Nondominated archiving multicolony ant algorithm in time-cost tradeoff optimization
-
A. Afshar, A.K. Ziaraty, A. Kaveh, and F. Sharifi Nondominated archiving multicolony ant algorithm in time-cost tradeoff optimization Journal of Construction Engineering and Management 135 7 2009 668 674
-
(2009)
Journal of Construction Engineering and Management
, vol.135
, Issue.7
, pp. 668-674
-
-
Afshar, A.1
Ziaraty, A.K.2
Kaveh, A.3
Sharifi, F.4
-
3
-
-
34047092353
-
A parameter-free self-adapting boundary genetic search for pipe network optimization
-
DOI 10.1007/s10589-007-9016-1
-
M.H. Afshar, and M.A. Mariño A parameter-free self adapting boundary genetic search for pipe network optimization Computer Optimization and Applications 37 2007 83 102 (Pubitemid 46516450)
-
(2007)
Computational Optimization and Applications
, vol.37
, Issue.1
, pp. 83-102
-
-
Afshar, M.H.1
Marino, M.A.2
-
4
-
-
33947217417
-
Software project management with GAs
-
DOI 10.1016/j.ins.2006.12.020, PII S0020025507000175
-
E. Alba, and J.F. Chicano Software project management with GAs Information Sciences 177 2007 2380 2401 (Pubitemid 46435498)
-
(2007)
Information Sciences
, vol.177
, Issue.11
, pp. 2380-2401
-
-
Alba, E.1
Francisco Chicano, J.2
-
5
-
-
26044472796
-
A genetic algorithm approach for the time-cost trade-off in PERT networks
-
DOI 10.1016/j.amc.2004.10.021, PII S0096300304007040
-
A. Azaron, C. Perkgoz, and M. Sakawa A genetic algorithm approach for the time-cost tradeoff in PERT networks Applied Mathematics and Computation 168 2005 1317 1339 (Pubitemid 41405681)
-
(2005)
Applied Mathematics and Computation
, vol.168
, Issue.2
, pp. 1317-1339
-
-
Azaron, A.1
Perkgoz, C.2
Sakawa, M.3
-
7
-
-
43049173388
-
An effective ant colony optimization algorithm for multi-objective resource allocation problem
-
S.K. Chaharsooghi, and A.H.M. Kermani An effective ant colony optimization algorithm for multi-objective resource allocation problem Applied Mathematics and Computation 200 2008 167 177
-
(2008)
Applied Mathematics and Computation
, vol.200
, pp. 167-177
-
-
Chaharsooghi, S.K.1
Kermani, A.H.M.2
-
11
-
-
2642577642
-
A two-stage dynamic model on allocation of construction facilities with genetic algorithm
-
K.W. Chau A two-stage dynamic model on allocation of construction facilities with genetic algorithm Automation in Construction 13 2004 481 490
-
(2004)
Automation in Construction
, vol.13
, pp. 481-490
-
-
Chau, K.W.1
-
12
-
-
63549109485
-
A two-phase GA model for resource-constrained project scheduling
-
P.-H. Chen, and H. Weng A two-phase GA model for resource-constrained project scheduling Automation in Construction 18 2009 485 498
-
(2009)
Automation in Construction
, vol.18
, pp. 485-498
-
-
Chen, P.-H.1
Weng, H.2
-
13
-
-
57649199673
-
Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model
-
M.-Y. Cheng, H.-C. Tsai, and W.-S. Hsieh Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model Automation in Construction 18 2009 164 172
-
(2009)
Automation in Construction
, vol.18
, pp. 164-172
-
-
Cheng, M.-Y.1
Tsai, H.-C.2
Hsieh, W.-S.3
-
14
-
-
0036028136
-
Site pre-cast yard layout arrangement through genetic algorithms
-
DOI 10.1016/S0926-5805(01)00044-9, PII S0926580501000449
-
S.-O. Cheung, T.K.-L. Tong, and C.-M. Tam Site precast yard layout arrangement through genetic algorithm Automation in Construction 11 2002 35 46 (Pubitemid 32833464)
-
(2002)
Automation in Construction
, vol.11
, Issue.1
, pp. 35-46
-
-
Cheung, S.-O.1
Tong, T.K.-L.2
Tam, C.-M.3
-
15
-
-
58949090464
-
Construction imitating ants: Resource-unconstrained scheduling with artificial ants
-
S. Christodoulou Construction imitating ants: Resource-unconstrained scheduling with artificial ants Automation in Construction 18 2009 285 293
-
(2009)
Automation in Construction
, vol.18
, pp. 285-293
-
-
Christodoulou, S.1
-
16
-
-
0037845174
-
Optimal testing-resource allocation with genetic algorithm for modular software systems
-
Y.S. Dai, M. Xie, K.L. Poh, and B. Yang Optimal testing-resource allocation with genetic algorithm for modular software systems The Journal of Systems and Software 66 2003 47 55
