-General for Energy and Transport (DGTREN), Mar. 2004. [Online]. Available: http://ec.europa.eu/energy/ electricity/florence/doc/ florence-10/strategy-paper/strategy-paper- march-2004.pdf.
    • (2004) European Commission Directorate-General for Energy and Transport (DGTREN)
  • 3
    • 79960893072 scopus 로고    scopus 로고
    • European Market Coupling Company. [Online]. Available
    • European Market Coupling Company. [Online]. Available: http://www.marketcoupling.com.
  • 5
    • 0026953211 scopus 로고
    • A decomposition approach to non-linear multi-area generation scheduling with tie-line constraints using expert systems
    • DOI 10.1109/59.207362
    • C.Wang and S. M. Shadidehpour, "A decomposition approach to nonlinear multi-area generation scheduling with tie-line constraints using expert systems," IEEE Trans. Power Syst., vol. 7, no. 4, pp. 1409-1418, Nov. 1992. (Pubitemid 23568736)
    • (1992) IEEE Transactions on Power Systems , vol.7 , Issue.4 , pp. 1409-1418
    • Wang Chunyan1    Shahidehpour, S.M.2
  • 6
    • 39749127918 scopus 로고    scopus 로고
    • Multi-area power generation dispatch in competitive markets
    • DOI 10.1109/TPWRS.2007.913304
    • C. Yingvivatanapong, W. J. Lee, and E. Liu, "Multi-area power generation dispatch in competitive markets," IEEE Trans. Power Syst., vol. 23, no. 1, pp. 196-203, Feb. 2008. (Pubitemid 351292104)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.1 , pp. 196-203
    • Yingvivatanapong, C.1    Lee, W.-J.2    Liu, E.3
  • 7
    • 0028370414 scopus 로고
    • Multi-area unit commitment via sequential method and a DC power flow network model
    • Feb.
    • F. N. Lee, J. Huang, and R. Adapa, "Multi-area unit commitment via sequential method and a DC power flow network model," IEEE Trans. Power Syst., vol. 9, no. 1, pp. 279-287, Feb. 1994.
    • (1994) IEEE Trans. Power Syst. , vol.9 , Issue.1 , pp. 279-287
    • Lee, F.N.1    Huang, J.2    Adapa, R.3
  • 8
    • 0029405036 scopus 로고
    • Multi-area economic dispatch with tie-line constraints
    • Nov.
    • D. Streiffert, "Multi-area economic dispatch with tie-line constraints," IEEE Trans. Power Syst., vol. 10, no. 4, pp. 1946-1951, Nov. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , Issue.4 , pp. 1946-1951
    • Streiffert, D.1
  • 9
    • 0035979845 scopus 로고    scopus 로고
    • Multi-area power systems economic dispatch using nonlinear convex network flow programming
    • DOI 10.1016/S0378-7796(01)00131-6, PII S0378779601001316
    • J. Z. Zhu and J. A. Momoh, "Multi-area power systems economic dispatch using nonlinear convex network flow programming," Elect. Power Syst. Res., vol. 59, no. 1, pp. 13-20, Aug. 2001. (Pubitemid 32771114)
    • (2001) Electric Power Systems Research , vol.59 , Issue.1 , pp. 13-20
    • Zhu, J.1    Momoh, J.A.2
  • 10
    • 19944389572 scopus 로고    scopus 로고
    • Optimal generation and reserve dispatch in a multi-area competitive market using a hybrid direct search method
    • DOI 10.1016/j.enconman.2005.03.003, PII S0196890405000567
    • C.-L. Chen, "Optimal generation and reserve dispatch in a multi-area competitive market using a hybrid direct search method," Energy Convers. Manage., vol. 46, no. 18-19, pp. 2856-2872, Nov. 2005. (Pubitemid 40753008)
    • (2005) Energy Conversion and Management , vol.46 , Issue.18-19 , pp. 2856-2872
    • Chen, C.-L.1
  • 11
    • 84945953511 scopus 로고    scopus 로고
    • Two area power systems economic dispatch problem solving considering transmission capacity constraints
    • Sep.
    • M. Zarei, A. Roozegar, R. Kazemzadeh, and J. M. Kauffmann, "Two area power systems economic dispatch problem solving considering transmission capacity constraints," Proc. World Acad. Sci., Eng., Technol., vol. 33, pp. 147-152, Sep. 2007.
    • (2007) Proc. World Acad. Sci., Eng., Technol. , vol.33 , pp. 147-152
    • Zarei, M.1    Roozegar, A.2    Kazemzadeh, R.3    Kauffmann, J.M.4
  • 12
    • 0032592980 scopus 로고    scopus 로고
    • Energy and reserve dispatch in a multizone electricity market
    • Aug.
    • X. Ma,D. Sun, and K. Cheung, "Energy and reserve dispatch in a multizone electricity market," IEEE Trans. Power Syst., vol. 14, no. 3, pp. 913-919, Aug. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.3 , pp. 913-919
    • Ma, X.1    Sun, D.2    Cheung, K.3
  • 13
    • 79960893105 scopus 로고    scopus 로고
    • Multi-area security constrained economic dispatch by fuzzy-stochastic algorithms
    • Jan.
    • T. S. Prasanna and P. Somasundaram, "Multi-area security constrained economic dispatch by fuzzy-stochastic algorithms," J. Theoretic. Appl. Inf. Technol., vol. 5, no. 1, pp. 88-94, Jan. 2009.
