메뉴 건너뛰기




Volumn 20, Issue 5, 2011, Pages 491-505

Metaheuristics for project and construction management - A state-of-the-art review

Author keywords

Ant colony optimization; Construction management; Evolutionary algorithm; Genetic algorithm; Metaheuristic; Optimization; Particle swarm optimization; Project management

Indexed keywords

ANT-COLONY OPTIMIZATION; APPROXIMATE SOLUTION; CONSTRUCTION MANAGEMENT; COST ESTIMATIONS; CRITICAL PROBLEMS; ENGINEERING PROJECT; GLOBAL OPTIMUM; LARGE-SCALE PROJECTS; LIFE-TIMES; META HEURISTICS; METAHEURISTIC; MONITORING AND CONTROL; RESEARCH AREAS; STATE-OF-THE-ART REVIEWS;

EID: 79957534995     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2010.12.006     Document Type: Review
Times cited : (99)

References (90)
  • 1
    • 64049111991 scopus 로고    scopus 로고
    • Using ant colony optimization algorithm for solving project management problems
    • H. Abdallah, H.M. Emara, H.T. Dorrach, and A. Bahgat Using ant colony optimization algorithm for solving project management problems Expert Systems with Applications 36 2009 10004 10015
    • (2009) Expert Systems with Applications , vol.36 , pp. 10004-10015
    • Abdallah, H.1    Emara, H.M.2    Dorrach, H.T.3    Bahgat, A.4
  • 3
    • 34047092353 scopus 로고    scopus 로고
    • A parameter-free self-adapting boundary genetic search for pipe network optimization
    • DOI 10.1007/s10589-007-9016-1
    • M.H. Afshar, and M.A. Mariño A parameter-free self adapting boundary genetic search for pipe network optimization Computer Optimization and Applications 37 2007 83 102 (Pubitemid 46516450)
    • (2007) Computational Optimization and Applications , vol.37 , Issue.1 , pp. 83-102
    • Afshar, M.H.1    Marino, M.A.2
  • 4
    • 33947217417 scopus 로고    scopus 로고
    • Software project management with GAs
    • DOI 10.1016/j.ins.2006.12.020, PII S0020025507000175
    • E. Alba, and J.F. Chicano Software project management with GAs Information Sciences 177 2007 2380 2401 (Pubitemid 46435498)
    • (2007) Information Sciences , vol.177 , Issue.11 , pp. 2380-2401
    • Alba, E.1    Francisco Chicano, J.2
  • 5
    • 26044472796 scopus 로고    scopus 로고
    • A genetic algorithm approach for the time-cost trade-off in PERT networks
    • DOI 10.1016/j.amc.2004.10.021, PII S0096300304007040
    • A. Azaron, C. Perkgoz, and M. Sakawa A genetic algorithm approach for the time-cost tradeoff in PERT networks Applied Mathematics and Computation 168 2005 1317 1339 (Pubitemid 41405681)
    • (2005) Applied Mathematics and Computation , vol.168 , Issue.2 , pp. 1317-1339
    • Azaron, A.1    Perkgoz, C.2    Sakawa, M.3
  • 7
    • 43049173388 scopus 로고    scopus 로고
    • An effective ant colony optimization algorithm for multi-objective resource allocation problem
    • S.K. Chaharsooghi, and A.H.M. Kermani An effective ant colony optimization algorithm for multi-objective resource allocation problem Applied Mathematics and Computation 200 2008 167 177
    • (2008) Applied Mathematics and Computation , vol.200 , pp. 167-177
    • Chaharsooghi, S.K.1    Kermani, A.H.M.2
  • 10
    • 0042286934 scopus 로고    scopus 로고
    • Genetic Algorithms for Project Management
    • DOI 10.1023/A:1012543203763
    • C.K. Chang, M.J. Christensen, and T. Zhang Genetic algorithms for project management Annals of Software Engineering 11 2001 107 139 (Pubitemid 33634472)
    • (2001) Annals of Software Engineering , vol.11 , Issue.1 , pp. 107-139
    • Chang, C.K.1    Christensen, M.J.2    Zhang, T.3
  • 11
    • 2642577642 scopus 로고    scopus 로고
    • A two-stage dynamic model on allocation of construction facilities with genetic algorithm
    • K.W. Chau A two-stage dynamic model on allocation of construction facilities with genetic algorithm Automation in Construction 13 2004 481 490
    • (2004) Automation in Construction , vol.13 , pp. 481-490
    • Chau, K.W.1
  • 12
    • 63549109485 scopus 로고    scopus 로고
    • A two-phase GA model for resource-constrained project scheduling
    • P.-H. Chen, and H. Weng A two-phase GA model for resource-constrained project scheduling Automation in Construction 18 2009 485 498
