메뉴 건너뛰기




Volumn 43, Issue 9, 2011, Pages 633-646

Heuristics for component assignment problems based on the Birnbaum importance

Author keywords

Birnbaum importance; Component assignment problem; heuristics; invariant optimal design; statistical analysis

Indexed keywords

ASSIGNMENT PROBLEMS; BI-BASED; BIRNBAUM IMPORTANCE; DESIGN HEURISTICS; HEURISTICS; LARGE SYSTEM; NUMERICAL EXPERIMENTS; NUMERICAL RESULTS; NUMERICAL TESTING; OPTIMAL ARRANGEMENT; OPTIMAL DESIGN; RELATIVE CONTRIBUTION; SYSTEM RELIABILITY; TWO STAGE;

EID: 79958741439     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/0740817X.2010.532856     Document Type: Article
Times cited : (58)

References (25)
  • 1
    • 0029378982 scopus 로고
    • Joint reliability-importance of elements
    • Armstrong, M. J. (1995) Joint reliability-importance of elements. IEEE Transactions on Reliability, 44, 408-412.
    • (1995) IEEE Transactions on Reliability , vol.44 , pp. 408-412
    • Armstrong, M.J.1
  • 2
    • 70350572885 scopus 로고    scopus 로고
    • On the use of uncertainty importance measures in reliability and risk analysis
    • Aven, T. and Nokland, T. E. (2010) On the use of uncertainty importance measures in reliability and risk analysis. Reliability Engineering & System Safety, 95, 127-133.
    • (2010) Reliability Engineering & System Safety , vol.95 , pp. 127-133
    • Aven, T.1    Nokland, T.E.2
  • 3
    • 0347603323 scopus 로고    scopus 로고
    • Importance measures for noncoherent system analysis
    • Beeson, S. and Andrews, J. D. (2003) Importance measures for noncoherent system analysis. IEEE Transactions on Reliability, 52, 301-310.
    • (2003) IEEE Transactions on Reliability , vol.52 , pp. 301-310
    • Beeson, S.1    Andrews, J.D.2
  • 4
    • 0001162212 scopus 로고
    • On the importance of different components in a multicomponent system
    • Krishnaiah, P. R. ed, Academic Press, New York, NY
    • Birnbaum, Z. W. (1969) On the importance of different components in a multicomponent system, in Multivariate Analysis, Volume 2, Krishnaiah, P. R. (ed), Academic Press, New York, NY, 581-592.
    • (1969) Multivariate Analysis , vol.2 , pp. 581-592
    • Birnbaum, Z.W.1
  • 6
    • 84989674615 scopus 로고
    • Optimal arrangement of components via pairwise rearrangements
    • Boland, P. J., Proschan, F. and Tong, Y. L. (1989) Optimal arrangement of components via pairwise rearrangements. Naval Research Logistics, 36, 807-815.
    • (1989) Naval Research Logistics , vol.36 , pp. 807-815
    • Boland, P.J.1    Proschan, F.2    Tong, Y.L.3
  • 7
    • 75149195178 scopus 로고    scopus 로고
    • The reliability importance of components and prime implicants in coherent and non-coherent systems including total-order interactions
    • Borgonovo, E. (2010) The reliability importance of components and prime implicants in coherent and non-coherent systems including total-order interactions. European Journal of Operational Research, 204, 485-495.
    • (2010) European Journal of Operational Research , vol.204 , pp. 485-495
    • Borgonovo, E.1
  • 8
    • 0035341687 scopus 로고    scopus 로고
    • A new importance measure for risk-informed decision making
    • DOI 10.1016/S0951-8320(00)00108-3, PII S0951832000001083
    • Borgonovo, E. and Apostolakis, G. E. (2001) A new importance measure for risk informed decision-making. Reliability Engineering & System Safety, 72, 193-212. (Pubitemid 32334938)
    • (2001) Reliability Engineering and System Safety , vol.72 , Issue.2 , pp. 193-212
    • Borgonovo, E.1    Apostolakis, G.E.2
  • 9
    • 41449114468 scopus 로고    scopus 로고
    • Identifying optimal components in a reliability system
    • DOI 10.1109/TR.2008.916888
    • Freixas, J. and Pons, M. (2008) Identifying optimal components in a reliability system. IEEE Transactions on Reliability, 57, 163-170. (Pubitemid 351454300)
    • (2008) IEEE Transactions on Reliability , vol.57 , Issue.1 , pp. 163-170
    • Freixas, J.1    Pons, M.2
  • 10
    • 33845866377 scopus 로고    scopus 로고
    • Element substitution algorithm for general two-terminal network reliability analyses
    • DOI 10.1080/07408170600735579, PII W501002P6623U25G
    • Gebre, B. A. and Ramirez-Marques, J. E. (2007) Element substitution algorithm for general two-terminal network reliability analyses. IIE Transactions, 39, 265-275. (Pubitemid 46024140)
    • (2007) IIE Transactions (Institute of Industrial Engineers) , vol.39 , Issue.3 , pp. 265-275
    • Gebre, B.A.1    Ramirez-Marquez, J.E.2
  • 11
    • 0018479620 scopus 로고
    • OPTIMUM LINK ALLOCATION OF FIXED TOPOLOGY NETWORKS
