메뉴 건너뛰기




Volumn 26, Issue 2, 2011, Pages 766-774

Long-term reserve expansion of power systems with high wind power penetration using universal generating function methods

Author keywords

Reliability; reserve expansion; universal generating function; wind penetration; wind power generation

Indexed keywords

EXPANSION METHODS; HIGH WINDS; LONG TERM PLANNING; POWER OUT PUT; POWER SYSTEMS; RELIABILITY MODEL; RESERVE EXPANSION; SYSTEM PLANNING; SYSTEM RELIABILITY; TRANSMISSION NETWORKS; UNIVERSAL GENERATING FUNCTION; UNIVERSAL GENERATING FUNCTIONS; WIND FARM; WIND PENETRATION; WIND SPEED; WIND TURBINE GENERATORS;

EID: 79955535675     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2010.2054841     Document Type: Article
Times cited : (143)

References (36)
  • 2
  • 3
    • 79955525832 scopus 로고    scopus 로고
    • [Online]. Available
    • Ecoworld. [Online]. Available: http://ecoworld.com/features/2006/07/15/ wind-power-in-china/.
    • Ecoworld
  • 4
    • 43849089442 scopus 로고    scopus 로고
    • Stochastic security for operations planning with significant wind power generation
    • DOI 10.1109/TPWRS.2008.919318
    • F. Bouffard and F. D. Galiana, "Stochastic security for operations planning with significant wind power generation," IEEE Trans. Power Syst., vol. 23, no. 2, pp. 306-316, May 2008. (Pubitemid 351695808)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 306-316
    • Bouffard, F.1    Galiana, F.D.2
  • 5
    • 27744435546 scopus 로고    scopus 로고
    • Scheduling and pricing of coupled energy and primary, secondary and tertiary reserves
    • Nov.
    • F. D. Galiana, F. Bouffard, J. M. Arroyo, and J. F. Restrepo, "Scheduling and pricing of coupled energy and primary, secondary and tertiary reserves," Proc. IEEE, vol. 93, no. 11, pp. 1970-1983, Nov. 2005.
    • (2005) Proc. IEEE , vol.93 , Issue.11 , pp. 1970-1983
    • Galiana, F.D.1    Bouffard, F.2    Arroyo, J.M.3    Restrepo, J.F.4
  • 6
    • 0019544071 scopus 로고
    • Load-following and spinning-reserve penalties for intermittent generation
    • Mar.
    • S. T. Lee and Z. A. Yamayee, "Load-following and spinning-reserve penalties for intermittent generation," IEEE Trans. Power App. Syst., vol. PAS-100, no. 3, pp. 1203-1211, Mar. 1981.
    • (1981) IEEE Trans. Power App. Syst. , vol.PAS-100 , Issue.3 , pp. 1203-1211
    • Lee, S.T.1    Yamayee, Z.A.2
  • 9
    • 0027594442 scopus 로고
    • Reserve margin planning in a wind-hydro-thermal power system
    • May
    • L. Söder, "Reserve margin planning in a wind-hydro-thermal power system," IEEE Trans. Power Syst., vol. 8, no. 2, pp. 564-571, May 1993.
    • (1993) IEEE Trans. Power Syst. , vol.8 , Issue.2 , pp. 564-571
    • Söder, L.1
  • 10
    • 0035370675 scopus 로고    scopus 로고
    • Reliability benefit analysis of adding WTG in a distribution system
    • Jun.
    • P. Wang and R. Billinton, "Reliability benefit analysis of adding WTG in a distribution system," IEEE Trans. Energy Convers., vol. 16, no. 2, pp. 134-140, Jun. 2001.
    • (2001) IEEE Trans. Energy Convers. , vol.16 , Issue.2 , pp. 134-140
    • Wang, P.1    Billinton, R.2
  • 11
    • 0035391521 scopus 로고    scopus 로고
    • Time-sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as alternative supply
    • DOI 10.1049/ip-gtd:20010406
    • P. Wang and R. Billinton, "Time sequential simulation technique for rural distribution system reliability cost/worth evaluation including wind generation as an alternative supply," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 148, no. 4, pp. 355-360, Jul. 2001. (Pubitemid 32720242)
    • (2001) IEE Proceedings: Generation, Transmission and Distribution , vol.148 , Issue.4 , pp. 355-360
    • Wang, P.1    Billinton, R.2
  • 12
    • 33947126953 scopus 로고    scopus 로고
    • Renewable energy credit driven wind power growth for system reliability
    • DOI 10.1016/j.epsr.2006.07.004, PII S0378779606001593
