-
1
-
-
50449102956
-
Estimation of critical clearing times using neural networks
-
Thesis Izzri?
-
Bettiol, A. L.; Souza, A.; Todesco, J. L.; & Tesch, J. R.; Jr. (2003). Estimation of critical clearing times using neural networks. In Proc. IEEE Bologna PowerTech conference. Thesis Izzri? (Vol. 3, p. 6).
-
(2003)
Proc. IEEE Bologna PowerTech Conference
, vol.3
, pp. 6
-
-
Bettiol, A.L.1
Souza, A.2
Todesco, J.L.3
Tesch Jr., J.R.4
-
2
-
-
0026188751
-
Learning vector quantization for the probabilistic neural network
-
DOI 10.1109/72.88165
-
P. Burrascano Learning vector quantization for the probabilistic neural network IEEE Transactions on Neural Networks 2 4 1991 458 461 (Pubitemid 21662075)
-
(1991)
IEEE Transactions on Neural Networks
, vol.2
, Issue.4
, pp. 458-461
-
-
Burrascano Pietro1
-
6
-
-
2542625918
-
Support vector machines for transient stability analysis of large-scale power systems
-
L.S. Moulin, A.P.A. da Silva, M.A. El-Sharkawi, and R.J. Marks Support vector machines for transient stability analysis of large-scale power systems IEEE Transactions on Power Systems 19 2 2004 818 825
-
(2004)
IEEE Transactions on Power Systems
, vol.19
, Issue.2
, pp. 818-825
-
-
Moulin, L.S.1
Da Silva, A.P.A.2
El-Sharkawi, M.A.3
Marks, R.J.4
-
7
-
-
84975529148
-
A methodology based on neural networks for the determination of the critical clearing time of power systems transient stability
-
Paucar, V.L.; & Fernandes, F.C. (2002). A methodology based on neural networks for the determination of the critical clearing time of power systems transient stability. In International conference on power system technology (Vol. 4, pp. 2669-2673).
-
(2002)
International Conference on Power System Technology
, vol.4
, pp. 2669-2673
-
-
Paucar, V.L.1
Fernandes, F.C.2
-
8
-
-
0032180382
-
Power system transient stability assessment - Traditional vs modern methods
-
PII S0967066198000732
-
M. Pavella Power system transient stability assessment - Traditional vs modern methods Control Engineering Practice 6 10 1998 1233 1246 (Pubitemid 128384997)
-
(1998)
Control Engineering Practice
, vol.6
, Issue.10
, pp. 1233-1246
-
-
Pavella, M.1
-
9
-
-
33748634082
-
The anatomy of a power grid blackout - Root causes and dynamics of recent major blackouts
-
P. Pourbeik, P.S. Kundur, and C.W. Taylor The anatomy of a power grid blackout - Root causes and dynamics of recent major blackouts IEEE Power and Energy Magazine 4 5 2006 22 29
-
(2006)
IEEE Power and Energy Magazine
, vol.4
, Issue.5
, pp. 22-29
-
-
Pourbeik, P.1
Kundur, P.S.2
Taylor, C.W.3
-
11
-
-
67650430240
-
Investigation of power system transient stability using clustering based support vector machines and preventive control by rescheduling generators
-
B.D.A. Selvi, and N. Kamaraj Investigation of power system transient stability using clustering based support vector machines and preventive control by rescheduling generators International Conference on Information and Communication Technology in Electrical Sciences 12 2007 137 142
-
(2007)
International Conference on Information and Communication Technology in Electrical Sciences
, vol.12
, pp. 137-142
-
-
Selvi, B.D.A.1
Kamaraj, N.2
-
13
-
-
84861496291
-
Transient stability analysis of electrical power systems using a neural network based on fuzzy ARTMAP
-
Silveira, M. C. G.; Lotufo, A. D. P.; & Minussi, C. R. (2003). Transient stability analysis of electrical power systems using a neural network based on fuzzy ARTMAP. In Proc. IEEE Bologna PowerTech conference (Vol. 3, p. 7).
-
(2003)
Proc. IEEE Bologna PowerTech Conference
, vol.3
, pp. 7
-
-
Silveira, M.C.G.1
Lotufo, A.D.P.2
Minussi, C.R.3
-
15
-
-
33744933446
-
V-SVM for transient stability assessment in power systems
-
1452085, Proceedings - 2005 International Symposium on Autonomous Decentralized Systems, ISADS 2005
-
X. Wang, S. Wu, Q. Li, and X. Wang v-SVM for transient stability assessment in power systems Proceedings of Autonomous Decentralized Systems 2005 356 363 (Pubitemid 43841328)
-
(2005)
Proceedings - 2005 International Symposium on Autonomous Decentralized Systems, ISADS 2005
, vol.2005
, pp. 356-363
-
-
Wang, X.1
Wu, S.2
Li, Q.3
Wang, X.4
|