메뉴 건너뛰기




Volumn 4, Issue 3, 2011, Pages 252-257

Concept of transport-oriented scheduling for reduction of inbound logistics traffic in the automotive industries

Author keywords

Logistics; Planning; Production; Scheduling

Indexed keywords

AUTOMOTIVE SECTOR; CO2 EMISSIONS; ECOLOGICAL IMPROVEMENT; ECOLOGICAL SYSTEMS; INBOUND LOGISTICS; SIMULATION MODEL; TECHNOLOGICAL INNOVATION; TRANSPORT PLANNING;

EID: 79960790364     PISSN: 17555817     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cirpj.2011.01.004     Document Type: Article
Times cited : (13)

References (18)
  • 2
    • 82955167678 scopus 로고    scopus 로고
    • Ausgabe, Vieweg+Teubner Verlag
    • Tomm A. Ökologisch planen und bauen 2000, vol. 3. Ausgabe, Vieweg+Teubner Verlag, pp. 1-24.
    • (2000) Ökologisch planen und bauen , vol.3 , pp. 1-24
    • Tomm, A.1
  • 12
    • 34249723788 scopus 로고    scopus 로고
    • Level-Scheduling bei Variantenfließfertigung. Klassifikation, Literaturüberblick und Modellkritik
    • Boysen N., Fliedner M., Scholl A. Level-Scheduling bei Variantenfließfertigung. Klassifikation, Literaturüberblick und Modellkritik. Journal für Betriebswirtschaft 2007, 2.
    • (2007) Journal für Betriebswirtschaft , pp. 2
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 17
    • 78650816316 scopus 로고    scopus 로고
    • Heijunka: Leveling Production
    • Jones D.T. Heijunka: Leveling Production. Manufacturing Engineering 2006, 132(2):7.
    • (2006) Manufacturing Engineering , vol.132 , Issue.2 , pp. 7
    • Jones, D.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.