메뉴 건너뛰기




Volumn 54, Issue 9-12, 2011, Pages 1199-1218

Optimal management of remanufacturing systems with server vacations

Author keywords

Buffer allocation; Performance evaluation; Queueing networks; Remanufacturing; Server vacations; Throughput

Indexed keywords

BUFFER ALLOCATION; EXPANSION METHODOLOGY; EXPERIMENTAL CONDITIONS; FINITE BUFFER; OPEN QUEUEING NETWORKS; OPTIMAL MANAGEMENT; PERFORMANCE EVALUATION; QUEUING SYSTEMS; REMANUFACTURING; REMANUFACTURING SYSTEM; SERVER VACATIONS; SYSTEM'S PERFORMANCE; TESTING MODULES;

EID: 79958818055     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-3001-z     Document Type: Article
Times cited : (19)

References (78)
  • 1
    • 14644408666 scopus 로고    scopus 로고
    • Buffer allocation plan for a remanufacturing cell
    • DOI 10.1016/j.cie.2003.03.007, PII S0360835204002086, GroupTechnology/Cellular Manufacturing
    • HK Aksoy SM Gupta 2005 Buffer allocation plan for a remanufacturing cell Comput Ind Eng 48 657 677 10.1016/j.cie.2003.03.007 (Pubitemid 40308654)
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.3 , pp. 657-677
    • Aksoy, H.K.1    Gupta, S.M.2
  • 3
    • 17044366687 scopus 로고    scopus 로고
    • Remanufacturing control in multistage systems with stochastic recovery rates
    • DOI 10.1117/12.580418, 32, Environmentally Conscious Manufacturing IV
    • Aksoy HK, Gupta SM (2004) Remanufacturing control in multistage systems with stochastic recovery rates. Proceedings of the SPIE international conference on environmentally conscious manufacturing, pp 264-273 (Pubitemid 40494517)
    • (2004) Proceedings of SPIE - The International Society for Optical Engineering , vol.5583 , pp. 264-273
    • Aksoy, K.K.1    Gupta, S.M.2
  • 4
    • 79958777709 scopus 로고    scopus 로고
    • Recursive method to calculate reliability of (M, N) systems with service facility and general vacation for repairman
    • 2273252 1153.90380
    • G Arulmozhi 2006 Recursive method to calculate reliability of (M, N) systems with service facility and general vacation for repairman Opsearch 43 3 259 273 2273252 1153.90380
    • (2006) Opsearch , vol.43 , Issue.3 , pp. 259-273
    • Arulmozhi, G.1
  • 5
    • 34047106692 scopus 로고    scopus 로고
    • On the GI/M/1/N queue with multiple working vacations-analytic analysis and computation
    • DOI 10.1016/j.apm.2006.05.010, PII S0307904X06001260
    • AD Banik UC Gupta SS Pathak 2007 On the GI/M/1/N queue with multiple working vacations-analytic analysis and computation Appl Math Model 31 9 1701 1710 1167.90441 10.1016/j.apm.2006.05.010 (Pubitemid 46523705)
    • (2007) Applied Mathematical Modelling , vol.31 , Issue.9 , pp. 1701-1710
    • Banik, A.D.1    Gupta, U.C.2    Pathak, S.S.3
  • 6
    • 21844513640 scopus 로고
    • Operations planning issues in an assembly/disassembly environment
    • 10.1108/01443579410066767
    • L Brennan SM Gupta KN Taleb 1994 Operations planning issues in an assembly/disassembly environment Int Journal Oper Prod Plan 14 9 57 67 10.1108/01443579410066767
    • (1994) Int Journal Oper Prod Plan , vol.14 , Issue.9 , pp. 57-67
    • Brennan, L.1    Gupta, S.M.2    Taleb, K.N.3
  • 7
    • 33747133161 scopus 로고    scopus 로고
    • A trial solution approach to the GI/M/1 queue with N-policy and exponential vacations
    • 2095758
    • KC Chae SM Lee NK Kim JD Kim HW Lee 2004 A trial solution approach to the GI/M/1 queue with N-policy and exponential vacations J Korean Stat Soc 33 3 283 298 2095758
    • (2004) J Korean Stat Soc , vol.33 , Issue.3 , pp. 283-298
    • Chae, K.C.1    Lee, S.M.2    Kim, N.K.3    Kim, J.D.4    Lee, H.W.5
  • 8
    • 79958815422 scopus 로고    scopus 로고
    • An absorbing Markov chain approach to GI/M/1 queues with generalized vacations
    • KC Chae SM Lee 2005 An absorbing Markov chain approach to GI/M/1 queues with generalized vacations Asia Pac Manag Rev 10 3 163 167
