메뉴 건너뛰기




Volumn 1079, Issue , 1996, Pages 325-334

Resource-based vs. Task-based approaches for scheduling problems

Author keywords

[No Author keywords available]

Indexed keywords

INTELLIGENT SYSTEMS; SCHEDULING;

EID: 79956062955     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/3-540-61286-6_157     Document Type: Conference Paper
Times cited : (4)

References (26)
  • 1
    • 0020849266 scopus 로고
    • Maintaining Knowledge About Temporal Intervals
    • J. Allen, “Maintaining Knowledge About Temporal Intervals”, in Communications of the ACM, vol. 26, 1983, pp. 832-843.
    • (1983) Communications of the ACM , vol.26 , pp. 832-843
    • Allen, J.1
  • 2
    • 0020952544 scopus 로고
    • Planning using a Temporal World Model
    • J.F. Allen, J.A. Koomen, "Planning using a Temporal World Model", in Proc. of IJCAI83, 1983, pp. 741-747.
    • (1983) Proc. Of IJCAI83 , pp. 741-747
    • Allen, J.F.1    Koomen, J.A.2
  • 5
    • 0002785086 scopus 로고
    • Improved CLP Scheduling with Task Intervals
    • S. Margherita (IT)
    • Y. Casean, F. Laburthe, "Improved CLP Scheduling with Task Intervals" in ICLP94, pp 369-383, S. Margherita (IT), 1994.
    • (1994) ICLP94 , pp. 369-383
    • Casean, Y.1    Laburthe, F.2
  • 7
    • 0029292128 scopus 로고
    • On the computational complexity of querying bounds on differences constraints
    • V. Brusoni, L. Console, P. Terenziani, "On the computational complexity of querying bounds on differences constraints", in Artificial Intelligence, vol. 74, 1995, pp. 367-379.
    • (1995) Artificial Intelligence , vol.74 , pp. 367-379
    • Brusoni, V.1    Console, L.2    Terenziani, P.3
  • 13
    • 0010072075 scopus 로고
    • Why is Scheduling Difficult? A CSP Perspective
    • M.S. Fox, N. Sadeh, "Why is Scheduling Difficult? A CSP Perspective", in Proc. of ECAI 90, pp.754-67, 1990.
    • (1990) Proc. Of ECAI 90 , pp. 754-767
    • Fox, M.S.1    Sadeh, N.2
  • 17
    • 0002514541 scopus 로고
    • Algorithms for Constraint-Satisfaction Problems: A Survey
    • V. Kumar, "Algorithms for Constraint-Satisfaction Problems: A Survey", in The AI Magazine, vol. 13, 1992, pp. 32-44.
    • (1992) The AI Magazine , vol.13 , pp. 32-44
    • Kumar, V.1
  • 18
    • 84949750864 scopus 로고
    • A Meta Constraint Logic Programming Architecture for Qualitative and Quantitative Temporal Reasoning
    • E. Lamma, P. Mello, M. Milano, "A Meta Constraint Logic Programming Architecture for Qualitative and Quantitative Temporal Reasoning", Technical Report DEIS-LIA-95-001, 1995.
    • (1995) Technical Report DEIS-LIA-95-001
    • Lamma, E.1    Mello, P.2    Milano, M.3
  • 19
    • 0042859463 scopus 로고
    • Job-Shop, No-Wait in process with Blocking Models for the Ordering of Trains within Big Railway Stations", (In Italian)
    • Rome
    • A. Mascis, A. Sassano, "Job-Shop, No-Wait in process with Blocking Models for the Ordering of Trains within Big Railway Stations", (in Italian), 1st Nat. Conf. C.N.R. "Progetto Finalizzato Trasporti II', Vol. 4, pp. 2075-2094, Rome 1993.
    • (1993) 1St Nat. Conf. C.N.R. "Progetto Finalizzato Trasporti II' , vol.4 , pp. 2075-2094
    • Mascis, A.1    Sassano, A.2
  • 20
    • 0026105471 scopus 로고
    • LOGOS: A Constraint-Directed Reasoning Shell for Operations Management
    • C. Meng, M. Sullivan, "LOGOS: A Constraint-Directed Reasoning Shell for Operations Management", IEEE Expert 6, 1, pp.20-28, 1991.
    • (1991) IEEE Expert 6, 1 , pp. 20-28
    • Meng, C.1    Sullivan, M.2
  • 21
    • 84990628301 scopus 로고
    • Propagating Temporal Constraint for Scheduling
    • Philadelphia (PA), August
    • J.F. Rit, "Propagating Temporal Constraint for Scheduling", in Proc. AAAI86, Philadelphia (PA), pp.383-388, August 1986.
    • (1986) Proc. AAAI86 , pp. 383-388
    • Rit, J.F.1
  • 22
    • 58649108397 scopus 로고    scopus 로고
    • The Use of Multiple Problem Decomposition in Time Constrained Planning Tasks
    • S.F. Smith, P.S. Ow, "The Use of Multiple Problem Decomposition in Time Constrained Planning Tasks", in Proc. of IJCAI85, pp.1013-1015.
    • Proc. Of IJCAI85 , pp. 1013-1015
    • Smith, S.F.1    Ow, P.S.2
  • 23
    • 0346647286 scopus 로고
    • A Constraint-Based Framework for Reactive Management of Factory Schedules
    • M.D.Oliff, Ed., Benjamin Cummins Publisher
    • S.F. Smith, "A Constraint-Based Framework for Reactive Management of Factory Schedules" in Intelligent Manufacturing, M.D.Oliff, Ed., Benjamin Cummins Publisher, 1987.
    • (1987) Intelligent Manufacturing
    • Smith, S.F.1
  • 24
    • 0026936702 scopus 로고
    • Knowledge-based Production Management: Approaches, Results and Prospects
    • S.F. Smith, "Knowledge-based Production Management: Approaches, Results and Prospects", in Production Planning and Control Journal, 1992.
    • (1992) Production Planning and Control Journal
    • Smith, S.F.1
  • 26
    • 0028750404 scopus 로고
    • An Introduction to Least Commitment Planning
    • D.S. Weld, “An Introduction to Least Commitment Planning”, in AI Magazine, vol. 15, 1994, pp. 27-61.
    • (1994) AI Magazine , vol.15 , pp. 27-61
    • Weld, D.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.