    • (2009) Automation in Construction , vol.18 , pp. 485-498
    • Chen, P.-H.1    Weng, H.2
  • 13
    • 57649199673 scopus 로고    scopus 로고
    • Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model
    • M.-Y. Cheng, H.-C. Tsai, and W.-S. Hsieh Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model Automation in Construction 18 2009 164 172
    • (2009) Automation in Construction , vol.18 , pp. 164-172
    • Cheng, M.-Y.1    Tsai, H.-C.2    Hsieh, W.-S.3
  • 14
    • 0036028136 scopus 로고    scopus 로고
    • Site pre-cast yard layout arrangement through genetic algorithms
    • DOI 10.1016/S0926-5805(01)00044-9, PII S0926580501000449
    • S.-O. Cheung, T.K.-L. Tong, and C.-M. Tam Site precast yard layout arrangement through genetic algorithm Automation in Construction 11 2002 35 46 (Pubitemid 32833464)
    • (2002) Automation in Construction , vol.11 , Issue.1 , pp. 35-46
    • Cheung, S.-O.1    Tong, T.K.-L.2    Tam, C.-M.3
  • 15
    • 58949090464 scopus 로고    scopus 로고
    • Construction imitating ants: Resource-unconstrained scheduling with artificial ants
    • S. Christodoulou Construction imitating ants: Resource-unconstrained scheduling with artificial ants Automation in Construction 18 2009 285 293
    • (2009) Automation in Construction , vol.18 , pp. 285-293
    • Christodoulou, S.1
  • 16
    • 0037845174 scopus 로고    scopus 로고
    • Optimal testing-resource allocation with genetic algorithm for modular software systems
    • Y.S. Dai, M. Xie, K.L. Poh, and B. Yang Optimal testing-resource allocation with genetic algorithm for modular software systems The Journal of Systems and Software 66 2003 47 55
    • (2003) The Journal of Systems and Software , vol.66 , pp. 47-55
    • Dai, Y.S.1    Xie, M.2    Poh, K.L.3    Yang, B.4
  • 17
    • 55849085727 scopus 로고    scopus 로고
    • A multi-objective evolutionary algorithm to exploit the similarities of resource allocation problems
    • D. Datta, C.M. Fonseca, and K. Deb A multi-objective evolutionary algorithm to exploit the similarities of resource allocation problems Journal of Scheduling 11 2008 405 419
    • (2008) Journal of Scheduling , vol.11 , pp. 405-419
    • Datta, D.1    Fonseca, C.M.2    Deb, K.3
  • 18
    • 0035612932 scopus 로고    scopus 로고
    • A two stage search heuristic for scheduling payments in projects
    • N. Dayanand, and R. Padman A two stage search heuristic for scheduling payments in projects Annals of Operations Research 102 2001 197 220
    • (2001) Annals of Operations Research , vol.102 , pp. 197-220
    • Dayanand, N.1    Padman, R.2
  • 19
    • 0033729054 scopus 로고    scopus 로고
    • An efficient constraint handling method for genetic algorithms
    • K. Deb An efficient constraint handling method for genetic algorithms Computer Methods in Applied Mechanics and Engineering 186 2000 311 338
    • (2000) Computer Methods in Applied Mechanics and Engineering , vol.186 , pp. 311-338
    • Deb, K.1
  • 20
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: NSGA-II
    • DOI 10.1109/4235.996017, PII S1089778X02041012
    • K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan A fast and elitist multiobjective genetic algorithm: NSGA-II IEEE Transactions on Evolutionary Computation 6 2002 182 197 (Pubitemid 34555372)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 21
    • 77955569892 scopus 로고    scopus 로고
    • Improved ant colony optimization algorithms for determining project critical paths
    • Q. Duan, and T.W. Liao Improved ant colony optimization algorithms for determining project critical paths Automation in Construction 19 2010 676 693
    • (2010) Automation in Construction , vol.19 , pp. 676-693
    • Duan, Q.1    Liao, T.W.2
  • 22
    • 48249115605 scopus 로고    scopus 로고
    • A modified shuffled frog-leaping optimization algorithm: Applications to project management
    • E. Elbeltagi, T. Hegazy, and D. Grierson A modified shuffled frog-leaping optimization algorithm: applications to project management Structure and Infrastructure Engineering 3 1 2007 53 60
    • (2007) Structure and Infrastructure Engineering , vol.3 , Issue.1 , pp. 53-60
    • Elbeltagi, E.1    Hegazy, T.2    Grierson, D.3