    • (2005) Asia Pac Manag Rev , vol.10 , Issue.3 , pp. 163-167
    • Chae, K.C.1    Lee, S.M.2
  • 9
    • 33747129511 scopus 로고    scopus 로고
    • On stochastic decomposition in the GI/M/1 queue with single exponential vacation
    • DOI 10.1016/j.orl.2005.11.006, PII S0167637705001483
    • KC Chae S Min Lee H Woo Lee 2006 On stochastic decomposition in the GI/M/1 queue with single exponential vacation Oper Res Lett 34 6 706 712 2251521 1112.90016 10.1016/j.orl.2005.11.006 (Pubitemid 44223817)
    • (2006) Operations Research Letters , vol.34 , Issue.6 , pp. 706-712
    • Chae, K.C.1    Min Lee, S.2    Woo Lee, H.3
  • 10
    • 66149130748 scopus 로고    scopus 로고
    • Analysis of a multi-server queue with Markovian arrivals and synchronous phase type vacations
    • 2509089 1177.90087 10.1142/S0217595909002134
    • SR Chakravarthy 2009 Analysis of a multi-server queue with Markovian arrivals and synchronous phase type vacations Asia-Pac J Oper Res 26 1 85 113 2509089 1177.90087 10.1142/S0217595909002134
    • (2009) Asia-Pac J Oper Res , vol.26 , Issue.1 , pp. 85-113
    • Chakravarthy, S.R.1
  • 11
    • 33748928486 scopus 로고    scopus 로고
    • Analysis and computational algorithm for queues with state-dependent vacations I: G/M(n)/1/K
    • DOI 10.1007/s11424-006-0036-1
    • X Chao A Rahman 2006 Analysis and computational algorithm for queues with state-dependent vacations I: G/M(n)/1/K J Syst Sci Complex 19 1 36 53 2231237 1106.60072 10.1007/s11424-006-0036-1 (Pubitemid 44432040)
    • (2006) Journal of Systems Science and Complexity , vol.19 , Issue.1 , pp. 36-53
    • Chao, X.1    Rahman, A.2
  • 12
    • 0032353951 scopus 로고    scopus 로고
    • On a batch arrival Poisson queue with a random setup time and vacation period
    • 1644175 1040.90511 10.1016/S0305-0548(98)00038-0
    • G Choudhury 1998 On a batch arrival Poisson queue with a random setup time and vacation period Comput Oper Res 25 12 1013 1026 1644175 1040.90511 10.1016/S0305-0548(98)00038-0
    • (1998) Comput Oper Res , vol.25 , Issue.12 , pp. 1013-1026
    • Choudhury, G.1
  • 13
    • 0023981046 scopus 로고    scopus 로고
    • The role work-in-process inventories in series production lines
    • 10.1287/opre.36.2.229
    • RW Conway WL Maxwell JO McClain LJ Thomas 1998 The role work-in-process inventories in series production lines Oper Res 36 229 241 10.1287/opre.36.2.229
    • (1998) Oper Res , vol.36 , pp. 229-241
    • Conway, R.W.1    Maxwell, W.L.2    McClain, J.O.3    Thomas, L.J.4
  • 14
    • 65049089067 scopus 로고    scopus 로고
    • Analysis of cyclic queueing networks with parallelism and vacation
    • 2506277 1169.90341 10.1007/s10479-008-0433-z
    • PV de Nitto 2009 Analysis of cyclic queueing networks with parallelism and vacation Ann Oper Res 170 1 95 112 2506277 1169.90341 10.1007/s10479-008- 0433-z
    • (2009) Ann Oper Res , vol.170 , Issue.1 , pp. 95-112
    • De Nitto, P.V.1
  • 15
    • 34250125289 scopus 로고
    • Single server queues with vacations - A survey
    • 896237 0655.60089 10.1007/BF01149327
    • BT Doshi 1986 Single server queues with vacations-a survey Queueing Syst 1 29 66 896237 0655.60089 10.1007/BF01149327
    • (1986) Queueing Syst , vol.1 , pp. 29-66
    • Doshi, B.T.1
  • 16
    • 0040150529 scopus 로고    scopus 로고
    • Material planning for a remanufacturing facility
    • G Ferrer DC Whybark 2001 Material planning for a remanufacturing facility Prod Oper Manag 10 2 112 124 10.1111/j.1937-5956.2001.tb00073.x (Pubitemid 33600444)
    • (2001) Production and Operations Management , vol.10 , Issue.2 , pp. 112-124
    • Ferrer, G.1    Whybark, D.C.2
  • 17
    • 0035546618 scopus 로고    scopus 로고
    • On the widget remanufacturing operation
    • DOI 10.1016/S0377-2217(00)00318-0, PII S0377221700003180