-
(2003)
The Journal of Systems and Software
, vol.66
, pp. 47-55
-
-
Dai, Y.S.1
Xie, M.2
Poh, K.L.3
Yang, B.4
-
17
-
-
55849085727
-
A multi-objective evolutionary algorithm to exploit the similarities of resource allocation problems
-
D. Datta, C.M. Fonseca, and K. Deb A multi-objective evolutionary algorithm to exploit the similarities of resource allocation problems Journal of Scheduling 11 2008 405 419
-
(2008)
Journal of Scheduling
, vol.11
, pp. 405-419
-
-
Datta, D.1
Fonseca, C.M.2
Deb, K.3
-
18
-
-
0035612932
-
A two stage search heuristic for scheduling payments in projects
-
N. Dayanand, and R. Padman A two stage search heuristic for scheduling payments in projects Annals of Operations Research 102 2001 197 220
-
(2001)
Annals of Operations Research
, vol.102
, pp. 197-220
-
-
Dayanand, N.1
Padman, R.2
-
19
-
-
0033729054
-
An efficient constraint handling method for genetic algorithms
-
K. Deb An efficient constraint handling method for genetic algorithms Computer Methods in Applied Mechanics and Engineering 186 2000 311 338
-
(2000)
Computer Methods in Applied Mechanics and Engineering
, vol.186
, pp. 311-338
-
-
Deb, K.1
-
20
-
-
0036530772
-
A fast and elitist multiobjective genetic algorithm: NSGA-II
-
DOI 10.1109/4235.996017, PII S1089778X02041012
-
K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan A fast and elitist multiobjective genetic algorithm: NSGA-II IEEE Transactions on Evolutionary Computation 6 2002 182 197 (Pubitemid 34555372)
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
21
-
-
77955569892
-
Improved ant colony optimization algorithms for determining project critical paths
-
Q. Duan, and T.W. Liao Improved ant colony optimization algorithms for determining project critical paths Automation in Construction 19 2010 676 693
-
(2010)
Automation in Construction
, vol.19
, pp. 676-693
-
-
Duan, Q.1
Liao, T.W.2
-
22
-
-
48249115605
-
A modified shuffled frog-leaping optimization algorithm: Applications to project management
-
E. Elbeltagi, T. Hegazy, and D. Grierson A modified shuffled frog-leaping optimization algorithm: applications to project management Structure and Infrastructure Engineering 3 1 2007 53 60
-
(2007)
Structure and Infrastructure Engineering
, vol.3
, Issue.1
, pp. 53-60
-
-
Elbeltagi, E.1
Hegazy, T.2
Grierson, D.3
-
24
-
-
0030784381
-
Scheduling projects to maximize net present value - The case of time-dependent, contingent cash flows
-
R. Etgar, A. Shtub, and L.J. LeBlanc Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows European Journal of Operational Research 96 1996 90 96 (Pubitemid 127415911)
-
(1997)
European Journal of Operational Research
, vol.96
, Issue.1
, pp. 90-96
-
-
Etgar, R.1
Shtub, A.2
Leblanc, L.J.3
-
25
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
C.-W. Feng, L. Liu, and S.A. Burns Using genetic algorithms to solve construction time-cost tradeoff problems Journal of Computing in Civil Engineering 11 3 1997 184 189 (Pubitemid 127590539)
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.-W.1
Liu, L.2
Burns, S.A.3
-
27
-
-
29144449379
-
Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks
-
DOI 10.1016/j.autcon.2005.04.001, PII S0926580505000609
-
C.-W. Feng, and H.-T. Wu Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks Automation in Construction 15 2006 186 199 (Pubitemid 41817147)
-
(2006)
Automation in Construction
, vol.15
, Issue.2
, pp. 186-199
-
-
Feng, C.-W.1
Wu, H.-T.2
-
28
-
-
77952950281
-
Multi-objective optimization of time-cost tradeoff using harmony search
-
Z.W. Geem Multi-objective optimization of time-cost tradeoff using harmony search Journal of Construction Engineering and Management 136 6 2010 711 716
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.6
, pp. 711-716
-
-
Geem, Z.W.1
-
30
-
-
40649101669
-
Evolutionary resource scheduler for linear projects
-
M.E. Georgy Evolutionary resource scheduler for linear projects Automation in Construction 17 2008 573 583
-
(2008)
Automation in Construction
, vol.17
, pp. 573-583
-
-
Georgy, M.E.1
-
31
-
-
33646598024
-
What is preproject planning, anyway?
