-
1
-
-
79956094592
-
-
M.Sc. thesis, Faculty of Engineering, Cairo Univ., Giza, Egypt
-
Abdel-Raheem, M. (2007). Cash management: A computer-based framework for maximizing profit using evolutionary algorithms.. M.Sc. thesis, Faculty of Engineering, Cairo Univ., Giza, Egypt.
-
(2007)
Cash Management: A Computer-based Framework for Maximizing Profit Using Evolutionary Algorithms
-
-
Abdel-Raheem, M.1
-
3
-
-
11244351432
-
A general ant colony model to solve combinatorial optimization problems
-
Aguilar, J. (2004). A general ant colony model to solve combinatorial optimization problems.. Columbian J. Comput., 2 (1), 7-18.
-
(2004)
Columbian J. Comput.
, vol.2
, Issue.1
, pp. 7-18
-
-
Aguilar, J.1
-
4
-
-
80053398528
-
Scheduling construction activities using ant colony optimization
-
Civil-ComPress, Stirling, Scotland
-
Christodoulou, S. (2005). Scheduling construction activities using ant colony optimization.. Proc. of the Tenth Int. Conf. on Civil, Structural, and Environmental Engineering Computing, Civil-Comp Press, Stirling, Scotland, 1-12.
-
(2005)
Proc. of the Tenth Int. Conf. on Civil, Structural, and Environmental Engineering Computing
, pp. 1-12
-
-
Christodoulou, S.1
-
5
-
-
1842611240
-
-
MIT Press, Cambridge, MA
-
Dorigo, M., and Stutzle, T. (2004). Ant colony optimization, MIT Press, Cambridge, MA.
-
(2004)
Ant Colony Optimization
-
-
Dorigo, M.1
Stutzle, T.2
-
6
-
-
15944391749
-
Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
-
DOI 10.1061/(ASCE)0733-9364(2005)131:4(400)
-
Elazouni, A. M., and Metwally, G. (2005). Finance-based scheduling: tool to maximize project profit using improved genetic algorithms.. J. Constr. Eng. Manage. 0733-9364, 131 (4), 400-412. 10.1061/(ASCE)0733-9364(2005)131:4(400) (Pubitemid 40430136)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.4
, pp. 400-412
-
-
Elazouni, A.M.1
Metwally, F.G.2
-
7
-
-
22344432656
-
Comparison among five evolutionary-based optimization algorithms
-
Elsevier
-
Elbeltagi, E., Hegazy, T., and Grierson, D. (2005). Comparison among five evolutionary-based optimization algorithms.. Advanced engineering informatics, Elsevier, 43-55.
-
(2005)
Advanced Engineering Informatics
, pp. 43-55
-
-
Elbeltagi, E.1
Hegazy, T.2
Grierson, D.3
-
8
-
-
15944361924
-
Time-cost-quality trade-off analysis for highway construction
-
DOI 10.1061/(ASCE)0733-9364(2005)131:4(477)
-
El-Rayes, K., and Kandil, A. (2005). Time-cost-quality trade-off analysis for highway construction.. J. Constr. Eng. Manage. 0733-9364, 131 (4), 477-486. 10.1061/(ASCE)0733-9364(2005)131:4(477) (Pubitemid 40430144)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.4
, pp. 477-486
-
-
El-Rayes, K.1
Kandil, A.2
-
9
-
-
33244474874
-
Shuffled frog-leaping algorithm: A memetic meta-heuristic for discrete optimization
-
DOI 10.1080/03052150500384759, PII R65340053330467
-
Eusuff, M., Lansey, K., and Pasha, F. (2006). Shuffled frog-leaping algorithm: A memetic meta-heuristic for discrete optimization.. Eng. Optim. 0305-215X, 38 (2), 129-154. 10.1080/03052150500384759 (Pubitemid 43279596)
-
(2006)
Engineering Optimization
, vol.38
, Issue.2
, pp. 129-154
-
-
Eusuff, M.1
Lansey, K.2
Pasha, F.3
-
10
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng, C. W., Liu, L., and Burns, S. (1997). Using genetic algorithms to solve construction time-cost trade-off problems.. J. Comput. Civ. Eng. 0887-3801, 11 (3), 184-189. 10.1061/(ASCE)0887-3801(1997)11:3(184) (Pubitemid 127590539)
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.-W.1
Liu, L.2
Burns, S.A.3
-
12
-
-
0032654594
-
Genetic algorithms application and testing for equipment selection
-
0733-9364, , 10.1061/(ASCE)0733-9364(1999)125:1(32)
-
Haidar, A., Naoum, S., Howes, R., and Tah, J. (1999). Genetic algorithms application and testing for equipment selection.. J. Constr. Eng. Manage. 0733-9364, 125 (1), 32-40. 10.1061/(ASCE)0733-9364(1999)125:1(32)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 32-40
-
-
Haidar, A.1
Naoum, S.2
Howes, R.3
Tah, J.4
-
13
-
-
0035509424
-
Simplified spreadsheet solutions. II: Overall schedule optimization
-
DOI 10.1061/(ASCE)0733-9364(2001)127:6(469), Reportnr 22158
-
Hegazy, T., and Ersahin, T. (2001). Simplified spreadsheet solutions. II: Overall schedule optimization.. J. Constr. Eng. Manage. 0733-9364, 127 (6), 469-475. 10.1061/(ASCE)0733-9364(2001)127:6(469) (Pubitemid 33137751)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.6
, pp. 469-475
-
-
Hegazy, T.1
Ersahin, T.2
-
14