    • G Ferrer 2001 On the widget remanufacturing operation Eur J Oper Res 135 2 373 393 1857442 1051.91030 10.1016/S0377-2217(00)00318-0 (Pubitemid 32842075)
    • (2001) European Journal of Operational Research , vol.135 , Issue.2 , pp. 373-393
    • Ferrer, G.1
  • 20
    • 0022130542 scopus 로고
    • Stochastic decomposition in the M/G/1 queue with generalized vacation
    • SW Fuhrmann RB Cooper 1985 Stochastic decomposition in the M/G/1 queue with generalized vacation Oper Res 33 1117 1129 806922 0585.90033 10.1287/opre.33.5.1117 (Pubitemid 15589833)
    • (1985) Operations Research , vol.33 , Issue.5 , pp. 1117-1129
    • Fuhrmann, S.W.1    Cooper Robert, B.2
  • 21
    • 0031143697 scopus 로고    scopus 로고
    • Buffering from material recovery uncertainty in a recoverable manufacturing environment
    • VDR Guide Jr R Srivastava 1997 Buffering from material recovery uncertainty in a recoverable manufacturing environment J Oper Res Soc 48 519 529 0882.90060 (Pubitemid 127599408)
    • (1997) Journal of the Operational Research Society , vol.48 , Issue.5 , pp. 519-529
    • Guide Jr., V.D.R.1    Srivastava, R.2
  • 22
    • 0033358107 scopus 로고    scopus 로고
    • Issues in environmentally conscious manufacturing and product recovery: A survey
    • DOI 10.1016/S0360-8352(99)00167-9
    • A Gungor SM Gupta 1999 Issues in environmentally conscious manufacturing and product recovery: a survey Comput Ind Eng 36 811 853 10.1016/S0360-8352(99) 00167-9 (Pubitemid 30527322)
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.4 , pp. 811-853
    • Gungor, A.1    Gupta, S.M.2
  • 23
    • 0031118455 scopus 로고    scopus 로고
    • Machine interference problem with warm spares, server vacations and exhaustive service
    • PII S0166531696000466
    • SM Gupta 1997 Machine interference problem with warm spares, server vacations and exhaustive service Perform Eval 29 3 195 211 10.1016/S0166- 5316(96)00046-6 (Pubitemid 127420717)
    • (1997) Performance Evaluation , vol.29 , Issue.3 , pp. 195-211
    • Gupta, S.M.1
  • 25
    • 0034384882 scopus 로고    scopus 로고
    • Production systems with interruptions, arbitrary topology and finite buffers
    • 1769675 0953.90019 10.1023/A:1018971822978
    • SM Gupta A Kavusturucu 2000 Production systems with interruptions, arbitrary topology and finite buffers Ann Oper Res 93 145 176 1769675 0953.90019 10.1023/A:1018971822978
    • (2000) Ann Oper Res , vol.93 , pp. 145-176
    • Gupta, S.M.1    Kavusturucu, A.2
  • 26
    • 39449090874 scopus 로고    scopus 로고
    • S.M. Gupta A.J.D. Lambert (eds). CRC Boca Raton ISBN: 9780849335525
    • Gupta SM, Lambert AJD (eds) (2008) Environment conscious manufacturing. CRC, Boca Raton, ISBN: 9780849335525
    • (2008) Environment Conscious Manufacturing
  • 27
    • 0001353411 scopus 로고
    • Scheduling disassembly
    • 0896.90118 10.1080/00207549408957046
    • SM Gupta KN Taleb 1994 Scheduling disassembly Int J Prod Res 32 1857 1866 0896.90118 10.1080/00207549408957046
    • (1994) Int J Prod Res , vol.32 , pp. 1857-1866
    • Gupta, S.M.1    Taleb, K.N.2
  • 28
    • 0032650282 scopus 로고    scopus 로고
    • An algorithm for optimal buffer placement in reliable serial lines
    • JH Harris SG Powell 1999 An algorithm for optimal buffer placement in reliable serial lines IIE Trans 31 287 302
    • (1999) IIE Trans , vol.31 , pp. 287-302
    • Harris, J.H.1    Powell, S.G.2
  • 29
    • 10444257263 scopus 로고    scopus 로고
    • Competitive advantage through take-back of used products
    • 1132.90351 10.1016/j.ejor.2003.11.008
    • HS Heese K Cattani G Ferrer W Gilland AV Roth 2005 Competitive advantage through take-back of used products Eur J Oper Res 164 143 157 1132.90351 10.1016/j.ejor.2003.11.008
    • (2005) Eur J Oper Res , vol.164 , pp. 143-157