-
G.E. Gibson Jr., Y.-R. Wang, C.-S. Cho, and M.P. Pappas What is preproject planning, anyway? Journal of Management in Engineering 22 1 2006 35 42
-
(2006)
Journal of Management in Engineering
, vol.22
, Issue.1
, pp. 35-42
-
-
Gibson Jr., G.E.1
Wang, Y.-R.2
Cho, C.-S.3
Pappas, M.P.4
-
32
-
-
0032654594
-
Genetic algorithms application and testing for equipment selection
-
A. Haidar, S. Naoum, R. Howes, and J. Tah Genetic algorithms application and testing for equipment selection Journal of Construction Engineering and Management 125 1 1999 32 38
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.1
, pp. 32-38
-
-
Haidar, A.1
Naoum, S.2
Howes, R.3
Tah, J.4
-
33
-
-
64049109482
-
Simulated annealing and tabu search for multi-mode project payment scheduling
-
Z. He, N. Wang, T. Jia, and Y. Xu Simulated annealing and tabu search for multi-mode project payment scheduling European Journal of Operational Research 198 2009 688 696
-
(2009)
European Journal of Operational Research
, vol.198
, pp. 688-696
-
-
He, Z.1
Wang, N.2
Jia, T.3
Xu, Y.4
-
34
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
T. Hegazy Optimization of resource allocation and leveling using genetic algorithms Journal of Construction Engineering and Management 125 3 1999 167 175
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
36
-
-
13944255840
-
Genetic optimization for dynamic project control
-
DOI 10.1061/(ASCE)0733-9364(2003)129:4(396)
-
T. Hegazy, and K. Petzold Genetic optimization for dynamic project control Journal of Construction Engineering and Management 129 4 2003 396 404 (Pubitemid 40265453)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 396-404
-
-
Hegazy, T.1
Petzold, K.2
-
37
-
-
0037448773
-
Solving the shortest route cut and fill problem using simulated annealing
-
D. Henderson, D.E. Vaughan, S.H. Jacobson, R.R. Wakefield, and E.C. Sewell Solving the shortest route cut and fill problem using simulated annealing European Journal of Operational Research 145 2003 72 84
-
(2003)
European Journal of Operational Research
, vol.145
, pp. 72-84
-
-
Henderson, D.1
Vaughan, D.E.2
Jacobson, S.H.3
Wakefield, R.R.4
Sewell, E.C.5
-
38
-
-
57649158649
-
A GA optimization model for workgroup-based repetitive scheduling (WoRSM)
-
R.-Y. Huang, and K.-S. Sun A GA optimization model for workgroup-based repetitive scheduling (WoRSM) Advances in Engineering Software 40 2009 212 228
-
(2009)
Advances in Engineering Software
, vol.40
, pp. 212-228
-
-
Huang, R.-Y.1
Sun, K.-S.2
-
39
-
-
33847198334
-
Optimization of floor-level construction material layout using genetic algorithms
-
H. Jang, S. Lee, and S. Choi Optimization of floor-level construction material layout using genetic algorithms Automation in Construction 16 2007 531 545
-
(2007)
Automation in Construction
, vol.16
, pp. 531-545
-
-
Jang, H.1
Lee, S.2
Choi, S.3
-
40
-
-
33646171275
-
Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
-
A. Kandil, and K. El-Rayes Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects Journal of Construction Engineering and Management 132 5 2006 491 498
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.5
, pp. 491-498
-
-
Kandil, A.1
El-Rayes, K.2
-
41
-
-
75649121877
-
Optimization research: Enhancing the robustness of large scale multi-objective optimization in construction
-
A. Kandil, K. El-Rayes, and O. El-Anwar Optimization research: enhancing the robustness of large scale multi-objective optimization in construction Journal of Construction Engineering and Management 136 1 2010 17 25
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.1
, pp. 17-25
-
-
Kandil, A.1
El-Rayes, K.2
El-Anwar, O.3
-
42
-
-
25644451090
-
Project scheduling problem with stochastic activity duration times
-
