메뉴 건너뛰기




Volumn 49, Issue 14, 2011, Pages 4335-4351

Production flow control in the automotive industry - Quick scan approach

Author keywords

automotive industry; disturbances; production planning and control; uncertainty

Indexed keywords

ASSEMBLY PLANTS; COMPLEX PRODUCTION; DISTURBANCES; MANUFACTURING OPERATIONS; NUMERICAL EXAMPLE; PRODUCTION FLOWS; PRODUCTION PLANNING AND CONTROL; PRODUCTION SYSTEM; UNCERTAINTY;

EID: 79958830384     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.536180     Document Type: Conference Paper
Times cited : (13)

References (15)
  • 1
    • 0027624544 scopus 로고
    • A structured analysis of material requirements planning systemsunder combined demand and supply uncertainty
    • Brennan, L. and Gupta, S.M., 1993. A structured analysis of material requirements planning systemsunder combined demand and supply uncertainty. International Journal of Production Research, 31 (7), 1689-1707.
    • (1993) International Journal of Production Research , vol.31 , Issue.7 , pp. 1689-1707
    • Brennan, L.1    Gupta, S.M.2
  • 2
    • 0004274964 scopus 로고    scopus 로고
    • 9th edition. Alexandria, VA: APICS, TheEducational Society for Resource Management
    • Cox, J.F. and Blackstone, J.H., 1998. APICS dictionary. 9th edition. Alexandria, VA: APICS, TheEducational Society for Resource Management.
    • (1998) APICS Dictionary
    • Cox, J.F.1    Blackstone, J.H.2
  • 5
    • 0034175277 scopus 로고    scopus 로고
    • A review of techniques for buffering against uncertainty with MRP systems
    • DOI 10.1080/095372800232199
    • Guide, V.D.R. and Srivastava, R., 2000. A review of techniques for buffering against uncertaintywith MRP systems. Production, Planning and Control, 11 (3), 223-233. (Pubitemid 35394352)
    • (2000) Production Planning and Control , vol.11 , Issue.3 , pp. 223-233
    • Guide Jr., V.D.R.1    Srivastava, R.2
  • 6
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedures to cope with MRP system nervousness
    • Ho, C.J. and Carter, P.L., 1996. An investigation of alternative dampening procedures to cope withMRP system nervousness. International Journal of Production Research, 34 (1), 137-156. (Pubitemid 126519725)
    • (1996) International Journal of Production Research , vol.34 , Issue.1 , pp. 137-156
    • Ho, C.-J.1    Carter, P.L.2
  • 9
    • 0037054916 scopus 로고    scopus 로고
    • Uncertainty under MRP-planned manufacture:review and categorization
    • Koh, L.S.C., Saad, S.M., and Jones, M.H., 2002. Uncertainty under MRP-planned manufacture:review and categorization. International Journal of Production Research, 40 (10), 2399-2421.
    • (2002) International Journal of Production Research , vol.40 , Issue.10 , pp. 2399-2421
    • Koh, L.S.C.1    Saad, S.M.2    Jones, M.H.3
  • 10
    • 36849081547 scopus 로고    scopus 로고
    • How uncertainty disturbs SME manufacturers
    • 3-7 August 2003, Blacksburg, Virginia, USA
    • Koh, L.S.C. and Saad, S.M., 2003. How uncertainty disturbs SME manufacturers. In: Proceedings of the 17th ICPR, 3-7 August 2003, Blacksburg, Virginia, USA.
    • (2003) Proceedings of the 17th ICPR
    • Koh, L.S.C.1    Saad, S.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.