메뉴 건너뛰기




Volumn , Issue , 2011, Pages 133-138

The impact of wind power variability and curtailment on ramping requirements

Author keywords

day ahead market; load following; non peaking unit; peaking unit; ramping; wind curtailment; wind integration

Indexed keywords

DAY AHEAD MARKET; LOAD FOLLOWING; NON-PEAKING UNIT; PEAKING UNIT; RAMPING; WIND INTEGRATION;

EID: 79957557303     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/TDC-LA.2010.5762873     Document Type: Conference Paper
Times cited : (14)

References (10)
  • 1
    • 79957561462 scopus 로고    scopus 로고
    • Assessing the Yearly Impact of Wind Power Through a New Hybrid Deterministic/Stochastic Unit Commitment
    • vol. PP
    • J. F. Restrepo, and F. D. Galiana, "Assessing the Yearly Impact of Wind Power Through a New Hybrid Deterministic/Stochastic Unit Commitment," Power Systems, IEEE Transactions on, vol. PP, no. 99, pp. 1-1.
    • Power Systems, IEEE Transactions on , Issue.99 , pp. 1-1
    • Restrepo, J.F.1    Galiana, F.D.2
  • 2
    • 84889498628 scopus 로고    scopus 로고
    • Chichester, West Sussex, England ; Hoboken, NJ: John Wiley
    • T. Ackermann, Wind power in power systems, Chichester, West Sussex, England ; Hoboken, NJ: John Wiley, 2005.
    • (2005) Wind Power in Power Systems
    • Ackermann, T.1
  • 4
    • 67650082529 scopus 로고    scopus 로고
    • Using standard deviation as a measure of increased operational reserve requirement for wind power
    • H. Holttinen, M. Milligan, B. Kirby et al., "Using standard deviation as a measure of increased operational reserve requirement for wind power," Wind Engineering, vol. 32, no. 4, pp. 355-378, 2008.
    • (2008) Wind Engineering , vol.32 , Issue.4 , pp. 355-378
    • Holttinen, H.1    Milligan, M.2    Kirby, B.3
  • 7
    • 0033382927 scopus 로고    scopus 로고
    • Separating and measuring the regulation and load-following ancillary services
    • E. Hirst, and B. Kirby, "Separating and measuring the regulation and load-following ancillary services," Utilities Policy, vol. 8, no. 2, pp. 75-81, 1999.
    • (1999) Utilities Policy , vol.8 , Issue.2 , pp. 75-81
    • Hirst, E.1    Kirby, B.2
  • 8
    • 79957555434 scopus 로고    scopus 로고
    • A Method and Case Study for Estimating the Ramping Capability of a Control Area or Balancing Authority and Implications for Moderate or High Wind Penetration
    • B. Kirby, and M. Milligan, "A Method and Case Study for Estimating the Ramping Capability of a Control Area or Balancing Authority and Implications for Moderate or High Wind Penetration " in WINDPOWER 2005, Denver, Colorado, 2005.
    • WINDPOWER 2005, Denver, Colorado, 2005
    • Kirby, B.1    Milligan, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.