    • Heese, H.S.1    Cattani, K.2    Ferrer, G.3    Gilland, W.4    Roth, A.V.5
  • 30
    • 0017538789 scopus 로고
    • Optimal disposal policies for a single item inventory system with returns
    • 464437 0371.90034 10.1002/nav.3800240302
    • DP Heyman 1977 Optimal disposal policies for a single item inventory system with returns Nav Res Logist Q 24 385 405 464437 0371.90034 10.1002/nav.3800240302
    • (1977) Nav Res Logist Q , vol.24 , pp. 385-405
    • Heyman, D.P.1
  • 31
    • 0001012830 scopus 로고
    • The effect of the coefficient of variation of operation times on the allocation of storage space in production line system
    • 10.1080/07408179108963854
    • FS Hillier KC So 1991 The effect of the coefficient of variation of operation times on the allocation of storage space in production line system IIE Trans 23 198 206 10.1080/07408179108963854
    • (1991) IIE Trans , vol.23 , pp. 198-206
    • Hillier, F.S.1    So, K.C.2
  • 32
    • 0345072525 scopus 로고    scopus 로고
    • Inventory and capacity trade-off in a manufacturing cell
    • 10.1016/S0925-5273(98)00101-7
    • SF Hurley DC Whybark 1999 Inventory and capacity trade-off in a manufacturing cell Int J Prod Econ 59 203 212 10.1016/S0925-5273(98)00101-7
    • (1999) Int J Prod Econ , vol.59 , pp. 203-212
    • Hurley, S.F.1    Whybark, D.C.2
  • 33
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
    • 10.1016/j.jenvman.2009.09.037
    • MA Ilgin SM Gupta 2010 Environmentally conscious manufacturing and product recovery (ECMPRO): a review of the state of the art J Environ Manag 91 3 563 591 10.1016/j.jenvman.2009.09.037
    • (2010) J Environ Manag , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 34
    • 79952391386 scopus 로고    scopus 로고
    • GI/M/1 queues with server vacations and dependent interarrival and service times
    • 2414662
    • SK Iyer K Sikdar 2008 GI/M/1 queues with server vacations and dependent interarrival and service times Qual Technol Quant Manag 5 1 63 75 2414662
    • (2008) Qual Technol Quant Manag , vol.5 , Issue.1 , pp. 63-75
    • Iyer, S.K.1    Sikdar, K.2
  • 35
    • 0028392675 scopus 로고
    • Open finite queueing networks with M/M/C/K parallel servers
    • 0789.90034 10.1016/0305-0548(94)90092-2
    • S Jain JM Smith 1994 Open finite queueing networks with M/M/C/K parallel servers Comp Oper Res 21 3 297 317 0789.90034 10.1016/0305-0548(94)90092-2
    • (1994) Comp Oper Res , vol.21 , Issue.3 , pp. 297-317
    • Jain, S.1    Smith, J.M.2
  • 36
    • 7244232826 scopus 로고    scopus 로고
    • Bilevel control of degraded machining system with warm standbys, setup and vacation
    • DOI 10.1016/j.apm.2004.03.009, PII S0307904X04000502
    • M Jain SM Rakhee 2004 Bilevel control of degraded machining system with warm standbys, setup and vacation Appl Math Model 28 12 1015 1026 1090.90051 10.1016/j.apm.2004.03.009 (Pubitemid 39437192)
    • (2004) Applied Mathematical Modelling , vol.28 , Issue.12 , pp. 1015-1026
    • Jain, M.1    Rakhee, M.S.2
  • 37
    • 78049399578 scopus 로고    scopus 로고
    • Threshold N-policy for degraded machining system with multiple type spares and multiple vacations
    • 2750712
    • M Jain S Upadhyaya 2009 Threshold N-policy for degraded machining system with multiple type spares and multiple vacations Qual Technol Quant Manag 6 2 185 203 2750712
    • (2009) Qual Technol Quant Manag , vol.6 , Issue.2 , pp. 185-203
    • Jain, M.1    Upadhyaya, S.2
  • 38
    • 69249216739 scopus 로고    scopus 로고
    • Working vacations queueing model with multiple types of server breakdowns
    • 2566676 1185.90048 10.1016/j.apm.2009.03.019
    • M Jain A Jain 2010 Working vacations queueing model with multiple types of server breakdowns Appl Math Model 34 1 1 13 2566676 1185.90048 10.1016/j.apm.2009.03.019
    • (2010) Appl Math Model , vol.34 , Issue.1 , pp. 1-13
