메뉴 건너뛰기




Volumn 19, Issue 3, 2011, Pages 537-552

A comparative study for estimating software development effort intervals

Author keywords

Classification; Cluster analysis; Interval prediction; Machine learning; Software effort estimation

Indexed keywords

CLASSIFICATION (OF INFORMATION); CLUSTER ANALYSIS; ESTIMATION; LEARNING SYSTEMS; OBJECT ORIENTED PROGRAMMING; SOFTWARE DESIGN;

EID: 79958253428     PISSN: 09639314     EISSN: 15731367     Source Type: Journal    
DOI: 10.1007/s11219-010-9112-9     Document Type: Article
Times cited : (16)

References (34)
  • 2
    • 0034156542 scopus 로고    scopus 로고
    • A simulation tool for efficient analogy based cost estimation
    • Angelis, L., & Stamelos, I. (2000). A simulation tool for efficient analogy based cost estimation. Journal of Empirical Software Engineering, 5(1), 35-68.
    • (2000) Journal of Empirical Software Engineering , vol.5 , Issue.1 , pp. 35-68
    • Angelis, L.1    Stamelos, I.2
  • 11
  • 15
    • 0036891797 scopus 로고    scopus 로고
    • Comments on 'a simulation tool for efficient analogy based cost estimation
    • Jorgensen, M. (2002). Comments on 'a simulation tool for efficient analogy based cost estimation'. Empirical Software Engineering, 7, 375-376.
    • (2002) Empirical Software Engineering , vol.7 , pp. 375-376
    • Jorgensen, M.1
  • 16
    • 0037349232 scopus 로고    scopus 로고
    • An effort prediction interval approach based on the empirical distribution of previous estimation accuracy
    • Jorgensen, M. (2003). An effort prediction interval approach based on the empirical distribution of previous estimation accuracy. Information and Software Technology, 45, 123-126.
    • (2003) Information and Software Technology , vol.45 , pp. 123-126
    • Jorgensen, M.1
  • 17
    • 0347709781 scopus 로고    scopus 로고
    • Uncertainty intervals versus interval uncertainty: An alternative method for eliciting effort prediction intervals in software development projects
    • Singapore
    • Jorgensen, M., & Teigen, K. H. (2002). Uncertainty intervals versus interval uncertainty: An alternative method for eliciting effort prediction intervals in software development projects. In International conference on project management (ProMAC), Singapore, pp. 343-352.
    • (2002) International conference on project management (ProMAC) , pp. 343-352
    • Jorgensen, M.1    Teigen, K.H.2
  • 18
    • 0032486712 scopus 로고    scopus 로고
    • Software development cost estimation: Integrating neural network with cluster analysis
    • Lee, A., Cheng, C. H., & Balakrishnan, J. (1998). Software development cost estimation: Integrating neural network with cluster analysis. Information and Management, 34, 1-9.
    • (1998) Information and Management , vol.34 , pp. 1-9
    • Lee, A.1    Cheng, C.H.2    Balakrishnan, J.3
  • 21
    • 85008035390 scopus 로고    scopus 로고
    • Evidence-based cost estimation for better-quality software
    • Menzies, T., & Hihn, J. (2006). Evidence-based cost estimation for better-quality software. IEEE Software, 23(4), 64-66.
    • (2006) IEEE Software , vol.23 , Issue.4 , pp. 64-66
    • Menzies, T.1    Hihn, J.2
  • 23
    • 0003683984 scopus 로고
    • Goddard Space Flight Center, Greenbelt, MD, NASA Software Engineering Laboratory
    • NASA. (1990). Manager's handbook for software development. Goddard Space Flight Center, Greenbelt, MD, NASA Software Engineering Laboratory.
    • (1990) Manager's handbook for software development
  • 25
  • 29
    • 84876665464 scopus 로고    scopus 로고
    • SoftLab. Software research laboratory, Department of Computer Engineering, Bogazici University
    • SoftLab. (2009). Software research laboratory, Department of Computer Engineering, Bogazici University. http://www. softlab. boun. edu. tr.
    • (2009)
  • 30
    • 0029255026 scopus 로고
    • Machine learning approaches to estimating software development effort
    • Srinivasan, K., & Fisher, D. (1995). Machine learning approaches to estimating software development effort. IEEE Transactions on Software Engineering, 21(2), 126-137.
    • (1995) IEEE Transactions on Software Engineering , vol.21 , Issue.2 , pp. 126-137
    • Srinivasan, K.1    Fisher, D.2
  • 31
    • 0035889328 scopus 로고    scopus 로고
    • Managing uncertainty in project portfolio cost estimation
    • Stamelos, I., & Angelis, L. (2001). Managing uncertainty in project portfolio cost estimation. Information and Software Technology, 43(13), 759-768.
    • (2001) Information and Software Technology , vol.43 , Issue.13 , pp. 759-768
    • Stamelos, I.1    Angelis, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.