DOI 10.1016/j.amc.2004.09.002, PII S0096300304006083
-
H. Ke, and B. Liu Project scheduling problem with stochastic activity duration times Applied Mathematics and Computation 168 2005 342 353 (Pubitemid 41383665)
-
(2005)
Applied Mathematics and Computation
, vol.168
, Issue.1
, pp. 342-353
-
-
Ke, H.1
Liu, B.2
-
43
-
-
18144382336
-
Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
-
DOI 10.1061/(ASCE)0887-3801(2005)19:2(208)
-
G.H. Kim, D.S. Seo, and K.I. Kang Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates Journal of Computing in Civil Engineering 19 2 2005 208 211 (Pubitemid 40609907)
-
(2005)
Journal of Computing in Civil Engineering
, vol.19
, Issue.2
, pp. 208-211
-
-
Kim, G.H.1
Seo, D.S.2
Kang, K.I.3
-
45
-
-
0036011020
-
An optimal construction resource leveling scheduling simulation model
-
DOI 10.1139/l02-007
-
S.-S. Leu, and T.-H. Hung An optimal construction resource leveling scheduling simulation model Canadian Journal of Civil Engineering 29 2002 267 275 (Pubitemid 34979475)
-
(2002)
Canadian Journal of Civil Engineering
, vol.29
, Issue.2
, pp. 267-275
-
-
Leu, S.-S.1
Hung, T.-H.2
-
46
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
-
S.-S. Leu, and C.-H. Yang GA-based multicriteria optimal model for construction scheduling Journal of Construction Engineering and Management 125 6 1999 420 427 (Pubitemid 30509596)
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.-S.1
Yang, C.-H.2
-
47
-
-
0034324916
-
Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
-
S.-S. Leu, C.-H. Yang, and J.-C. Huang Resource leveling in construction by genetic algorithm-based optimization and its decision support system application Automation in Construction 10 2000 27 41
-
(2000)
Automation in Construction
, vol.10
, pp. 27-41
-
-
Leu, S.-S.1
Yang, C.-H.2
Huang, J.-C.3
-
48
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
H. Li, and P. Love using improved genetic algorithms to facilitate time-cost optimization Journal of Construction Engineering and Management 123 3 1997 233 237 (Pubitemid 127590561)
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.2
-
49
-
-
0032187321
-
Site-Level Facilities Layout Using Genetic Algorithms
-
H. Li, and P.E.D. Love Site-level facilities layout using genetic algorithms Journal of Computing in Civil Engineering 12 4 1998 227 231 (Pubitemid 128497199)
-
(1998)
Journal of Computing in Civil Engineering
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.E.D.2
-
50
-
-
0033880829
-
Genetic search for solving construction site-level unequal-area facility layout problems
-
DOI 10.1016/S0926-5805(99)00006-0
-
H. Li, and P.E.D. Love Genetic search for solving construction site-level unequal-area facility layout problems Automation in Construction 9 2000 217 226 (Pubitemid 30541681)
-
(2000)
Automation in construction
, vol.9
, Issue.2
, pp. 217-226
-
-
Li, H.1
Love, P.E.D.2
-
51
-
-
58749087373
-
A study of project selection and feature weighting for analogy based software cost estimation
-
Y.F. Li, M. Xie, and T.N. Goh A study of project selection and feature weighting for analogy based software cost estimation The Journal of Systems and Software 82 2009 241 252
-
(2009)
The Journal of Systems and Software
, vol.82
, pp. 241-252
-
-
Li, Y.F.1
Xie, M.2
Goh, T.N.3
-
52
-
-
41749100125
-
The strategies of tabu search technique for facility layout optimization
-
L.Y. Liang, and W.C. Chao The strategies of tabu search technique for facility layout optimization Automation in Construction 17 2008 657 669
-
(2008)
Automation in Construction
, vol.17
, pp. 657-669
-
-
Liang, L.Y.1
Chao, W.C.2
-
53
-
-
78049297417
-
Two hybrid differential evolution algorithms for engineering design optimization
-
