메뉴 건너뛰기




Volumn , Issue , 2011, Pages 575-580

An AHP multiple criteria model applied to transmission expansion of a Brazilian southeastern utility

Author keywords

Decision support systems; Power system reliability; Power transmission economics; Power transmission lines; Power transmission planning; Resource management; Risk analysis; Substations

Indexed keywords

POWER SYSTEM RELIABILITY; POWER TRANSMISSION ECONOMICS; POWER TRANSMISSION LINES; POWER TRANSMISSION PLANNING; RESOURCE MANAGEMENT; SUBSTATIONS;

EID: 79957550018     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/TDC-LA.2010.5762940     Document Type: Conference Paper
Times cited : (6)

References (13)
  • 12
    • 79957564297 scopus 로고    scopus 로고
    • Transmissão de energia elétrica terá investimentos de R$ 3 bilhões até 2013
    • EPE - Empresa de Pesquisa Energética.
    • EPE - Empresa de Pesquisa Energética. "Transmissão de energia elétrica terá investimentos de R$ 3 bilhões até 2013". Informe à Impressa - PET 2009-2013. Rio de Janeiro, Setemberr, 2009.
    • Informe À Impressa - PET 2009-2013. Rio de Janeiro, Setemberr, 2009


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.