  • 23
    • 67349118477 scopus 로고    scopus 로고
    • Fuzzy-based MOGA approach to stochastic time-cost tradeoff problem
    • E. Eshtehardian, A. Afshar, and R. Abbasnia Fuzzy-based MOGA approach to stochastic time-cost tradeoff problem Automation in Construction 18 2009 692 701
    • (2009) Automation in Construction , vol.18 , pp. 692-701
    • Eshtehardian, E.1    Afshar, A.2    Abbasnia, R.3
  • 24
    • 0030784381 scopus 로고    scopus 로고
    • Scheduling projects to maximize net present value - The case of time-dependent, contingent cash flows
    • R. Etgar, A. Shtub, and L.J. LeBlanc Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows European Journal of Operational Research 96 1996 90 96 (Pubitemid 127415911)
    • (1997) European Journal of Operational Research , vol.96 , Issue.1 , pp. 90-96
    • Etgar, R.1    Shtub, A.2    Leblanc, L.J.3
  • 25
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • C.-W. Feng, L. Liu, and S.A. Burns Using genetic algorithms to solve construction time-cost tradeoff problems Journal of Computing in Civil Engineering 11 3 1997 184 189 (Pubitemid 127590539)
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.-W.1    Liu, L.2    Burns, S.A.3
  • 27
    • 29144449379 scopus 로고    scopus 로고
    • Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks
    • DOI 10.1016/j.autcon.2005.04.001, PII S0926580505000609
    • C.-W. Feng, and H.-T. Wu Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks Automation in Construction 15 2006 186 199 (Pubitemid 41817147)
    • (2006) Automation in Construction , vol.15 , Issue.2 , pp. 186-199
    • Feng, C.-W.1    Wu, H.-T.2
  • 28
    • 77952950281 scopus 로고    scopus 로고
    • Multi-objective optimization of time-cost tradeoff using harmony search
    • Z.W. Geem Multi-objective optimization of time-cost tradeoff using harmony search Journal of Construction Engineering and Management 136 6 2010 711 716
    • (2010) Journal of Construction Engineering and Management , vol.136 , Issue.6 , pp. 711-716
    • Geem, Z.W.1
  • 30
    • 40649101669 scopus 로고    scopus 로고
    • Evolutionary resource scheduler for linear projects
    • M.E. Georgy Evolutionary resource scheduler for linear projects Automation in Construction 17 2008 573 583
    • (2008) Automation in Construction , vol.17 , pp. 573-583
    • Georgy, M.E.1
  • 33
    • 64049109482 scopus 로고    scopus 로고
    • Simulated annealing and tabu search for multi-mode project payment scheduling
    • Z. He, N. Wang, T. Jia, and Y. Xu Simulated annealing and tabu search for multi-mode project payment scheduling European Journal of Operational Research 198 2009 688 696
    • (2009) European Journal of Operational Research , vol.198 , pp. 688-696
    • He, Z.1    Wang, N.2    Jia, T.3    Xu, Y.4
  • 34
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • T. Hegazy Optimization of resource allocation and leveling using genetic algorithms Journal of Construction Engineering and Management 125 3 1999 167 175
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 36
    • 13944255840 scopus 로고    scopus 로고
    • Genetic optimization for dynamic project control
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(396)
    • T. Hegazy, and K. Petzold Genetic optimization for dynamic project control Journal of Construction Engineering and Management 129 4 2003 396 404 (Pubitemid 40265453)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 396-404
    • Hegazy, T.1    Petzold, K.2
  • 38
    • 57649158649 scopus 로고    scopus 로고
    • A GA optimization model for workgroup-based repetitive scheduling (WoRSM)
    • R.-Y. Huang, and K.-S. Sun A GA optimization model for workgroup-based repetitive scheduling (WoRSM) Advances in Engineering Software 40 2009 212 228
    • (2009) Advances in Engineering Software , vol.40 , pp. 212-228
    • Huang, R.-Y.1    Sun, K.-S.2
  • 39
    • 33847198334 scopus 로고    scopus 로고
    • Optimization of floor-level construction material layout using genetic algorithms
    • H. Jang, S. Lee, and S. Choi Optimization of floor-level construction material layout using genetic algorithms Automation in Construction 16 2007 531 545