T.W. Liao Two hybrid differential evolution algorithms for engineering design optimization Applied Soft Computing 10 2010 1188 1199
-
(2010)
Applied Soft Computing
, vol.10
, pp. 1188-1199
-
-
Liao, T.W.1
-
54
-
-
38649112575
-
Multi-criteria human resource allocation for solving multistage combinatorial optimization problems using multiobjective hybrid genetic algorithm
-
DOI 10.1016/j.eswa.2007.04.016, PII S0957417407001406
-
C.-M. Lin, and M. Gen Multi-criteria human resource allocation for solving multistage combinatorial optimization problems using multiobjective hybrid genetic algorithm Expert Systems with Applications 34 2008 2480 2490 (Pubitemid 351173757)
-
(2008)
Expert Systems with Applications
, vol.34
, Issue.4
, pp. 2480-2490
-
-
Lin, C.-M.1
Gen, M.2
-
55
-
-
63549088269
-
A genetic algorithm-based method for scheduling repetitive construction projects
-
L.D. Long, and A. Ohsato A genetic algorithm-based method for scheduling repetitive construction projects Automation in Construction 18 2009 499 511
-
(2009)
Automation in Construction
, vol.18
, pp. 499-511
-
-
Long, L.D.1
Ohsato, A.2
-
56
-
-
0242490426
-
Constraint-based genetic algorithm for earthmoving fleet selection
-
DOI 10.1139/l03-006
-
M. Marzouk, and O. Moselhi Constraint-based genetic algorithm for earthmoving fleet selection Canadian Journal of Civil Engineering 30 2003 673 683 (Pubitemid 37375247)
-
(2003)
Canadian Journal of Civil Engineering
, vol.30
, Issue.4
, pp. 673-683
-
-
Marzouk, M.1
Moselhi, O.2
-
57
-
-
13944277711
-
Multiobjective optimization of earthmoving operations
-
DOI 10.1061/(ASCE)0733-9364(2004)130:1(105)
-
M. Marzouk, and O. Moselhi Multiobjective optimization of earthmoving operations Journal of Construction Engineering and Management 130 1 2004 105 113 (Pubitemid 40265411)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.1
, pp. 105-113
-
-
Marzouk, M.1
Moselhi, O.2
-
58
-
-
4344695708
-
Genetic algorithms for construction site layout in project planning
-
DOI 10.1061/(ASCE)0733-9364(2002)128:5(418)
-
M.J. Mawdesley, S.H. Al-jibouri, and H. Yang Genetic algorithms for construction site layout in project planning Journal of Construction Engineering and Management 128 5 2002 418 426 (Pubitemid 40265526)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.5
, pp. 418-426
-
-
Mawdesley, M.J.1
Al-jibouri, S.H.2
Yang, H.3
-
59
-
-
4344602193
-
Application of GA in optimal robot selection for bridge restoration
-
A. McCrea, and R. Navon Application of GA in optimal robot selection for bridge restoration Automation in Construction 13 2004 803 819
-
(2004)
Automation in Construction
, vol.13
, pp. 803-819
-
-
McCrea, A.1
Navon, R.2
-
60
-
-
34250678915
-
Design process sequencing with competent genetic algorithms
-
DOI 10.1115/1.2717224
-
C. Meier, A.A. Yassine, and T.R. Browning "Design process sequencing with competent genetic algorithms", Journal of Mechanical Design Transactions of the ASME 129 2007 566 585 (Pubitemid 46939122)
-
(2007)
Journal of Mechanical Design, Transactions of the ASME
, vol.129
, Issue.6
, pp. 566-585
-
-
Meier, C.1
Yassine, A.A.2
Browning, T.R.3
-
61
-
-
0031191045
-
Selection of optimal construction robot using genetic algorithm
-
R. Navon, and A. McCrea Selection of an optimal construction robot using genetic algorithm Journal of Computing in Civil Engineering 11 3 1997 175 183 (Pubitemid 127590538)
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.3
, pp. 175-183
-
-
Navon, R.1
McCrea, A.M.2
-
62
-
-
49749102449
-
Optimizing construction time and cost using ant colony optimization approach
-
S.T. Ng, and Y. Zhang Optimizing construction time and cost using ant colony optimization approach Journal of Construction Engineering and Management 134 9 2008 721 728