    • (2009) J. Theoretic. Appl. Inf. Technol. , vol.5 , Issue.1 , pp. 88-94
    • Prasanna, T.S.1    Somasundaram, P.2
  • 14
    • 58949089563 scopus 로고    scopus 로고
    • Reserve-constrained multi-area environmental/ economic dispatch using enhanced particle swarm optimization
    • Mar.
    • L.Wang and C. Singh, "Reserve-constrained multi-area environmental/ economic dispatch using enhanced particle swarm optimization," Eng. Appl. Artif. Intell., vol. 22, no. 2, pp. 298-307, Mar. 2009.
    • (2009) Eng. Appl. Artif. Intell. , vol.22 , Issue.2 , pp. 298-307
    • Wang, L.1    Singh, C.2
  • 15
    • 70449727989 scopus 로고    scopus 로고
    • Generation and reserve dispatch in a competitive market using constrained particle swarm optimization
    • Jan.
    • E. N. Azadani, S. H. Hosseinian, and B. Moradzadeh, "Generation and reserve dispatch in a competitive market using constrained particle swarm optimization," Int. J. Elect. Power Energy Syst., vol. 32, no. 1, pp. 79-86, Jan. 2010.
    • (2010) Int. J. Elect. Power Energy Syst. , vol.32 , Issue.1 , pp. 79-86
    • Azadani, E.N.1    Hosseinian, S.H.2    Moradzadeh, B.3
  • 16
    • 77951903804 scopus 로고    scopus 로고
    • Environmentally constrained economic dispatch using Pareto archive particle swarm optimization
    • May
    • Y. M. Chen and W. S. Wang, "Environmentally constrained economic dispatch using Pareto archive particle swarm optimization," Int. J. Syst. Sci., vol. 41, no. 5, pp. 593-605, May 2010.
    • (2010) Int. J. Syst. Sci. , vol.41 , Issue.5 , pp. 593-605
    • Chen, Y.M.1    Wang, W.S.2
  • 17
    • 0026866552 scopus 로고
    • Multi-area unit commitment
    • May
    • F. N. Lee and Q. Feng, "Multi-area unit commitment," IEEE Trans. Power Syst., vol. 7, no. 2, pp. 591-599, May 1992.
    • (1992) IEEE Trans. Power Syst. , vol.7 , Issue.2 , pp. 591-599
    • Lee, F.N.1    Feng, Q.2
  • 19
    • 79960891904 scopus 로고    scopus 로고
    • UPPO Auction Module User Manual, Gestore dei Mercati Energetici (GME) Dec. [Online]. Available
    • UPPO Auction Module User Manual, Appendix A-Uniform Purchase Price Auction Algorithm, Gestore dei Mercati Energetici (GME), Dec. 2004. [Online]. Available: http://www.mercatoelettrico.org/It/Menu- Biblioteca/Documenti/ 20041206UniformPurchase.pdf.
    • (2004) Appendix A-Uniform Purchase Price Auction Algorithm
  • 20
    • 0036872107 scopus 로고    scopus 로고
    • Multiperiod auction for a pool-based electricity market
    • Nov.
    • J. M. Arroyo and A. J. Conejo, "Multiperiod auction for a pool-based electricity market," IEEE Trans. Power Syst., vol. 17, no. 4, pp. 1225-1231, Nov. 2002.
    • (2002) IEEE Trans. Power Syst. , vol.17 , Issue.4 , pp. 1225-1231
    • Arroyo, J.M.1    Conejo, A.J.2
  • 21
    • 0036699870 scopus 로고    scopus 로고
    • Network-constrained multiperiod auction for a pool-based electricity market
    • DOI 10.1109/TPWRS.2002.800909, PII 1011092002800909
    • A. L. Motto, F. D. Galiana, A. J. Conejo, and J. M. Arroyo, "Networkconstrained multiperiod auction for a pool-based electricity market," IEEE Trans. Power Syst., vol. 17, no. 3, pp. 646-653, Aug. 2002. (Pubitemid 35151738)
    • (2002) IEEE Transactions on Power Systems , vol.17 , Issue.3 , pp. 646-653
    • Motto, A.L.1    Galiana, F.D.2    Conejo, A.J.3    Arroyo, J.M.4
  • 22
    • 18944367302 scopus 로고    scopus 로고
    • Security-constrained unit commitment for simultaneous clearing of energy and ancillary services markets
    • DOI 10.1109/TPWRS.2005.846063
    • Z. Li and M. Shahidehpour, "Security constrained unit commitment for simultaneous clearing of energy and ancillary services market," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 1079-1088, May 2005. (Pubitemid 40699740)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 1079-1088
    • Li, Z.1    Shahidehpour, M.2
  • 24
    • 0031352141 scopus 로고    scopus 로고
    • Engineering and economic applications of complementarity problems
    • PII S0036144595285963
    • M. C. Ferris and J. S. Pang, "Engineering and economic applications of complementarity problems," SIAM Rev., vol. 39, no. 4, pp. 669-713, Dec. 1997. (Pubitemid 127661265)
    • (1997) SIAM Review , vol.39 , Issue.4 , pp. 669-713
    • Ferris, M.C.1    Pang, J.S.2
  • 27
    • 0032592961 scopus 로고    scopus 로고
    • The IEEE reliability test system-1996
    • Reliability Test System Task Force of the Application of Probability Methods Subcommittee, Aug.
    • Reliability Test System Task Force of the Application of Probability Methods Subcommittee, "The IEEE Reliability Test System-1996," IEEE Trans. Power Syst., vol. 14, no. 3, pp. 1010-1020, Aug. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.3 , pp. 1010-1020


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.