    • (2007) Automation in Construction , vol.16 , pp. 531-545
    • Jang, H.1    Lee, S.2    Choi, S.3
  • 40
    • 33646171275 scopus 로고    scopus 로고
    • Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
    • A. Kandil, and K. El-Rayes Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects Journal of Construction Engineering and Management 132 5 2006 491 498
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.5 , pp. 491-498
    • Kandil, A.1    El-Rayes, K.2
  • 41
    • 75649121877 scopus 로고    scopus 로고
    • Optimization research: Enhancing the robustness of large scale multi-objective optimization in construction
    • A. Kandil, K. El-Rayes, and O. El-Anwar Optimization research: enhancing the robustness of large scale multi-objective optimization in construction Journal of Construction Engineering and Management 136 1 2010 17 25
    • (2010) Journal of Construction Engineering and Management , vol.136 , Issue.1 , pp. 17-25
    • Kandil, A.1    El-Rayes, K.2    El-Anwar, O.3
  • 42
    • 25644451090 scopus 로고    scopus 로고
    • Project scheduling problem with stochastic activity duration times
    • DOI 10.1016/j.amc.2004.09.002, PII S0096300304006083
    • H. Ke, and B. Liu Project scheduling problem with stochastic activity duration times Applied Mathematics and Computation 168 2005 342 353 (Pubitemid 41383665)
    • (2005) Applied Mathematics and Computation , vol.168 , Issue.1 , pp. 342-353
    • Ke, H.1    Liu, B.2
  • 43
    • 18144382336 scopus 로고    scopus 로고
    • Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
    • DOI 10.1061/(ASCE)0887-3801(2005)19:2(208)
    • G.H. Kim, D.S. Seo, and K.I. Kang Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates Journal of Computing in Civil Engineering 19 2 2005 208 211 (Pubitemid 40609907)
    • (2005) Journal of Computing in Civil Engineering , vol.19 , Issue.2 , pp. 208-211
    • Kim, G.H.1    Seo, D.S.2    Kang, K.I.3
  • 45
    • 0036011020 scopus 로고    scopus 로고
    • An optimal construction resource leveling scheduling simulation model
    • DOI 10.1139/l02-007
    • S.-S. Leu, and T.-H. Hung An optimal construction resource leveling scheduling simulation model Canadian Journal of Civil Engineering 29 2002 267 275 (Pubitemid 34979475)
    • (2002) Canadian Journal of Civil Engineering , vol.29 , Issue.2 , pp. 267-275
    • Leu, S.-S.1    Hung, T.-H.2
  • 46
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
    • S.-S. Leu, and C.-H. Yang GA-based multicriteria optimal model for construction scheduling Journal of Construction Engineering and Management 125 6 1999 420 427 (Pubitemid 30509596)
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.-S.1    Yang, C.-H.2
  • 47
    • 0034324916 scopus 로고    scopus 로고
    • Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
    • S.-S. Leu, C.-H. Yang, and J.-C. Huang Resource leveling in construction by genetic algorithm-based optimization and its decision support system application Automation in Construction 10 2000 27 41
    • (2000) Automation in Construction , vol.10 , pp. 27-41
    • Leu, S.-S.1    Yang, C.-H.2    Huang, J.-C.3
  • 48
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • H. Li, and P. Love using improved genetic algorithms to facilitate time-cost optimization Journal of Construction Engineering and Management 123 3 1997 233 237 (Pubitemid 127590561)
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.2
  • 49
    • 0032187321 scopus 로고    scopus 로고
    • Site-Level Facilities Layout Using Genetic Algorithms
    • H. Li, and P.E.D. Love Site-level facilities layout using genetic algorithms Journal of Computing in Civil Engineering 12 4 1998 227 231 (Pubitemid 128497199)
    • (1998) Journal of Computing in Civil Engineering , vol.12 , Issue.4 , pp. 227-231
    • Li, H.1    Love, P.E.D.2
  • 50
    • 0033880829 scopus 로고    scopus 로고
    • Genetic search for solving construction site-level unequal-area facility layout problems
    • DOI 10.1016/S0926-5805(99)00006-0
    • H. Li, and P.E.D. Love Genetic search for solving construction site-level unequal-area facility layout problems Automation in Construction 9 2000 217 226 (Pubitemid 30541681)