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.9
, pp. 721-728
-
-
Ng, S.T.1
Zhang, Y.2
-
63
-
-
60449109741
-
Optimized resource allocation for software release planning
-
A. Nge-The, and G. Ruhe Optimized resource allocation for software release planning IEEE Transactions on Software Engineering 35 1 2009 109 123
-
(2009)
IEEE Transactions on Software Engineering
, vol.35
, Issue.1
, pp. 109-123
-
-
Nge-The, A.1
Ruhe, G.2
-
64
-
-
70449526183
-
Dynamic construction site layout planning using max-min ant system
-
X. Ning, K.-C. Lam, and M.C.-K. Lam Dynamic construction site layout planning using max-min ant system Automation in Construction 19 2010 55 65
-
(2010)
Automation in Construction
, vol.19
, pp. 55-65
-
-
Ning, X.1
Lam, K.-C.2
Lam, M.C.-K.3
-
65
-
-
13544270787
-
An effective genetic algorithm approach to multiobjective resource allocation problems (MORAPs)
-
DOI 10.1016/j.amc.2003.10.057, PII S0096300304002589
-
M.S. Osman, M.A. Abo-Sinna, and A.A. Mousa An effective genetic algorithm approach to multiobjective resource allocation problems (MORAPs) Applied Mathematics and Computation 163 2005 755 768 (Pubitemid 40219918)
-
(2005)
Applied Mathematics and Computation
, vol.163
, Issue.2
, pp. 755-768
-
-
Osman, M.S.1
Abo-Sinna, M.A.2
Mousa, A.A.3
-
66
-
-
55649114171
-
Neural network embedded multiobjective genetic algorithm to solve non-linear time-cost tradeoff problems of project scheduling
-
B.K. Pathak, S. Srivastava, and K. Srivastava Neural network embedded multiobjective genetic algorithm to solve non-linear time-cost tradeoff problems of project scheduling Journal of Scientific & Industrial Research 67 2008 124 131
-
(2008)
Journal of Scientific & Industrial Research
, vol.67
, pp. 124-131
-
-
Pathak, B.K.1
Srivastava, S.2
Srivastava, K.3
-
67
-
-
67349195453
-
A multi-mode resource constrained discrete time-cost tradeoff problem and its genetic algorithm based solution
-
W. Peng, and C. Wang A multi-mode resource constrained discrete time-cost tradeoff problem and its genetic algorithm based solution International Journal of Project Management 27 2009 600 609
-
(2009)
International Journal of Project Management
, vol.27
, pp. 600-609
-
-
Peng, W.1
Wang, C.2
-
68
-
-
13944256583
-
Incorporating practicability into genetic algorithm-based time-cost optimization
-
DOI 10.1061/(ASCE)0733-9364(2002)128:2(139)
-
B.C. Que Incorporating practicability into genetic algorithm-based time-cost optimization Journal of Construction Engineering and Management 128 2 2002 139 143 (Pubitemid 40265561)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.2
, pp. 139-143
-
-
Que, B.C.1
-
69
-
-
49549103081
-
Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
-
M. Rogalska, W. Bozejko, and Z. Hejducki Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling Automation in Construction 18 2008 24 31
-
(2008)
Automation in Construction
, vol.18
, pp. 24-31
-
-
Rogalska, M.1
Bozejko, W.2
Hejducki, Z.3
-
70
-
-
36249023087
-
Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models
-
DOI 10.1061/(ASCE)0733-9364(2007)133:12(982)
-
O. Salem, A. Shahin, and Y. Khalifa Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models Journal of Construction Engineering and Management 133 12 2007 982 992 (Pubitemid 350129071)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.12
, pp. 982-992
-
-
Salem, O.1
Shahin, A.2
Khalifa, Y.3
-
71
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
-
A.B. Senouci, and N.N. Eldin Use of genetic algorithms in resource scheduling of construction projects Journal of Construction Engineering and Management 130 6 2004 869 877 (Pubitemid 40265320)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
72
-
-
3042751093
-
