메뉴 건너뛰기




Volumn 35, Issue 9, 2011, Pages 4295-4303

Reliability analysis of a warm standby repairable system with priority in use

Author keywords

Markov process; MTTFF; Priority; Reliability; Steady state system availability; Warm standby system

Indexed keywords

AS GOOD AS NEW; MTTFF; NUMERICAL EXAMPLE; PRIORITY; RELIABILITY INDEX; STEADY STATE SYSTEMS; THEORETICAL RESULT; TIME DISTRIBUTION; TRANSFER SWITCHES; WARM STANDBY REPAIRABLE SYSTEM; WARM STANDBY SYSTEM; WHOLE SYSTEMS; WORKING TIME;

EID: 79955576849     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2011.03.002     Document Type: Article
Times cited : (88)

References (26)
  • 3
    • 0000115133 scopus 로고
    • Geometric processes and replacement problem
    • Lam Y. Geometric processes and replacement problem. Acta Mathematica Applied Sinica 1988, 4(4):366-377.
    • (1988) Acta Mathematica Applied Sinica , vol.4 , Issue.4 , pp. 366-377
    • Lam, Y.1
  • 4
    • 0000665117 scopus 로고
    • A note on the optimal replacement problem
    • Lam Y. A note on the optimal replacement problem. Advances in Applied Probability 1988, 20:479-482.
    • (1988) Advances in Applied Probability , vol.20 , pp. 479-482
    • Lam, Y.1
  • 5
    • 0036599926 scopus 로고    scopus 로고
    • A geometric-process repair-model with good-as-new preventive repair
    • Zhang Y.L. A geometric-process repair-model with good-as-new preventive repair. IEEE Transactions on Reliability 2002, R-51(2):223-228.
    • (2002) IEEE Transactions on Reliability , vol.R-51 , Issue.2 , pp. 223-228
    • Zhang, Y.L.1
  • 6
    • 0027559419 scopus 로고
    • On geometric processes and repair replacement problems
    • Stanley A.D.J. On geometric processes and repair replacement problems. Microelectronics Reliability 1993, 33:489-491.
    • (1993) Microelectronics Reliability , vol.33 , pp. 489-491
    • Stanley, A.D.J.1
  • 8
    • 34249071322 scopus 로고    scopus 로고
    • A deteriorating cold standby repairable system with priority in use
    • Zhang Y.L., Wang G.J. A deteriorating cold standby repairable system with priority in use. European Journal of Operational Research 2007, 183:278-295.
    • (2007) European Journal of Operational Research , vol.183 , pp. 278-295
    • Zhang, Y.L.1    Wang, G.J.2
  • 9
    • 77952884912 scopus 로고    scopus 로고
    • Probabilistic analysis of a series-parallel repairable system with three units and vacation
    • Hu L., Yue D., Li J. Probabilistic analysis of a series-parallel repairable system with three units and vacation. Applied Mathematical Modelling 2010, 34:2711-2721.
    • (2010) Applied Mathematical Modelling , vol.34 , pp. 2711-2721
    • Hu, L.1    Yue, D.2    Li, J.3
  • 13
    • 22444449190 scopus 로고    scopus 로고
    • Optimal maintenance policies under different operational schedules
    • Wu S., Clements-Croome D. Optimal maintenance policies under different operational schedules. IE EE Transactions on Reliability 2005, 54:38-346.
    • (2005) IE EE Transactions on Reliability , vol.54 , pp. 38-346
    • Wu, S.1    Clements-Croome, D.2
  • 14
    • 34249071322 scopus 로고    scopus 로고
    • A deteriorating cold standby repairable system with priority in use
    • Zhang Y.L., Wang G.J. A deteriorating cold standby repairable system with priority in use. European J. Oper. Res. 2007, 183:278-295.
    • (2007) European J. Oper. Res. , vol.183 , pp. 278-295
    • Zhang, Y.L.1    Wang, G.J.2
  • 15
    • 0036599926 scopus 로고    scopus 로고
    • A geometric process repair model with good-as-new preventive repair
    • Zhang Y.L. A geometric process repair model with good-as-new preventive repair. IEEE Transactions on Reliability 2002, 51(2):223-228.
    • (2002) IEEE Transactions on Reliability , vol.51 , Issue.2 , pp. 223-228
    • Zhang, Y.L.1
  • 16
    • 0016521773 scopus 로고
    • Stochastic behavior of a two-unit priority standby redundant system with repair
    • Nakagawa T., Osaki S. Stochastic behavior of a two-unit priority standby redundant system with repair. Microelectronics Reliability 1975, 14(3):309-313.
    • (1975) Microelectronics Reliability , vol.14 , Issue.3 , pp. 309-313
    • Nakagawa, T.1    Osaki, S.2
  • 17
    • 0024878188 scopus 로고
    • Economic analysis of the M/M/R machine repair problem with warm standbys
    • Sivazlian B.D., Wang K.H. Economic analysis of the M/M/R machine repair problem with warm standbys. Microelectronics and Reliability 1989, 29:25-35.
    • (1989) Microelectronics and Reliability , vol.29 , pp. 25-35
    • Sivazlian, B.D.1    Wang, K.H.2
  • 18
    • 33748288041 scopus 로고    scopus 로고
    • Profit analysis of the M/M/R machine repair problem with balking, reneging, and standby switching failures
    • Wang K.H., Ke J.B., Ke J.C. Profit analysis of the M/M/R machine repair problem with balking, reneging, and standby switching failures. Computers and Operations Research 2007, 34(3):835-847.
    • (2007) Computers and Operations Research , vol.34 , Issue.3 , pp. 835-847
    • Wang, K.H.1    Ke, J.B.2    Ke, J.C.3
  • 20
    • 33646578762 scopus 로고    scopus 로고
    • Reliability analysis of a three unit warm standby redundant system with repair
    • Springer
    • Srinivasan S.K., Subramanian R. Reliability analysis of a three unit warm standby redundant system with repair. Ann Oper Res 2006, Vol. 143:227-235. Springer.
    • (2006) Ann Oper Res , vol.143 , pp. 227-235
    • Srinivasan, S.K.1    Subramanian, R.2
  • 21
    • 0037399876 scopus 로고    scopus 로고
    • Probabilistic analysis of a repairable system with warm standbys plus balking and reneging
    • Wang K.H., Ke J.C. Probabilistic analysis of a repairable system with warm standbys plus balking and reneging. Applied mathematical Modelling 2003, 27:327-336.
    • (2003) Applied mathematical Modelling , vol.27 , pp. 327-336
    • Wang, K.H.1    Ke, J.C.2
  • 22
    • 38349119138 scopus 로고    scopus 로고
    • Performance modeling of state dependent system with mixed standbys and two modes of failure
    • Jain M., Sharma G.C., Sharma R. Performance modeling of state dependent system with mixed standbys and two modes of failure. Applied Mathematical Modelling 2008, 32:712-724.
    • (2008) Applied Mathematical Modelling , vol.32 , pp. 712-724
    • Jain, M.1    Sharma, G.C.2    Sharma, R.3
  • 26
    • 78651295789 scopus 로고    scopus 로고
    • A deteriorating system with its repairman having multiple vacations
    • Yuan L., Xu J. A deteriorating system with its repairman having multiple vacations. Applied Mathematics and Computation 2011, 217:4980-4989.
    • (2011) Applied Mathematics and Computation , vol.217 , pp. 4980-4989
    • Yuan, L.1    Xu, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.