    • (2000) Automation in construction , vol.9 , Issue.2 , pp. 217-226
    • Li, H.1    Love, P.E.D.2
  • 51
    • 58749087373 scopus 로고    scopus 로고
    • A study of project selection and feature weighting for analogy based software cost estimation
    • Y.F. Li, M. Xie, and T.N. Goh A study of project selection and feature weighting for analogy based software cost estimation The Journal of Systems and Software 82 2009 241 252
    • (2009) The Journal of Systems and Software , vol.82 , pp. 241-252
    • Li, Y.F.1    Xie, M.2    Goh, T.N.3
  • 52
    • 41749100125 scopus 로고    scopus 로고
    • The strategies of tabu search technique for facility layout optimization
    • L.Y. Liang, and W.C. Chao The strategies of tabu search technique for facility layout optimization Automation in Construction 17 2008 657 669
    • (2008) Automation in Construction , vol.17 , pp. 657-669
    • Liang, L.Y.1    Chao, W.C.2
  • 53
    • 78049297417 scopus 로고    scopus 로고
    • Two hybrid differential evolution algorithms for engineering design optimization
    • T.W. Liao Two hybrid differential evolution algorithms for engineering design optimization Applied Soft Computing 10 2010 1188 1199
    • (2010) Applied Soft Computing , vol.10 , pp. 1188-1199
    • Liao, T.W.1
  • 54
    • 38649112575 scopus 로고    scopus 로고
    • Multi-criteria human resource allocation for solving multistage combinatorial optimization problems using multiobjective hybrid genetic algorithm
    • DOI 10.1016/j.eswa.2007.04.016, PII S0957417407001406
    • C.-M. Lin, and M. Gen Multi-criteria human resource allocation for solving multistage combinatorial optimization problems using multiobjective hybrid genetic algorithm Expert Systems with Applications 34 2008 2480 2490 (Pubitemid 351173757)
    • (2008) Expert Systems with Applications , vol.34 , Issue.4 , pp. 2480-2490
    • Lin, C.-M.1    Gen, M.2
  • 55
    • 63549088269 scopus 로고    scopus 로고
    • A genetic algorithm-based method for scheduling repetitive construction projects
    • L.D. Long, and A. Ohsato A genetic algorithm-based method for scheduling repetitive construction projects Automation in Construction 18 2009 499 511
    • (2009) Automation in Construction , vol.18 , pp. 499-511
    • Long, L.D.1    Ohsato, A.2
  • 56
    • 0242490426 scopus 로고    scopus 로고
    • Constraint-based genetic algorithm for earthmoving fleet selection
    • DOI 10.1139/l03-006
    • M. Marzouk, and O. Moselhi Constraint-based genetic algorithm for earthmoving fleet selection Canadian Journal of Civil Engineering 30 2003 673 683 (Pubitemid 37375247)
    • (2003) Canadian Journal of Civil Engineering , vol.30 , Issue.4 , pp. 673-683
    • Marzouk, M.1    Moselhi, O.2
  • 57
    • 13944277711 scopus 로고    scopus 로고
    • Multiobjective optimization of earthmoving operations
    • DOI 10.1061/(ASCE)0733-9364(2004)130:1(105)
    • M. Marzouk, and O. Moselhi Multiobjective optimization of earthmoving operations Journal of Construction Engineering and Management 130 1 2004 105 113 (Pubitemid 40265411)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 105-113
    • Marzouk, M.1    Moselhi, O.2
  • 58
    • 4344695708 scopus 로고    scopus 로고
    • Genetic algorithms for construction site layout in project planning
    • DOI 10.1061/(ASCE)0733-9364(2002)128:5(418)
    • M.J. Mawdesley, S.H. Al-jibouri, and H. Yang Genetic algorithms for construction site layout in project planning Journal of Construction Engineering and Management 128 5 2002 418 426 (Pubitemid 40265526)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.5 , pp. 418-426
    • Mawdesley, M.J.1    Al-jibouri, S.H.2    Yang, H.3
  • 59
    • 4344602193 scopus 로고    scopus 로고
    • Application of GA in optimal robot selection for bridge restoration
    • A. McCrea, and R. Navon Application of GA in optimal robot selection for bridge restoration Automation in Construction 13 2004 803 819
    • (2004) Automation in Construction , vol.13 , pp. 803-819
    • McCrea, A.1    Navon, R.2
  • 61
    • 0031191045 scopus 로고    scopus 로고
    • Selection of optimal construction robot using genetic algorithm
