메뉴 건너뛰기




Volumn , Issue , 2009, Pages 562-569

Dynamic simulation for assessment of impact of highway lane closure on traffic

Author keywords

Congestion; Delay; Highway; Lane closure; Reconstruction; Simulation

Indexed keywords

DECISION MAKING; HIGHWAY PLANNING; HIGHWAY SYSTEMS; IMAGE RECONSTRUCTION; MOTOR TRANSPORTATION; ROBOTICS;

EID: 79957475522     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.22260/isarc2009/0039     Document Type: Conference Paper
Times cited : (2)

References (16)
  • 2
    • 0033706814 scopus 로고    scopus 로고
    • Construction congestion cost (CO) basic model
    • Carr, R. I. (2000). "Construction congestion cost (CO) basic model." J. Construction Engineering and Management, 126(2), 105-113.
    • (2000) J. Construction Engineering and Management , vol.126 , Issue.2 , pp. 105-113
    • Carr, R.I.1
  • 3
    • 26444591620 scopus 로고    scopus 로고
    • Work zone lengths for a four-lane road with an alternate route
    • Chen, C., and Schonfeld, P. (2005). "Work zone lengths for a four-lane road with an alternate route." J. Transportation Engineering, 131(10), 780-789.
    • (2005) J. Transportation Engineering , vol.131 , Issue.10 , pp. 780-789
    • Chen, C.1    Schonfeld, P.2
  • 4
    • 0036500998 scopus 로고    scopus 로고
    • Optimizing work zones for two-lane highway maintenance projects
    • Chien, S., Tang, Y., and Schonfeld, P. (2002). "Optimizing work zones for two-lane highway maintenance projects." J. Transportation Engineering, 128(2), 145-155.
    • (2002) J. Transportation Engineering , vol.128 , Issue.2 , pp. 145-155
    • Chien, S.1    Tang, Y.2    Schonfeld, P.3
  • 5
    • 0023016963 scopus 로고
    • Some effects of traffic control on four-lane divided highways
    • Dudek, C. L., Richards, S. H., and Buffington, J.L. (1986). "Some effects of traffic control on four-lane divided highways." Transportation Res. Rec. 1086, 20-30.
    • (1986) Transportation Res. Rec. , vol.1086 , pp. 20-30
    • Dudek, C.L.1    Richards, S.H.2    Buffington, J.L.3
  • 7
    • 0029532894 scopus 로고
    • A+B bidding method - Hidden success story for highway construction
    • Herbsman, Z. J. (1995). "A+B bidding method - hidden success story for highway construction." J. Construction Engineering and Management, 121(4), 430-437.
    • (1995) J. Construction Engineering and Management , vol.121 , Issue.4 , pp. 430-437
    • Herbsman, Z.J.1
  • 8
    • 84863769649 scopus 로고
    • v 8.1
    • iseesystems Inc. (1985). Stella v 8.1 .
    • (1985) Stella
  • 9
    • 0029271414 scopus 로고
    • Incentive/distincentive guidelines for highway construction constracts
    • Jaraiedi, M., Plummer R. W., and Aber, M. S. (1995). "Incentive/ distincentive guidelines for highway construction constracts." J. Construction Engineering and Management, 121(1), 112-120.
    • (1995) J. Construction Engineering and Management , vol.121 , Issue.1 , pp. 112-120
    • Jaraiedi, M.1    Plummer, R.W.2    Aber, M.S.3
  • 10
    • 0028532417 scopus 로고
    • Updated capacity values for short-term freeway work zone lane closures
    • Transportation Research Board, Washington, D.C.
    • Krammes, R. A., and Lopez, G. O. (1994). "Updated capacity values for short-term freeway work zone lane closures." Proc., TRB 73rd Annual meeting, Transportation Research Board, Washington, D.C.
    • (1994) Proc., TRB 73rd Annual Meeting
    • Krammes, R.A.1    Lopez, G.O.2
  • 11
    • 0023382805 scopus 로고
    • Micor-computer tool for freeway work zone planning and scheduling
    • Krammes, R. A., Marsden, B. G., and Dudek, C. L. (1987). "Micor-computer tool for freeway work zone planning and scheduling." J. Transportation Engineering, 113(4). 348-356.
    • (1987) J. Transportation Engineering , vol.113 , Issue.4 , pp. 348-356
    • Krammes, R.A.1    Marsden, B.G.2    Dudek, C.L.3
  • 13
    • 0021692945 scopus 로고
    • Queue and cost evaluation of work zones (QUEWZ)
    • Washington, D.C.
    • Mammoth, J. L., and Dudek, C. L. (1984). "Queue and cost evaluation of work zones (QUEWZ)." Transportation Research Board, Washington, D.C., 12-19.
    • (1984) Transportation Research Board , pp. 12-19
    • Mammoth, J.L.1    Dudek, C.L.2
  • 14
    • 0002649857 scopus 로고    scopus 로고
    • Delay estimation and optimal length for four-lane divided freeway workzones
    • Martinelli, D. R., and Xu, D. (1996). "Delay estimation and optimal length for four-lane divided freeway workzones." J. Transportation Engineering, 122(2), 114-122.
    • (1996) J. Transportation Engineering , vol.122 , Issue.2 , pp. 114-122
    • Martinelli, D.R.1    Xu, D.2
  • 15
    • 0003678538 scopus 로고
    • Transportation Research Board. (TRB) Special Rep. No. 209, TRB, Washington, D.C.
    • Transportation Research Board. (TRB). (1985). Highway capacity manual, Special Rep. No. 209, TRB, Washington, D.C.
    • (1985) Highway Capacity Manual


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.