Using genetic algorithms in solving the one-dimensional cutting stock problem in the construction industry
-
DOI 10.1139/l03-101
-
A.A. Shahin, and O.M. Salem Using genetic algorithms in solving the one-dimensional cutting stock problem in the construction industry Canadian Journal of Civil Engineering 31 2004 321 332 (Pubitemid 38861284)
-
(2004)
Canadian Journal of Civil Engineering
, vol.31
, Issue.2
, pp. 321-332
-
-
Shahin, A.A.1
Salem, O.M.2
-
73
-
-
0041427756
-
Path planning in construction sites: Performance evaluation of the Dijkstra, A*, and GA search algorithms
-
A.R. Soltani, H. Tawifik, J.Y. Goulermas, and T. Fernando Path planning in construction sites: performance evaluation of the Dijkstra, A*, and GA search algorithms Advanced Engineering Informatics 16 2002 291 303
-
(2002)
Advanced Engineering Informatics
, vol.16
, pp. 291-303
-
-
Soltani, A.R.1
Tawifik, H.2
Goulermas, J.Y.3
Fernando, T.4
-
74
-
-
0032633457
-
Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach
-
J. Son, and M.J. Skibniewski Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach Journal of Construction Engineering and Management 125 1 1999 23 31
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.1
, pp. 23-31
-
-
Son, J.1
Skibniewski, M.J.2
-
76
-
-
0036027411
-
A review of the contribution of Operational Research to Project Management
-
DOI 10.1016/S0377-2217(01)00097-2, PII S0377221701000972
-
L.V. Tavares A review of the contribution of operational research to project management European Journal of Operational Research 136 2002 1 18 (Pubitemid 33018800)
-
(2002)
European Journal of Operational Research
, vol.136
, Issue.1
, pp. 1-18
-
-
Tavares, L.V.1
-
77
-
-
0344441886
-
The contribution of mathematical modeling to the practice of project management
-
T.M. Williams The contribution of mathematical modeling to the practice of project management IMA Journal of Management Mathematics 14 1 2003 3 30
-
(2003)
IMA Journal of Management Mathematics
, vol.14
, Issue.1
, pp. 3-30
-
-
Williams, T.M.1
-
78
-
-
77956845478
-
Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning
-
C.K. Wong, I.W.H. Fung, and C.M. Tam Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning Journal of Construction Engineering and Management 136 10 2010 1116 1128
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.10
, pp. 1116-1128
-
-
Wong, C.K.1
Fung, I.W.H.2
Tam, C.M.3
-
79
-
-
38149009704
-
Applying an ant colony optimization algorithm-based multiobjective approach for time-cost tradeoff
-
Y. Xiong, and Y. Kuang Applying an ant colony optimization algorithm-based multiobjective approach for time-cost tradeoff Journal of Construction Engineering and Management 134 2 2008 153 156
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.2
, pp. 153-156
-
-
Xiong, Y.1
Kuang, Y.2
-
80
-
-
34548513268
-
Ant colony optimization for disaster relief operations
-
DOI 10.1016/j.tre.2006.05.004, PII S136655450700021X, Challenges of Emergency Logistics Management
-
W. Yi, and A. Kumar Ant colony optimization for disaster relief operations Transportation Research Part E 43 2007 660 672 (Pubitemid 47371970)
-
(2007)
Transportation Research Part E: Logistics and Transportation Review
, vol.43
, Issue.6
, pp. 660-672
-
-
Yi, W.1
Kumar, A.2
-
81
-
-
33644584442
-
An colony optimization for the nonlinear resource allocation problem
-
P.-Y. Yin, and J.-Y. Wang An colony optimization for the nonlinear resource allocation problem Applied Mathematics and Computation 174 2006 1438 1453
-
(2006)
Applied Mathematics and Computation
, vol.174
, pp. 1438-1453
-
-
Yin, P.-Y.1
Wang, J.-Y.2
-
82
-
-
33845425531
-
A particle swarm optimization approach to the nonlinear resource allocation problem
-
DOI 10.1016/j.amc.2006.05.051, PII S0096300306005558