    • R. Navon, and A. McCrea Selection of an optimal construction robot using genetic algorithm Journal of Computing in Civil Engineering 11 3 1997 175 183 (Pubitemid 127590538)
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.3 , pp. 175-183
    • Navon, R.1    McCrea, A.M.2
  • 62
    • 49749102449 scopus 로고    scopus 로고
    • Optimizing construction time and cost using ant colony optimization approach
    • S.T. Ng, and Y. Zhang Optimizing construction time and cost using ant colony optimization approach Journal of Construction Engineering and Management 134 9 2008 721 728
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.9 , pp. 721-728
    • Ng, S.T.1    Zhang, Y.2
  • 63
    • 60449109741 scopus 로고    scopus 로고
    • Optimized resource allocation for software release planning
    • A. Nge-The, and G. Ruhe Optimized resource allocation for software release planning IEEE Transactions on Software Engineering 35 1 2009 109 123
    • (2009) IEEE Transactions on Software Engineering , vol.35 , Issue.1 , pp. 109-123
    • Nge-The, A.1    Ruhe, G.2
  • 64
    • 70449526183 scopus 로고    scopus 로고
    • Dynamic construction site layout planning using max-min ant system
    • X. Ning, K.-C. Lam, and M.C.-K. Lam Dynamic construction site layout planning using max-min ant system Automation in Construction 19 2010 55 65
    • (2010) Automation in Construction , vol.19 , pp. 55-65
    • Ning, X.1    Lam, K.-C.2    Lam, M.C.-K.3
  • 65
    • 13544270787 scopus 로고    scopus 로고
    • An effective genetic algorithm approach to multiobjective resource allocation problems (MORAPs)
    • DOI 10.1016/j.amc.2003.10.057, PII S0096300304002589
    • M.S. Osman, M.A. Abo-Sinna, and A.A. Mousa An effective genetic algorithm approach to multiobjective resource allocation problems (MORAPs) Applied Mathematics and Computation 163 2005 755 768 (Pubitemid 40219918)
    • (2005) Applied Mathematics and Computation , vol.163 , Issue.2 , pp. 755-768
    • Osman, M.S.1    Abo-Sinna, M.A.2    Mousa, A.A.3
  • 66
    • 55649114171 scopus 로고    scopus 로고
    • Neural network embedded multiobjective genetic algorithm to solve non-linear time-cost tradeoff problems of project scheduling
    • B.K. Pathak, S. Srivastava, and K. Srivastava Neural network embedded multiobjective genetic algorithm to solve non-linear time-cost tradeoff problems of project scheduling Journal of Scientific & Industrial Research 67 2008 124 131
    • (2008) Journal of Scientific & Industrial Research , vol.67 , pp. 124-131
    • Pathak, B.K.1    Srivastava, S.2    Srivastava, K.3
  • 67
    • 67349195453 scopus 로고    scopus 로고
    • A multi-mode resource constrained discrete time-cost tradeoff problem and its genetic algorithm based solution
    • W. Peng, and C. Wang A multi-mode resource constrained discrete time-cost tradeoff problem and its genetic algorithm based solution International Journal of Project Management 27 2009 600 609
    • (2009) International Journal of Project Management , vol.27 , pp. 600-609
    • Peng, W.1    Wang, C.2
  • 68
    • 13944256583 scopus 로고    scopus 로고
    • Incorporating practicability into genetic algorithm-based time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2002)128:2(139)
    • B.C. Que Incorporating practicability into genetic algorithm-based time-cost optimization Journal of Construction Engineering and Management 128 2 2002 139 143 (Pubitemid 40265561)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.2 , pp. 139-143
    • Que, B.C.1
  • 69
    • 49549103081 scopus 로고    scopus 로고
    • Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
    • M. Rogalska, W. Bozejko, and Z. Hejducki Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling Automation in Construction 18 2008 24 31
    • (2008) Automation in Construction , vol.18 , pp. 24-31
    • Rogalska, M.1    Bozejko, W.2    Hejducki, Z.3
  • 70
    • 36249023087 scopus 로고    scopus 로고
    • Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models
    • DOI 10.1061/(ASCE)0733-9364(2007)133:12(982)
