-
1
-
-
79960618654
-
And for underground substation on-line monitoring system of power station design [J]
-
etc.
-
DingPing, Zhang Xiaoguang, etc. And for underground substation on-line monitoring system of power station design [J].journal of mining machines, 2010, 10 (14): 44-47.
-
(2010)
Journal of Mining Machines
, vol.10
, Issue.14
, pp. 44-47
-
-
Ding, P.1
Zhang, X.2
-
3
-
-
70450179110
-
Design and application of auto-con-tant water supply system [C]
-
Shenyang, China
-
LI Suling, LIU Junying. Design and Application of auto-con-tant water supply system [C]. IEEE International Conference on Automation and Logistics, Shenyang, China, 2009: 623-627.
-
(2009)
IEEE International Conference on Automation and Logistics
, pp. 623-627
-
-
Li, S.1
Liu, J.2
-
4
-
-
79960590092
-
Coal mine underground substation based on PLC automatic monitoring and controlling system [J]
-
Tan GuoJun, Wang SiJian coal mine underground substation based on PLC automatic monitoring and controlling system [J] journal of coal electrical machinery, 2006 (2): 12-14.
-
(2006)
Journal of Coal Electrical Machinery
, Issue.2
, pp. 12-14
-
-
Tan, G.J.1
Wang, S.J.2
-
5
-
-
79960591596
-
Based on the PROFIBUS field bus coal power supervisory system [J]
-
etc.
-
Cheng Zhenqi, Zhang Xiaoguang, etc. Based on the PROFIBUS field bus coal power supervisory system [J] journal of coal mine machinery, 2007, (11): 142-143.
-
(2007)
Journal of Coal Mine Machinery
, Issue.11
, pp. 142-143
-
-
Cheng, Z.1
Zhang, X.2
-
6
-
-
77955632295
-
Discussion on management modes of unattended substations and centralized control centers in north China power grid
-
etc
-
WANG Jingjing, LIU Wei, etc. Discussion on management modes of unattended substations and centralized control centers in North China power grid. East China Electric Power, 2009, 37(10): 1732-1734.
-
(2009)
East China Electric Power
, vol.37
, Issue.10
, pp. 1732-1734
-
-
Wang, J.1
Liu, W.2
-
7
-
-
79960612754
-
Adapt to the local grid dispatching intensive management to construct control integration integrating [J]
-
Zhao Liang, Qian YuChun. Adapt to the local grid dispatching intensive management to construct control integration integrating [J] journal of automation of electric power systems, 2010, 14 (22) 96-99.
-
(2010)
Journal of Automation of Electric Power Systems
, vol.14
, Issue.22
, pp. 96-99
-
-
Zhao, L.1
Qian, Y.C.2
-
8
-
-
79960607357
-
Based on industrial ethernet and fieldbus coal power supervisory system [J]
-
Zi Xingjian, Xu Zhong. Based on industrial Ethernet and fieldbus coal power supervisory system [J] journal of coal project, 2010, 2 (49): 115-117.
-
(2010)
Journal of Coal Project
, vol.2
, Issue.49
, pp. 115-117
-
-
Zi, X.1
Xu, Z.2
-
9
-
-
60949106954
-
Design of a new substation communication controller [J]
-
etc
-
XU Ke, HU Minqiang, etc. Design of a new substation communication controller [J]. Proceedings of the EPS A, 2006, 18 (6): 38-42.
-
(2006)
Proceedings of the EPS A
, vol.18
, Issue.6
, pp. 38-42
-
-
Xu, K.1
Hu, M.2
-
11
-
-
56349158787
-
Analysis and implementation of real-time performance for QNX-based subway PSCADA system [J]
-
etc.
-
TAO Yi, YANG Hongyu, etc. Analysis and implementation of real-time performance for QNX - based subway PSCADA system [J]. Electric Power Automation Equipment, 2008, 28 (11): 87-90.
-
(2008)
Electric Power Automation Equipment
, vol.28
, Issue.11
, pp. 87-90
-
-
Tao, Y.1
Yang, H.2
-
12
-
-
79960593761
-
Based on CDT power data acquisition method and algorithm study [J]
-
etc.
-
Ren YongChang, Xing Tao, etc. Based on CDT power data acquisition method and algorithm study [J] journal of micro computer information, 2009, (5): 95-97.
-
(2009)
Journal of Micro Computer Information
, Issue.5
, pp. 95-97
-
-
Ren, Y.C.1
Tao, X.2
|