    • Jain, M.1    Jain, A.2
  • 40
    • 0032120277 scopus 로고    scopus 로고
    • Tandem manufacturing systems with machine vacations
    • A Kavusturucu SM Gupta 1998 Tandem manufacturing system with machine vacations Prod Plan Control 9 5 494 503 10.1080/095372898233975 (Pubitemid 128624340)
    • (1998) Production Planning and Control , vol.9 , Issue.5 , pp. 494-503
    • Kavusturucu, A.1    Gupta, S.M.2
  • 41
    • 0033524330 scopus 로고    scopus 로고
    • Manufacturing systems with machine vacations, arbitrary topology and finite buffers
    • 10.1016/S0925-5273(98)00209-6
    • A Kavusturucu SM Gupta 1999 Manufacturing systems with machine vacations, arbitrary topology and finite buffers Int J Prod Econ 58 1 15 10.1016/S0925-5273(98)00209-6
    • (1999) Int J Prod Econ , vol.58 , pp. 1-15
    • Kavusturucu, A.1    Gupta, S.M.2
  • 42
    • 1642419530 scopus 로고    scopus 로고
    • The Analysis of a General Input Queue with N Policy and Exponential Vacations
    • DOI 10.1023/A:1026045706255
    • JC Ke 2003 The analysis of a general input queue with N policy and exponential vacations Queueing Syst 45 2 135 160 2017174 1052.90019 10.1023/A:1026045706255 (Pubitemid 38117961)
    • (2003) Queueing Systems , vol.45 , Issue.2 , pp. 135-160
    • Ke, J.-C.1
  • 43
    • 33645284984 scopus 로고    scopus 로고
    • Vacation policies for machine interference problem with an un-reliable server and state-dependent service rate
    • JC Ke 2006 Vacation policies for machine interference problem with an un-reliable server and state-dependent service rate J Chin Inst Ind Eng 23 2 100 114
    • (2006) J Chin Inst Ind Eng , vol.23 , Issue.2 , pp. 100-114
    • Ke, J.C.1
  • 44
    • 33751543103 scopus 로고    scopus 로고
    • A single vacation model G/M/1/K with N threshold policy
    • 2303081 1192.90045
    • JC Ke KH Wang CH Liou 2006 A single vacation model G/M/1/K with N threshold policy Sankhya: Indian J Stat 68 2 198 226 2303081 1192.90045
    • (2006) Sankhya: Indian J Stat , vol.68 , Issue.2 , pp. 198-226
    • Ke, J.C.1    Wang, K.H.2    Liou, C.H.3
  • 45
    • 33845589090 scopus 로고    scopus 로고
    • Vacation policies for machine repair problem with two type spares
    • DOI 10.1016/j.apm.2006.02.009, PII S0307904X06000618
    • JC Ke KH Wang 2007 Vacation policies for machine repair problem with two type spares Appl Math Model 31 5 880 894 1137.90422 10.1016/j.apm.2006.02.009 (Pubitemid 44932999)
    • (2007) Applied Mathematical Modelling , vol.31 , Issue.5 , pp. 880-894
    • Ke, J.-C.1    Wang, K.-H.2
  • 46
    • 59149089906 scopus 로고    scopus 로고
    • Machine repair problem in production systems with spares and server vacations
    • 2502324 1158.60378 10.1051/ro/2009004
    • JC Ke SL Lee CH Liou 2009 Machine repair problem in production systems with spares and server vacations RAIRO-Oper Res 43 1 35 54 2502324 1158.60378 10.1051/ro/2009004
    • (2009) RAIRO-Oper Res , vol.43 , Issue.1 , pp. 35-54
    • Ke, J.C.1    Lee, S.L.2    Liou, C.H.3
  • 47
    • 0024479644 scopus 로고
    • Blocking probability for M/G/1 vacation systems with occupancy level dependent schedules
    • 989093 0666.60097 10.1287/opre.37.1.134
    • J Keilson L Servi 1989 Blocking probability for M/G/1 vacation systems with occupancy level dependent schedules Oper Res 37 134 140 989093 0666.60097 10.1287/opre.37.1.134
    • (1989) Oper Res , vol.37 , pp. 134-140
    • Keilson, J.1    Servi, L.2
  • 48
    • 21144473381 scopus 로고
    • The M/G/1/K blocking formula and its generalizations to state-dependent vacation systems and priority systems
    • 1238665 0781.60091 10.1007/BF01153529
    • J Keilson L Servi 1993 The M/G/1/K blocking formula and its generalizations to state-dependent vacation systems and priority systems Queueing Syst 14 111 123 1238665 0781.60091 10.1007/BF01153529
    • (1993) Queueing Syst , vol.14 , pp. 111-123
    • Keilson, J.1    Servi, L.2
  • 50
    • 0023847309 scopus 로고
    • Asymptotic behavior of the expansion method for open finite queueing networks
    • DOI 10.1016/0305-0548(88)90008-1
    • L Kerbache JM Smith 1988 Asymptotic behavior of the expansion method for open finite queueing networks Comp Oper Res 15 2 157 169 0662.60105 10.1016/0305-0548(88)90008-1 (Pubitemid 18594022)
    • (1988) Computers and Operations Research , vol.15 , Issue.2 , pp. 157-169
    • Kerbache Laoucine1    Smith J.MacGregor2
  • 51
    • 33748526878 scopus 로고    scopus 로고
    • Disassembly sequencing using genetic algorithm
    • DOI 10.1007/s00170-005-0041-x, Intelligent Disassembly in the Demanufacturing Process
    • E Kongar SM Gupta 2006 Disassembly sequencing using genetic algorithm Int J Adv Manuf Technol 30 5-6 497 506 10.1007/s00170-005-0041-x (Pubitemid 44370985)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.30 , Issue.5-6 , pp. 497-506
    • Kongar, E.1    Gupta, S.M.2
  • 52
    • 0019037937 scopus 로고
    • Isolation method in a network of queues
    • 10.1109/TSE.1980.234493
    • J Labetolle G Pujolle 1980 Isolation method in a network of queues IEEE Trans Softw Eng 6 4 373 380 10.1109/TSE.1980.234493
    • (1980) IEEE Trans Softw Eng , vol.6 , Issue.4 , pp. 373-380
    • Labetolle, J.1    Pujolle, G.2
  • 53
    • 0038156629 scopus 로고    scopus 로고
    • Disassembly sequencing: A survey
    • 1059.90055 10.1080/0020754031000120078
    • AJD Lambert 2003 Disassembly sequencing: a survey Int J Prod Res 41 16 3721 3759 1059.90055 10.1080/0020754031000120078
    • (2003) Int J Prod Res , vol.41 , Issue.16 , pp. 3721-3759
    • Lambert, A.J.D.1
  • 55
    • 0021468908 scopus 로고
    • M/G/1/N queue with vacation time and exhaustive service discipline
    • T Lee 1984 The M/G/1/N queue with vacation time and exhaustive service discipline Oper Res 32 774 784 865578 0559.90032 10.1287/opre.32.4.774 (Pubitemid 14641220)
    • (1984) Operations Research , vol.32 , Issue.4 , pp. 774-784
    • Lee Tony, T.1
  • 56
    • 0042283595 scopus 로고    scopus 로고
    • Periodic review, push inventory policies for remanufacturing
    • 10.1016/S0377-2217(02)00627-6
    • B Mahedavan DF Pyke M Fleischmann 2003 Periodic review, push inventory policies for remanufacturing Eur J Oper Res 151 536 551 10.1016/S0377-2217(02) 00627-6
    • (2003) Eur J Oper Res , vol.151 , pp. 536-551
    • Mahedavan, B.1    Pyke, D.F.2    Fleischmann, M.3
  • 57
    • 33748559516 scopus 로고    scopus 로고
    • Ant colony optimization for disassembly sequencing with multiple objectives
    • DOI 10.1007/s00170-005-0037-6, Intelligent Disassembly in the Demanufacturing Process
    • SM McGovern SM Gupta 2006 Ant colony optimization for disassembly sequencing with multiple objectives Int J Adv Manuf Technol 30 5-6 481 496 10.1007/s00170-005-0037-6 (Pubitemid 44370984)
    • (2006) International Journal of Advanced Manufacturing Technology , vol.30 , Issue.5-6 , pp. 481-496
    • McGovern, S.M.1    Gupta, S.M.2
  • 58
    • 0002198641 scopus 로고    scopus 로고
    • Optimal control of production and remanufacturing in a simple recovery model with linear cost functions
    • S Minner R Kleber 2001 Optimal control of production and remanufacturing in a simple recovery model with linear cost function OR Spektrum 23 3 24 1817450 1015.90001 10.1007/PL00013344 (Pubitemid 33692891)
    • (2001) OR Spektrum , vol.23 , Issue.1 , pp. 3-24
    • Minner, S.1    Kleber, R.2
  • 59
    • 7044252312 scopus 로고    scopus 로고
    • Environmental concerns and recycling/disassembly efforts in the electronics industry
    • LK Moyer SM Gupta 1997 Environmental concerns and recycling/disassembly efforts in the electronic industry J Electron Manuf 7 1 1 22 10.1142/S0960313197000026 (Pubitemid 127665850)
