|
Volumn 89, Issue 8, 2011, Pages 1229-1236
|
Capital costs and energy considerations of different alternative stripper configurations for post combustion CO2 capture
|
Author keywords
CO2 avoided cost; MEA; Stripper configurations; Total capture cost
|
Indexed keywords
AQUEOUS ABSORPTION;
AVOIDED COSTS;
CAPITAL COSTS;
CAPITAL INVESTMENT;
CHEMICAL PRODUCTION;
COMPRESSION EFFICIENCY;
COMPRESSION WORK;
CORROSION PROBLEMS;
COST CALCULATION;
ENERGY CONSIDERATIONS;
ESTIMATED PARAMETER;
HEAT INTEGRATION;
HEAT REQUIREMENTS;
IN-PIPE;
INLET TEMPERATURE;
INTEREST RATES;
INVESTMENT COSTS;
MATERIAL COST;
MEA;
POST-COMBUSTION;
PROCESS SIMULATIONS;
SINGLE CONFIGURATION;
STRIPPER CONFIGURATIONS;
TOTAL CAPTURE COST;
VAPOR RECOMPRESSION;
CHEMICAL PLANTS;
COSTS;
ENERGY EFFICIENCY;
ENERGY UTILIZATION;
GAS PLANTS;
GLOBAL WARMING;
GREENHOUSE GASES;
IMAGE COMPRESSION;
INVESTMENTS;
ORGANIC COMPOUNDS;
WATER CONTENT;
WATER INJECTION;
CARBON DIOXIDE;
|
EID: 79958766803
PISSN: 02638762
EISSN: None
Source Type: Journal
DOI: 10.1016/j.cherd.2011.03.005 Document Type: Article |
Times cited : (133)
|
References (15)
|