    • R. Karki, "Renewable energy credit driven wind power growth for systemreliability," Elect. PowerSyst. Res., vol. 77, pp. 797-803, 2007. (Pubitemid 46401115)
    • (2007) Electric Power Systems Research , vol.77 , Issue.7 , pp. 797-803
    • Karki, R.1
  • 13
    • 2942539553 scopus 로고    scopus 로고
    • Cost-effective wind energy utilization for reliable power supply
    • Jun.
    • R. Karki and R. Billinton, "Cost-effective wind energy utilization for reliable power supply," IEEE Trans. Energy Convers., vol. 19, no. 2, pp. 435-440, Jun. 2004.
    • (2004) IEEE Trans. Energy Convers. , vol.19 , Issue.2 , pp. 435-440
    • Karki, R.1    Billinton, R.2
  • 14
    • 4544255264 scopus 로고    scopus 로고
    • Generating capacity adequacy associated with wind energy
    • Sep.
    • R. Billinton and G. Bai, "Generating capacity adequacy associated with wind energy," IEEE Trans. Energy Convers, vol. 19, no. 3, pp. 641-646, Sep. 2004.
    • (2004) IEEE Trans. Energy Convers , vol.19 , Issue.3 , pp. 641-646
    • Billinton, R.1    Bai, G.2
  • 15
    • 0021388829 scopus 로고
    • Reliability modeling of large wind farms and electric utility interface systems
    • X. Wang, H. Dai, and R. J. Thomas, "Reliability modeling of large wind farms and electric utility interface systems," IEEE Trans. Power App. Syst., vol. PAS-103, no. 3, pp. 569-575, Mar. 1984. (Pubitemid 14528772)
    • (1984) IEEE transactions on power apparatus and systems , vol.PAS-103 , Issue.3 , pp. 569-575
    • Xifan Wang1    Hui-Zhu Dai2    Thomas, R.J.3
  • 16
    • 0026368699 scopus 로고
    • An approach to assess the performance of utility-interactive wind electric conversion systems
    • Dec.
    • I. Abouzahr and R. Ramakumar, "An approach to assess the performance of utility-interactive wind electric conversion systems," IEEE Trans. Energy Convers., vol. 6, no. 4, pp. 627-638, Dec. 1991.
    • (1991) IEEE Trans. Energy Convers. , vol.6 , Issue.4 , pp. 627-638
    • Abouzahr, I.1    Ramakumar, R.2
  • 17
    • 0030241740 scopus 로고    scopus 로고
    • Time-series models for reliability evaluation of power systems including wind energy
    • DOI 10.1016/0026-2714(95)00154-9
    • R. Billinton, H. Chen, and R. Ghajar, "Time-series models for reliability evaluation of power systems including wind energy," Microelectron. Reliab., vol. 36, no. 9, pp. 1253-1261, 1996. (Pubitemid 126378823)
    • (1996) Microelectronics Reliability , vol.36 , Issue.9 , pp. 1253-1261
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 18
    • 0035507009 scopus 로고    scopus 로고
    • Capacity expansion of small isolated power systems using PV and wind energy
    • DOI 10.1109/59.962442, PII S0885895001088782
    • R. Billinton and R. Karki, "Capacity expansion of small isolated power systems using PV and wind energy," IEEE Trans. PowerSyst., vol. 16, no. 4, pp. 892-897, Nov. 2001. (Pubitemid 33106142)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.4 , pp. 892-897
    • Billinton, R.1    Karki, R.2
  • 19
    • 33744522630 scopus 로고    scopus 로고
    • A simplified wind power generation model for reliability evaluation
    • DOI 10.1109/TEC.2006.874233
    • R. Karki, P. Hu, and R. Billinton, "A simplified wind power generation model for reliability evaluation," IEEE Trans. Energy Convers., vol. 21, no. 2, pp. 533-540, Jun. 2006. (Pubitemid 43811297)
    • (2006) IEEE Transactions on Energy Conversion , vol.21 , Issue.2 , pp. 533-540
    • Karki, R.1    Hu, P.2    Billinton, R.3
  • 22
    • 33645230796 scopus 로고    scopus 로고
    • Optimal reserve management forrestructuredpower generating systems
    • Jul.
    • Y. Ding, P. Wang, and A. Lisnianski, "Optimal reserve management forrestructuredpower generating systems,"Reliab. Eng. Syst. Saf., vol. 91, no. 7, pp. 792-799, Jul. 2006.
    • (2006) Reliab. Eng. Syst. Saf. , vol.91 , Issue.7 , pp. 792-799
    • Ding, Y.1    Wang, P.2    Lisnianski, A.3
  • 23
    • 0020497503 scopus 로고