    • Kontoleon, J. M. (1979) Optimal link allocation of fixed topology networks. IEEE Transactions on Reliability, 28, 145-147. (Pubitemid 9474980)
    • (1979) IEEE Trans Reliab , vol.R-28 , Issue.2 , pp. 145-147
    • Kontoleon, J.M.1
  • 13
    • 0025445513 scopus 로고
    • Consecutive-k-out-of-n:G system: The mirror image of a consecutive-k-out-of-n:F system
    • DOI 10.1109/24.55888
    • Kuo, W., Zhang, W. and Zuo, M. J. (1990) A consecutive-k-out-of-n:G system: the mirror image of a consecutive-k-out-of-n:F system. IEEE Transactions on Reliability, 39, 244-253. (Pubitemid 20714198)
    • (1990) IEEE Transactions on Reliability , vol.39 , Issue.2 , pp. 244-253
    • Kuo Way1    Zhang Weixing2    Zuo Mingjian3
  • 15
    • 0036496398 scopus 로고    scopus 로고
    • Reliability importance and invariant optimal allocation
    • DOI 10.1023/A:1017908523107
    • Lin, F. H. and Kuo, W. (2002) Reliability importance and invariant optimal allocation. Journal of Heuristics, 8, 155-171. (Pubitemid 34249456)
    • (2002) Journal of Heuristics , vol.8 , Issue.2 , pp. 155-171
    • Lin, F.-H.1    Kuo, W.2
  • 16
    • 34548609952 scopus 로고    scopus 로고
    • Joint failure importance for noncoherent fault trees
    • DOI 10.1109/TR.2007.898574
    • Lu, L. and Jiang, J. (2007) Joint failure importance for noncoherent fault trees. IEEE Transactions on Reliability, 56, 435-443. (Pubitemid 47399752)
    • (2007) IEEE Transactions on Reliability , vol.56 , Issue.3 , pp. 435-443
    • Lu, L.1    Jiang, J.2
  • 17
    • 0021626405 scopus 로고
    • Optimal consecutive-2-out-of-n:F component sequencing
    • Malon, D. (1984) Optimal consecutive-2-out-of-n:F component sequencing. IEEE Transactions on Reliability, 33, 414-418.
    • (1984) IEEE Transactions on Reliability , vol.33 , pp. 414-418
    • Malon, D.1
  • 18
    • 0034260091 scopus 로고    scopus 로고
    • Reliability optimization of coherent systems
    • DOI 10.1109/24.914551, PII S0018952900117592
    • Prasad, V. R. and Kuo, W. (2000) Reliability optimization of coherent systems. IEEE Transactions on Reliability, 49, 323-330. (Pubitemid 32990736)
    • (2000) IEEE Transactions on Reliability , vol.49 , Issue.3 , pp. 323-330
    • Rajendra Prasad, V.1    Kuo, W.2
  • 19
    • 0035369906 scopus 로고    scopus 로고
    • An overview of PSA importance measures
    • DOI 10.1016/S0951-8320(01)00007-2, PII S0951832001000072
    • Van der Borst, M. and Schoonakker, H. (2001) An overview of PSA importance measures. Reliability Engineering & System Safety, 72, 241-245. (Pubitemid 32498383)
    • (2001) Reliability Engineering and System Safety , vol.72 , Issue.3 , pp. 241-245
    • Van Der Borst, M.1    Schoonakker, H.2
  • 20
    • 0242400432 scopus 로고    scopus 로고
    • ON the increase of the expected lifetime by parallel redundancy
    • Xie, M. and Lai, C. D. (1996) On the increase of the expected lifetime by parallel redundancy. Asia-Pacific Journal of Operational Research, 13, 171-179. (Pubitemid 126645529)
    • (1996) Asia-Pacific Journal of Operational Research , vol.13 , Issue.2 , pp. 171-179
    • Xie, M.1    Lai, C.-D.2
  • 21
    • 0024864781 scopus 로고
    • On ranking of system components with respect to different improvement actions
    • Xie, M. and Shen, K. (1989) On ranking of system components with respect to different improvement actions. Microelectronics Reliability, 29, 159-164.
    • (1989) Microelectronics Reliability , vol.29 , pp. 159-164
    • Xie, M.1    Shen, K.2
  • 22
    • 51449105219 scopus 로고    scopus 로고
    • Comments on "a hierarchy of importance indices."
    • Zhu, X. and Kuo, W. (2008) Comments on "A Hierarchy of Importance Indices." IEEE Transactions on Reliability, 57, 529-531.
    • (2008) IEEE Transactions on Reliability , vol.57 , pp. 529-531
    • Zhu, X.1    Kuo, W.2
  • 23
    • 79958757976 scopus 로고    scopus 로고
    • Patterns of the Birnbaum importance in linear consecutive-k-out-of-n systems
    • in press
    • Zhu, X., Yao, Q. and Kuo, W. (2010) Patterns of the Birnbaum importance in linear consecutive-k-out-of-n systems. IIE Transactions, in press.
    • (2010) IIE Transactions
    • Zhu, X.1    Yao, Q.2    Kuo, W.3
  • 24
    • 0025406319 scopus 로고
    • Design and performance analysis of consecutive-k-out-of-n structure
    • Zuo, M. J. and Kuo, W. (1990) Design and performance analysis of consecutive-k-out-of-n structure. Naval Research Logistics, 37, 203-230. (Pubitemid 21734743)
    • (1990) Naval Research Logistics , vol.37 , Issue.2 , pp. 203-230
    • Zuo Mingjian1    Kuo Way2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.