    • (1997) Journal of Electronics Manufacturing , vol.7 , Issue.1 , pp. 1-22
    • Moyer, L.K.1    Gupta, S.M.2
  • 60
    • 0000192839 scopus 로고
    • An analysis of single item inventory systems with returns
    • 0462.90021 10.1002/nav.3800280207
    • J Muckstadt MH Isaac 1981 An analysis of single item inventory systems with returns Nav Res Logist Q 28 237 254 0462.90021 10.1002/nav.3800280207
    • (1981) Nav Res Logist Q , vol.28 , pp. 237-254
    • Muckstadt, J.1    Isaac, M.H.2
  • 63
    • 36248971592 scopus 로고    scopus 로고
    • Characteristics of the research on reverse logistics (1995-2005)
    • DOI 10.1080/00207540600943977, PII 770289122
    • S Rubio A Chamorro FJ Miranda 2008 Characteristics of the research on reverse logistics (1995-2005) Int J Prod Res 46 4 1099 1120 1160.90321 10.1080/00207540600943977 (Pubitemid 350136934)
    • (2008) International Journal of Production Research , vol.46 , Issue.4 , pp. 1099-1120
    • Rubio, S.1    Chamorro, A.2    Miranda, F.J.3
  • 64
    • 33846892242 scopus 로고    scopus 로고
    • Analysis of finite capacity discrete-time GI/Geo/1 queueing system with multiple vacations
    • DOI 10.1057/palgrave.jors.2602148, PII 2602148
    • SK Samanta UC Gupta RK Sharma 2007 Analysis of finite capacity discrete-time GI/Geo/1 queueing system with multiple vacations J Oper Res Soc 58 3 368 377 1125.90013 10.1057/palgrave.jors.2602148 (Pubitemid 46221054)
    • (2007) Journal of the Operational Research Society , vol.58 , Issue.3 , pp. 368-377
    • Samanta, S.K.1    Gupta, U.C.2    Sharma, R.K.3
  • 65
    • 66149177009 scopus 로고    scopus 로고
    • Analysis of a discrete-time GI/Geo/1 queue with single vacation
    • 2531995 1169.90347 10.1504/IJOR.2009.025198
    • SK Samanta 2009 Analysis of a discrete-time GI/Geo/1 queue with single vacation Int J Oper Res 5 3 292 310 2531995 1169.90347 10.1504/IJOR.2009.025198
    • (2009) Int J Oper Res , vol.5 , Issue.3 , pp. 292-310
    • Samanta, S.K.1
  • 66
    • 0029344199 scopus 로고
    • Heuristic algorithms for buffer allocation in a production line with unreliable machines
    • 0913.90146 10.1080/00207549508904794
    • D Seong SY Chang Y Hong 1995 Heuristic algorithms for buffer allocation in a production line with unreliable machines Int J Prod Res 33 7 1989 2005 0913.90146 10.1080/00207549508904794
    • (1995) Int J Prod Res , vol.33 , Issue.7 , pp. 1989-2005
    • Seong, D.1    Chang, S.Y.2    Hong, Y.3
  • 67
    • 42049099677 scopus 로고    scopus 로고
    • The analysis of a finite-buffer general input queue with batch arrival and exponential multiple vacations
    • 2380376 1135.90325 10.1504/IJOR.2008.016162
    • K Sikdar UC Gupta RK Sharma 2008 The analysis of a finite-buffer general input queue with batch arrival and exponential multiple vacations Int J Oper Res 3 1-2 219 234 2380376 1135.90325 10.1504/IJOR.2008.016162
    • (2008) Int J Oper Res , vol.3 , Issue.12 , pp. 219-234
    • Sikdar, K.1    Gupta, U.C.2    Sharma, R.K.3
  • 68
    • 0031144486 scopus 로고    scopus 로고
    • Buffer allocation for an integer nonlinear network design problem
    • PII S0305054896000688
    • AJ Singh JM Smith 1997 Buffer allocation for an integer nonlinear network design problem Comp Oper Res 24 5 453 472 1436963 0882.90051 10.1016/S0305-0548(96)00068-8 (Pubitemid 127706082)
    • (1997) Computers and Operations Research , vol.24 , Issue.5 , pp. 453-472
    • Singh, A.1    Smith, J.M.2
  • 69
    • 0023983194 scopus 로고
    • Buffer space allocation in automated assembly lines
    • JM Smith S Daskalaki 1988 Buffer space allocation in automated assembly lines Oper Res 36 2 343 358 10.1287/opre.36.2.343 (Pubitemid 18648497)
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 343-358
    • Smith J.MacGregor1    Daskalaki Sophia2
  • 70
    • 34249930491 scopus 로고    scopus 로고