    • Development of a new procedure for reliability modeling of wind turbine generators
    • P. Giorsetto and K. F. Utsurogi, "Development of a new procedure for reliability modeling of wind turbine generators," IEEE Trans. Power App. Syst., vol. PAS-102, no. 1, pp. 134-143, Jan. 1983. (Pubitemid 13493658)
    • (1983) IEEE transactions on power apparatus and systems , vol.PAS-102 , Issue.1 , pp. 134-143
    • Giorsetto Paul1    Utsurogi Kent, F.2
  • 25
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • Reliability Test System Task Force of the Application of Probability Methods Subcommittee Nov./Dec.
    • Reliability Test System Task Force of the Application of Probability Methods Subcommittee, "IEEE reliability test system," IEEE Trans. Power App. Syst., vol. PAS-98, no. 6, pp. 2047-2054, Nov./Dec. 1979.
    • (1979) IEEE Trans. Power App. Syst. , vol.PAS-98 , Issue.6 , pp. 2047-2054
  • 26
    • 84868614082 scopus 로고
    • Effective load carrying capability of generating units
    • L. L. Garver, "Effective load carrying capability of generating units," IEEE Trans. Power App. Syst., vol. PAS-85, no. 8, pp. 910-919, 1966.
    • (1966) IEEE Trans. Power App. Syst. , vol.PAS-85 , Issue.8 , pp. 910-919
    • Garver, L.L.1
  • 29
    • 44349111315 scopus 로고    scopus 로고
    • Noniterative method to approximate the effective load carrying capability of a wind plant
    • DOI 10.1109/TEC.2008.918597
    • C. D'Annunzio and S. Santoso, "Noniterative method to approximate the effective load carrying capability of a wind plant," IEEE Trans. Energy Convers., vol. 23, no. 2, pp. 544-550, Jun. 2008. (Pubitemid 351728795)
    • (2008) IEEE Transactions on Energy Conversion , vol.23 , Issue.2 , pp. 544-550
    • D'Annunzio, C.1    Santoso, S.2
  • 30
    • 32144454703 scopus 로고    scopus 로고
    • Reliability and price risk assessment of a restructured power system with hybrid market structure
    • DOI 10.1109/TPWRS.2005.857835
    • Y. Ding and P. Wang, "Reliability and price risk assessment of a restructured power system with hybrid market structure," IEEE Trans. Power Syst., vol. 21, no. 1, pp. 108-116, Feb. 2006. (Pubitemid 43204709)
    • (2006) IEEE Transactions on Power Systems , vol.21 , Issue.1 , pp. 108-116
    • Ding, Y.1    Wang, P.2
  • 31
    • 19944391385 scopus 로고    scopus 로고
    • Technique to evaluate nodal reliability indices and nodal prices of restructured power systems
    • DOI 10.1049/ip-gtd:20041250
    • P. Wang, Y. Ding, and Y. Xiao, "Technique to evaluate nodal reliability indices and nodal prices of restructured power systems," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 152, no. 3, pp. 390-396, May 2005. (Pubitemid 40751389)
    • (2005) IEE Proceedings: Generation, Transmission and Distribution , vol.152 , Issue.3 , pp. 390-396
    • Wang, P.1    Ding, Y.2    Xiao, Y.3
  • 32
    • 33947319093 scopus 로고    scopus 로고
    • Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment
    • DOI 10.1109/TEC.2006.875475
    • W. Wangdee and R. Billinton, "Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment," IEEE Trans. Energy Convers., vol. 21, no. 3, pp. 734-741, Sep. 2006. (Pubitemid 46445162)
    • (2006) IEEE Transactions on Energy Conversion , vol.21 , Issue.3 , pp. 734-741
    • Wangdee, W.1    Billinton, R.2
  • 33
    • 71849084961 scopus 로고    scopus 로고
    • A conceptual study on reliability constrained transmission system planning including wind power
    • L. Wang and C. Singh, "A conceptual study on reliability constrained transmission system planning including wind power," in Proc. IEEE Power & Energy Soc. General Meeting, 2009.
    • (2009) Proc. IEEE Power & Energy Soc. General Meeting
    • Wang, L.1    Singh, C.2
  • 34
    • 43849102832 scopus 로고    scopus 로고
    • Power system risk assessment using a hybrid method of fuzzy set and Monte Carlo simulation
    • DOI 10.1109/TPWRS.2008.919201
    • W. Li, J. Zhou, K. