메뉴 건너뛰기




Volumn 26, Issue 3, 2011, Pages 1338-1348

Stochastic optimization model for electric power system planning of offshore wind farms

Author keywords

DC power transmission; electrical engineering; optimization methods; power systems; stochastic processes; wind power generation

Indexed keywords

CABLES; DC POWER TRANSMISSION; DECISION SUPPORT SYSTEMS; ELECTRIC POWER GENERATION; ELECTRIC POWER SYSTEMS; ELECTRIC POWER TRANSMISSION; ELECTRIC UTILITIES; ELECTRICAL ENGINEERING; OFFSHORE WIND FARMS; OPTIMIZATION; RANDOM PROCESSES; RELIABILITY; STANDBY POWER SYSTEMS; STOCHASTIC MODELS; WIND EFFECTS; WIND POWER;

EID: 79960891854     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2010.2075944     Document Type: Article
Times cited : (105)

References (34)
  • 1
    • 79960889520 scopus 로고    scopus 로고
    • European Wind Energy Association, January, [Online]. Available
    • European Wind Energy Association, Offshore Statistics January 2009. [Online]. Available: http://www.ewea.org/fileadmin/ewea-documents/ documents/statistics/Offshore-Wind-Farms-2008.pdf.
    • (2009) Offshore Statistics
  • 2
    • 13344266571 scopus 로고    scopus 로고
    • European Wind Energy Association, [Online]. Available
    • European Wind Energy Association, 2009, Wind Energy-The Facts. [Online]. Available: http://www.ewea.org/fileadmin/ewea-documents/ documents/publications/ WETF/1565-ExSum-ENG.pdf.
    • (2009) Wind Energy-The Facts
  • 3
    • 34748853851 scopus 로고    scopus 로고
    • Electrical collector system options for large offshore wind farms
    • DOI 10.1049/iet-rpg:20060017
    • G. Quinonez-Varela, G. W. Ault, O. Anaya-Lara, and J. R. McDonald, "Electrical collector system options for large offshore wind farms," IET Renew. Power Gener., vol. 1, no. 2, pp. 107-114, Jun. 2007. (Pubitemid 47472101)
    • (2007) IET Renewable Power Generation , vol.1 , Issue.2 , pp. 107-114
    • Quinonez-Varela, G.1    Ault, G.W.2    Anaya-Lara, O.3    McDonald, J.R.4
  • 4
    • 33645564163 scopus 로고    scopus 로고
    • Evaluation of wind farm layouts
    • Jan.-Feb.
    • S. Lundberg, "Evaluation of wind farm layouts," EPE J., vol. 16, no. 1, pp. 14-20, Jan.-Feb. 2006.
    • (2006) EPE J. , vol.16 , Issue.1 , pp. 14-20
    • Lundberg, S.1
  • 6
    • 33947651217 scopus 로고    scopus 로고
    • HVDC connection of offshore wind farms to the transmission system
    • DOI 10.1109/TEC.2006.889624, Special Issue on Wind Power
    • P. Bresesti, W. L. Kling, R. L. Hendriks, and R. Vailati, "HVDC connection of offshore wind farms to the transmission system," IEEE Trans. Energy Convers., vol. 22, no. 1, pp. 37-43, Mar. 2007. (Pubitemid 46499169)
    • (2007) IEEE Transactions on Energy Conversion , vol.22 , Issue.1 , pp. 37-43
    • Bresesti, P.1    Kling, W.L.2    Hendriks, R.L.3    Vailati, R.4
  • 7
    • 84875326278 scopus 로고    scopus 로고
    • Survey of reliability of large offshore wind farms
    • presented at the, [Online]. Available
    • N. B. Negra and O. Holmstrøm, "Survey of reliability of large offshore wind farms," presented at the European Wind Energy Conf., 2007. [Online]. Available: http://www.ewec2007proceedings.info/allfiles2/ 437-Ewec2007fullpaper.pdf.
    • (2007) European Wind Energy Conf.
    • Negra, N.B.1    Holmstrøm, O.2
  • 10
    • 34548292028 scopus 로고    scopus 로고
    • Generation ratio availability assessment of electrical systems for offshore wind farms
    • DOI 10.1109/TEC.2006.881391
    • M. Zhao, Z. Chen, and F. Blaabjerg, "Generation ratio availability assessment of electrical systems for offshore wind farms," IEEE Trans. Energy Convers., vol. 22, no. 3, pp. 755-763, Sep. 2007. (Pubitemid 47323591)
    • (2007) IEEE Transactions on Energy Conversion , vol.22 , Issue.3 , pp. 755-763
    • Zhao, M.1    Chen, Z.2    Blaabjerg, F.3
  • 12
    • 33947671422 scopus 로고    scopus 로고
    • Aspects of relevance in offshore wind farm reliability assessment
    • DOI 10.1109/TEC.2006.889610, Special Issue on Wind Power
    • N. B. Negra, O. Holmstrøm, B. Bak-Jensen, and P. Sorensen, "Aspects of relevance in offshore wind farm reliability assessment," IEEE Trans. Energy Convers., vol. 22, no. 1, pp. 159-166, Mar. 2007. (Pubitemid 46487488)
    • (2007) IEEE Transactions on Energy Conversion , vol.22 , Issue.1 , pp. 159-166
    • Barberis Negra, N.1    Holmstrom, O.2    Bak-Jensen, B.3    Sorensen, P.4
  • 13
    • 65349104978 scopus 로고    scopus 로고
    • Optimisation of electrical system for offshore wind farms via genetic algorithm
    • Jun.
    • M. Zhao, Z. Chen, and F. Blaabjerg, "Optimisation of electrical system for offshore wind farms via genetic algorithm," IET Renew. Power Gener., vol. 3, no. 2, pp. 205-216, Jun. 2009.
    • (2009) IET Renew. Power Gener. , vol.3 , Issue.2 , pp. 205-216
    • Zhao, M.1    Chen, Z.2    Blaabjerg, F.3
  • 15
    • 50249086283 scopus 로고    scopus 로고
    • Analysis of the behaviour of genetic algorithm applied in optimization of electrical system design for offshore wind farms
    • M. Zhao, Z. Chen, and J. Hjerrild, "Analysis of the behaviour of genetic algorithm applied in optimization of electrical system design for offshore wind farms," in Proc. 32nd Annu. Conf. IEEE Industrial Electronics, 2006, pp. 2335-2340.
    • (2006) Proc. 32nd Annu. Conf. IEEE Industrial Electronics , pp. 2335-2340
    • Zhao, M.1    Chen, Z.2    Hjerrild, J.3
  • 16
    • 36349016181 scopus 로고    scopus 로고
    • Vulnerability-constrained transmission expansion planning: A stochastic programming approach
    • DOI 10.1109/TPWRS.2007.907139
    • M. Carrión, J. M. Arroyo, and N. Alguacil, "Vulnerability- constrained transmission expansion planning: A stochastic programming approach," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 1436-1445, Nov. 2007. (Pubitemid 350141944)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 1436-1445
    • Carrion, M.1    Arroyo, J.M.2    Alguacil, N.3
  • 17
    • 68349150313 scopus 로고    scopus 로고
    • A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties
    • Aug.
    • H. Yu, C. Y. Chung, K. P. Wong, and J. H. Zhang, "A chance constrained transmission network expansion planning method with consideration of load and wind farm uncertainties," IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1568-1576, Aug. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.3 , pp. 1568-1576
    • Yu, H.1    Chung, C.Y.2    Wong, K.P.3    Zhang, J.H.4
  • 18
    • 77952270506 scopus 로고    scopus 로고
    • Multi-stage stochastic transmission expansion planning under load uncertainty using Benders decomposition
    • Oct.
    • T. Akbari, S. Zolfaghari, and A. Kazemi, "Multi-stage stochastic transmission expansion planning under load uncertainty using Benders decomposition," Int. Rev. Elect. Eng., vol. 4, no. 5, pp. 976-984, Oct. 2009.
    • (2009) Int. Rev. Elect. Eng. , vol.4 , Issue.5 , pp. 976-984
    • Akbari, T.1    Zolfaghari, S.2    Kazemi, A.3
  • 19
    • 0022723021 scopus 로고
    • Investment planning for hydro-thermal power system expansion: Stochastic programming employing the Dantzig-Wolfe decomposition principle
    • May
    • A. P. Sanghvi and I. H. Shavel, "Investment planning for hydro-thermal power system expansion: Stochastic programming employing the Dantzig-Wolfe decomposition principle," IEEE Trans. Power Syst., vol. 1, no. 2, pp. 115-121, May 1986.
    • (1986) IEEE Trans. Power Syst. , vol.1 , Issue.2 , pp. 115-121
    • Sanghvi, A.P.1    Shavel, I.H.2
  • 21
    • 0032071091 scopus 로고    scopus 로고
    • Electric capacity expansion under uncertain demand: Decomposition approaches
    • A. Marín and J. Salmerón, "Electric capacity expansion under uncertain demand: Decomposition approaches," IEEE Trans. Power Syst., vol. 13, no. 2, pp. 333-339, May 1998. (Pubitemid 128748877)
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.2 , pp. 333-339
    • Marin, A.1    Salmeron, J.2
  • 22
    • 0037321138 scopus 로고    scopus 로고
    • A heuristic for momentmatching scenario generation
    • Feb.-Mar.
    • K. Høyland, M. Kaut, and S. W. Wallace, "A heuristic for momentmatching scenario generation," Comput. Optim. Appl., vol. 24, no. 2-3, pp. 169-185, Feb.-Mar. 2003.
    • (2003) Comput. Optim. Appl. , vol.24 , Issue.2-3 , pp. 169-185
    • Høyland, K.1    Kaut, M.2    Wallace, S.W.3
  • 23
    • 33947616342 scopus 로고    scopus 로고
    • Clustering algorithms for scenario tree generation: Application to natural hydro inflows
    • DOI 10.1016/j.ejor.2005.11.045, PII S0377221706001858
    • J. M. Latorre, S. Cerisola, and A. Ramos, "Clustering algorithms for scenario tree generation: Application to natural hydro inflows," Eur. J. Oper. Res., vol. 181, no. 3, pp. 1339-1353, Sep. 2007. (Pubitemid 46498532)
    • (2007) European Journal of Operational Research , vol.181 , Issue.3 , pp. 1339-1353
    • Latorre, J.M.1    Cerisola, S.2    Ramos, A.3
  • 28
    • 79960893951 scopus 로고    scopus 로고
    • BOWind. [Online]. Available
    • BOWind. [Online]. Available: http://www.bowind.co.uk/.
  • 30
    • 79960889480 scopus 로고    scopus 로고
    • General Cable, (in Spanish) [Online]. Available
    • General Cable, Tables on Conductors (in Spanish) [Online]. Available: http://www.generalcable.es/Productos/AyudasTécnicas/tabid/378/Default. aspx.
    • Tables on Conductors
  • 34
    • 57449090055 scopus 로고    scopus 로고
    • CIGRE, Paris, France,Tech. Rep. 269, Apr., WG B4.37
    • CIGRE, VSC Transmission, Paris, France, Tech. Rep. 269, Apr. 2005, WG B4.37.
    • (2005) VSC Transmission


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.