    • Inventory control for a MARKOVIAN remanufacturing system with stochastic decomposition process
    • DOI 10.1016/j.ijpe.2006.12.023, PII S0925527306003355, Principles and practices of managing inventories Selected papers of the thirteenth international symposium on inventories
    • K Takahashi K Morikawa TD Myreshka A Mizuno 2007 Inventory control for a Markovian remanufacturing system with stochastic decomposition process Int J Prod Econ 108 416 425 10.1016/j.ijpe.2006.12.023 (Pubitemid 46880247)
    • (2007) International Journal of Production Economics , vol.108 , Issue.1-2 , pp. 416-425
    • Takahashi, K.1    Morikawa, K.2    Myreshka, T.D.3    Mizuno, A.4
  • 71
    • 0031119840 scopus 로고    scopus 로고
    • Disassembly of complex product structures with parts and materials commonality
    • 10.1080/095372897235316
    • KN Taleb SM Gupta L Brennan 1997 Disassembly of complex product structures with parts and materials commonality Prod Plan Control 8 255 269 10.1080/095372897235316
    • (1997) Prod Plan Control , vol.8 , pp. 255-269
    • Taleb, K.N.1    Gupta, S.M.2    Brennan, L.3
  • 72
    • 34249948238 scopus 로고    scopus 로고
    • Planned lead time determination in a make-to-order remanufacturing system
    • DOI 10.1016/j.ijpe.2006.12.034, PII S0925527306003367, Principles and practices of managing inventories Selected papers of the thirteenth international symposium on inventories
    • O Tang RW Grubbström S Zanoni 2007 Planned lead time determination in a make-to-order remanufacturing system Int J Prod Econ 108 426 435 10.1016/j.ijpe.2006.12.034 (Pubitemid 46880248)
    • (2007) International Journal of Production Economics , vol.108 , Issue.1-2 , pp. 426-435
    • Tang, O.1    Grubbstrom, R.W.2    Zanoni, S.3
  • 74
    • 0030205950 scopus 로고    scopus 로고
    • Product remanufacturing and disposal: A numerical comparison of alternative control strategies
    • DOI 10.1016/0925-5273(95)00137-9
    • E van der Laan R Dekker M Salomon 1996 Product remanufacturing and disposal: a numerical comparison of alternative control strategies Int J Prod Econ 45 489 498 10.1016/0925-5273(95)00137-9 (Pubitemid 126389453)
    • (1996) International Journal of Production Economics , vol.45 , Issue.1-3 , pp. 489-498
    • Van Der Laan, E.1    Dekker, R.2    Salomon, M.3
  • 76
    • 0032351556 scopus 로고    scopus 로고
    • Buffer allocation in unreliable production lines using a knowledge based system
    • 1042.90556 10.1016/S0305-0548(98)00034-3
    • GA Vouros HT Papadopoulos 1998 Buffer allocation in unreliable production lines using a knowledge based system Comp Oper Res 25 12 1055 1067 1042.90556 10.1016/S0305-0548(98)00034-3
    • (1998) Comp Oper Res , vol.25 , Issue.12 , pp. 1055-1067
    • Vouros, G.A.1    Papadopoulos, H.T.2
  • 77
    • 69249218859 scopus 로고    scopus 로고
    • Optimal management of the machine repair problem with working vacation: Newton's method
    • 2568538 1180.90098 10.1016/j.cam.2009.07.043
    • KH Wang WL Chen DY Yang 2009 Optimal management of the machine repair problem with working vacation: Newton's method J Comput Appl Math 233 2 449 458 2568538 1180.90098 10.1016/j.cam.2009.07.043
    • (2009) J Comput Appl Math , vol.233 , Issue.2 , pp. 449-458
    • Wang, K.H.1    Chen, W.L.2    Yang, D.Y.3
  • 78
    • 34548790696 scopus 로고    scopus 로고
    • Competitive strategy in remanufacturing and the impact of take-back laws
    • DOI 10.1016/j.jom.2007.01.014, PII S0272696307000174
    • S Webster S Mitra 2007 Competitive strategy in remanufacturing and the impact of take-back laws J Oper Manage 25 1123 1140 10.1016/j.jom.2007.01.014 (Pubitemid 47429824)
    • (2007) Journal of Operations Management , vol.25 , Issue.6 , pp. 1123-1140
    • Webster, S.1    Mitra, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.