    • O. Salem, A. Shahin, and Y. Khalifa Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models Journal of Construction Engineering and Management 133 12 2007 982 992 (Pubitemid 350129071)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.12 , pp. 982-992
    • Salem, O.1    Shahin, A.2    Khalifa, Y.3
  • 71
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
    • A.B. Senouci, and N.N. Eldin Use of genetic algorithms in resource scheduling of construction projects Journal of Construction Engineering and Management 130 6 2004 869 877 (Pubitemid 40265320)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2
  • 72
    • 3042751093 scopus 로고    scopus 로고
    • Using genetic algorithms in solving the one-dimensional cutting stock problem in the construction industry
    • DOI 10.1139/l03-101
    • A.A. Shahin, and O.M. Salem Using genetic algorithms in solving the one-dimensional cutting stock problem in the construction industry Canadian Journal of Civil Engineering 31 2004 321 332 (Pubitemid 38861284)
    • (2004) Canadian Journal of Civil Engineering , vol.31 , Issue.2 , pp. 321-332
    • Shahin, A.A.1    Salem, O.M.2
  • 73
    • 0041427756 scopus 로고    scopus 로고
    • Path planning in construction sites: Performance evaluation of the Dijkstra, A*, and GA search algorithms
    • A.R. Soltani, H. Tawifik, J.Y. Goulermas, and T. Fernando Path planning in construction sites: performance evaluation of the Dijkstra, A*, and GA search algorithms Advanced Engineering Informatics 16 2002 291 303
    • (2002) Advanced Engineering Informatics , vol.16 , pp. 291-303
    • Soltani, A.R.1    Tawifik, H.2    Goulermas, J.Y.3    Fernando, T.4
  • 74
    • 0032633457 scopus 로고    scopus 로고
    • Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach
    • J. Son, and M.J. Skibniewski Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach Journal of Construction Engineering and Management 125 1 1999 23 31
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.1 , pp. 23-31
    • Son, J.1    Skibniewski, M.J.2
  • 76
    • 0036027411 scopus 로고    scopus 로고
    • A review of the contribution of Operational Research to Project Management
    • DOI 10.1016/S0377-2217(01)00097-2, PII S0377221701000972
    • L.V. Tavares A review of the contribution of operational research to project management European Journal of Operational Research 136 2002 1 18 (Pubitemid 33018800)
    • (2002) European Journal of Operational Research , vol.136 , Issue.1 , pp. 1-18
    • Tavares, L.V.1
  • 77
    • 0344441886 scopus 로고    scopus 로고
    • The contribution of mathematical modeling to the practice of project management
    • T.M. Williams The contribution of mathematical modeling to the practice of project management IMA Journal of Management Mathematics 14 1 2003 3 30
    • (2003) IMA Journal of Management Mathematics , vol.14 , Issue.1 , pp. 3-30
    • Williams, T.M.1
  • 78
    • 77956845478 scopus 로고    scopus 로고
    • Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning
    • C.K. Wong, I.W.H. Fung, and C.M. Tam Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning Journal of Construction Engineering and Management 136 10 2010 1116 1128
    • (2010) Journal of Construction Engineering and Management , vol.136 , Issue.10 , pp. 1116-1128
    • Wong, C.K.1    Fung, I.W.H.2    Tam, C.M.3
  • 79
    • 38149009704 scopus 로고    scopus 로고
    • Applying an ant colony optimization algorithm-based multiobjective approach for time-cost tradeoff
    • Y. Xiong, and Y. Kuang Applying an ant colony optimization algorithm-based multiobjective approach for time-cost tradeoff Journal of Construction Engineering and Management 134 2 2008 153 156
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.2 , pp. 153-156
    • Xiong, Y.1    Kuang, Y.2
  • 80
    • 34548513268 scopus 로고    scopus 로고
    • Ant colony optimization for disaster relief operations
    • DOI 10.1016/j.tre.2006.05.004, PII S136655450700021X, Challenges of Emergency Logistics Management
    • W. Yi, and A. Kumar Ant colony optimization for disaster relief operations Transportation Research Part E 43 2007 660 672 (Pubitemid 47371970)
    • (2007) Transportation Research Part E: Logistics and Transportation Review , vol.43 , Issue.6 , pp. 660-672
    • Yi, W.1    Kumar, A.2