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
DOI 10.1061/(ASCE)0733-9364(2001)127:3(183), Reportnr 22131
-
Hegazy, T., and Wassef, N. (2001). Cost optimization in projects with repetitive nonserial activities.. J. Constr. Eng. Manage. 0733-9364, 127 (3), 183-191. (Pubitemid 32508536)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.3
, pp. 183-191
-
-
Hegazy, T.1
Wassef, N.2
-
16
-
-
33646737223
-
Minimizing construction-related hazards in airport expansion projects
-
0733-9364, , 10.1061/(ASCE)0733-9364(2006)132:6(562)
-
Khalafallah, A., and El-Rayes, K. (2006). Minimizing construction-related hazards in airport expansion projects.. J. Constr. Eng. Manage. 0733-9364, 132 (6), 562-572. 10.1061/(ASCE)0733-9364(2006)132:6(562)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.6
, pp. 562-572
-
-
Khalafallah, A.1
El-Rayes, K.2
-
17
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
-
Leu, S. S., and Yang, C. H. (1999). GA-Based multicriteria optimal model for construction scheduling.. J. Constr. Eng. Manage. 0733-9364, 125 (6), 420-427. 10.1061/(ASCE)0733-9364(1999)125:6(420) (Pubitemid 30509596)
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.-S.1
Yang, C.-H.2
-
18
-
-
9144263820
-
Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling
-
DOI 10.1061/(ASCE)0733-9364(2002)128:5(438)
-
Lu, M. (2002). Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling.. J. Constr. Eng. Manage. 0733-9364, 128 (5), 438-445. 10.1061/(ASCE)0733-9364(2002)128: 5(438) (Pubitemid 40265528)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.5
, pp. 438-445
-
-
Lu, M.1
-
19
-
-
0038363689
-
Ant colony optimization for design of water distribution systems
-
DOI 10.1061/(ASCE)0733-9496(2003)129:3(200)
-
Maier, H. R., (2003). Ant colony optimization for design of water distribution systems.. J. Water Resour. Plann. Manage. 0733-9496, 129 (3), 200-209. 10.1061/(ASCE)0733-9496(2003)129:3(200) (Pubitemid 36562715)
-
(2003)
Journal of Water Resources Planning and Management
, vol.129
, Issue.3
, pp. 200-209
-
-
Maier, H.R.1
Simpson, A.R.2
Zecchin, A.C.3
Foong, W.K.4
Phang, K.Y.5
Seah, H.Y.6
Tan, C.L.7
-
20
-
-
0003603223
-
-
C3P Report 826, California Institute of Technology, Pasadena, CA
-
Moscato, P. (1989). On evolution, search, optimization, genetic algorithms and martial arts: Towards memetic algorithms, Caltech concurrent computation program.. C3P Report 826, California Institute of Technology, Pasadena, CA.
-
(1989)
On Evolution, Search, Optimization, Genetic Algorithms and Martial Arts: Towards Memetic Algorithms, Caltech Concurrent Computation Program
-
-
Moscato, P.1
-
21
-
-
4444318428
-
An ant colony optimization algorithm for the minimum weight vertex cover problem
-
DOI 10.1023/B:ANOR.0000039523.95673.33, Meta-Heuristics - Theory, Applications and Software
-
Shyu, S. J., Yin, P., and Lin, B. M. T. (2004). An ant colony optimization algorithm for the minimum weight vertex cover problem.. Ann. Oper. Res. 0254-5330, 131, 283-304. 10.1023/B:ANOR.0000039523.95673.33 (Pubitemid 39187384)
-
(2004)
Annals of Operations Research
, vol.131
, Issue.1-4
, pp. 283-304
-
-
Shyu, S.J.1
Yin, P.-Y.2
Lin, B.M.T.3
-
22
-
-
2342465539
-
Ant colony optimization algorithm to the inter-cell layout problem in cellular manufacturing
-
0377-2217, , 10.1016/S0377-2217(03)00248-0
-
Solimanpur, M., Vart, P., and Shankar, R. (2004). Ant colony optimization algorithm to the inter-cell layout problem in cellular manufacturing.. Eur. J. Oper. Res. 0377-2217, 157 (3), 592-606. 10.1016/S0377-2217(03)00248-0
-
(2004)
Eur. J. Oper. Res.
, vol.157
, Issue.3
, pp. 592-606
-
-
Solimanpur, M.1
Vart, P.2
Shankar, R.3
-
24
-
-
0032241648
-
Introduction to special issues: Variable-length representation and noncoding segments for evolutionary algorithms
-
Wu, S. A., and Banzhaf, W. (1998). Introduction to special issues: Variable-length representation and noncoding segments for evolutionary algorithms.. Evolutionary Comp., 6 (4), iii-v.
-
(1998)
Evolutionary Comp.
, vol.6
, Issue.4
-
-
Wu, S.A.1
Banzhaf, W.2
-
25
-
-
12344265028
-
Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
-
DOI 10.1061/(ASCE)0733-9364(2005)131:1(81)
-
Zehng, D. X. M., Ng, S., and Kumaraswamy, M. M. (2005). Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization.. J. Constr. Eng. Manage. 0733-9364, 131 (1), 81-91. 10.1061/(ASCE)0733-9364(2005)131:1(81) (Pubitemid 40135235)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.1
, pp. 81-91
-
-
Zheng, D.X.M.1
Ng, S.T.2
Kumaraswamy, M.M.3
|