-
P.-Y. Yin, and J.-Y. Wang A particle swarm optimization approach to the nonlinear resource allocation problem Applied Mathematics and Computation 183 2006 232 242 (Pubitemid 44908603)
-
(2006)
Applied Mathematics and Computation
, vol.183
, Issue.1
, pp. 232-242
-
-
Yin, P.-Y.1
Wang, J.-Y.2
-
83
-
-
41249084562
-
Optimal multiple-objective resource allocation using hybrid particle swarm optimization and adaptive resource bounds technique
-
DOI 10.1016/j.cam.2007.04.018, PII S0377042707002191
-
P.-Y. Yin, and J.-Y. Wang Optimal multi-objective resource allocation using hybrid particle swarm optimization and adaptive resource bounds technique Journal of Computational and Applied Mathematics 216 2008 73 86 (Pubitemid 351446162)
-
(2008)
Journal of Computational and Applied Mathematics
, vol.216
, Issue.1
, pp. 73-86
-
-
Yin, P.-Y.1
Wang, J.-Y.2
-
84
-
-
70350070859
-
Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets
-
B. Zahraie, and M. Tavakolan Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets Journal of Construction Engineering and Management 135 11 2009 1162 1171
-
(2009)
Journal of Construction Engineering and Management
, vol.135
, Issue.11
, pp. 1162-1171
-
-
Zahraie, B.1
Tavakolan, M.2
-
85
-
-
49749097235
-
Particle swarm optimization for construction site unequal-area layout
-
H. Zhang, and J.Y. Wang Particle swarm optimization for construction site unequal-area layout Journal of Construction Engineering and Management 134 9 2008 739 748
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.9
, pp. 739-748
-
-
Zhang, H.1
Wang, J.Y.2
-
86
-
-
0033101167
-
Location optimization for a group of tower cranes
-
P. Zhang, F.C. Harris, P.O. Olomolaiye, and G.D. Holt Location optimization for a group of tower cranes Journal of Construction Engineering and Management 125 2 1999 115 122
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.2
, pp. 115-122
-
-
Zhang, P.1
Harris, F.C.2
Olomolaiye, P.O.3
Holt, G.D.4
-
87
-
-
2342615793
-
Applying a genetic algorithm-based multiobjective approach for time-cost optimization
-
DOI 10.1061/(ASCE)0733-9364(2004)130:2(168)
-
D.X.M. Zheng, S.T. Ng, and M.M. Kumaraswamy Applying a genetic algorithm-based multiobjective approach for time-cost optimization Journal of Construction Engineering and Management 130 2 2004 168 176 (Pubitemid 40265383)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.2
, pp. 168-176
-
-
Zheng, D.X.M.1
Ng, S.T.2
Kumaraswamy, M.M.3
-
88
-
-
12344265028
-
Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
-
DOI 10.1061/(ASCE)0733-9364(2005)131:1(81)
-
D.X.M. Zheng, S.T. Ng, and M.M. Kumaraswamy Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization Journal of Construction Engineering and Management 131 1 2005 81 91 (Pubitemid 40135235)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.1
, pp. 81-91
-
-
Zheng, D.X.M.1
Ng, S.T.2
Kumaraswamy, M.M.3
-
89
-
-
2342444431
-
Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
-
DOI 10.1061/(ASCE)0887-3801(2002)16:2(143)
-
P.P. Zouein, H. Harmanani, and A. Hajar Genetic algorithm for solving site layout problem with unequal-size and constrained facilities Journal of Computing in Civil Engineering 16 2 2002 143 151 (Pubitemid 40475289)
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.2
, pp. 143-151
-
-
Zouein, P.P.1
Harmanani, H.2
Hajar, A.3
-
90
-
-
34249055671
-
Planning effort as an effective risk management tool
-
DOI 10.1016/j.jom.2006.12.001, PII S027269630600146X
-
O. Zwikael, and A. Sadeh Planning effort as an effective risk management tool Journal of Operations Management 25 2007 755 767 (Pubitemid 46779019)
-
(2007)
Journal of Operations Management
, vol.25
, Issue.4
, pp. 755-767
-
-
Zwikael, O.1
Sadeh, A.2
|