  • 81
    • 33644584442 scopus 로고    scopus 로고
    • An colony optimization for the nonlinear resource allocation problem
    • P.-Y. Yin, and J.-Y. Wang An colony optimization for the nonlinear resource allocation problem Applied Mathematics and Computation 174 2006 1438 1453
    • (2006) Applied Mathematics and Computation , vol.174 , pp. 1438-1453
    • Yin, P.-Y.1    Wang, J.-Y.2
  • 82
    • 33845425531 scopus 로고    scopus 로고
    • A particle swarm optimization approach to the nonlinear resource allocation problem
    • DOI 10.1016/j.amc.2006.05.051, PII S0096300306005558
    • P.-Y. Yin, and J.-Y. Wang A particle swarm optimization approach to the nonlinear resource allocation problem Applied Mathematics and Computation 183 2006 232 242 (Pubitemid 44908603)
    • (2006) Applied Mathematics and Computation , vol.183 , Issue.1 , pp. 232-242
    • Yin, P.-Y.1    Wang, J.-Y.2
  • 83
    • 41249084562 scopus 로고    scopus 로고
    • Optimal multiple-objective resource allocation using hybrid particle swarm optimization and adaptive resource bounds technique
    • DOI 10.1016/j.cam.2007.04.018, PII S0377042707002191
    • P.-Y. Yin, and J.-Y. Wang Optimal multi-objective resource allocation using hybrid particle swarm optimization and adaptive resource bounds technique Journal of Computational and Applied Mathematics 216 2008 73 86 (Pubitemid 351446162)
    • (2008) Journal of Computational and Applied Mathematics , vol.216 , Issue.1 , pp. 73-86
    • Yin, P.-Y.1    Wang, J.-Y.2
  • 84
    • 70350070859 scopus 로고    scopus 로고
    • Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets
    • B. Zahraie, and M. Tavakolan Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets Journal of Construction Engineering and Management 135 11 2009 1162 1171
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.11 , pp. 1162-1171
    • Zahraie, B.1    Tavakolan, M.2
  • 85
    • 49749097235 scopus 로고    scopus 로고
    • Particle swarm optimization for construction site unequal-area layout
    • H. Zhang, and J.Y. Wang Particle swarm optimization for construction site unequal-area layout Journal of Construction Engineering and Management 134 9 2008 739 748
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.9 , pp. 739-748
    • Zhang, H.1    Wang, J.Y.2
  • 87
    • 2342615793 scopus 로고    scopus 로고
    • Applying a genetic algorithm-based multiobjective approach for time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2004)130:2(168)
    • D.X.M. Zheng, S.T. Ng, and M.M. Kumaraswamy Applying a genetic algorithm-based multiobjective approach for time-cost optimization Journal of Construction Engineering and Management 130 2 2004 168 176 (Pubitemid 40265383)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 168-176
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 88
    • 12344265028 scopus 로고    scopus 로고
    • Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2005)131:1(81)
    • D.X.M. Zheng, S.T. Ng, and M.M. Kumaraswamy Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization Journal of Construction Engineering and Management 131 1 2005 81 91 (Pubitemid 40135235)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 89
    • 2342444431 scopus 로고    scopus 로고
    • Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
    • DOI 10.1061/(ASCE)0887-3801(2002)16:2(143)
    • P.P. Zouein, H. Harmanani, and A. Hajar Genetic algorithm for solving site layout problem with unequal-size and constrained facilities Journal of Computing in Civil Engineering 16 2 2002 143 151 (Pubitemid 40475289)
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.2 , pp. 143-151
    • Zouein, P.P.1    Harmanani, H.2    Hajar, A.3
  • 90
    • 34249055671 scopus 로고    scopus 로고
    • Planning effort as an effective risk management tool
    • DOI 10.1016/j.jom.2006.12.001, PII S027269630600146X
    • O. Zwikael, and A. Sadeh Planning effort as an effective risk management tool Journal of Operations Management 25 2007 755 767 (Pubitemid 46779019)
    • (2007) Journal of Operations Management , vol.25 , Issue.4 , pp. 755-767
    • Zwikael, O.1    Sadeh, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.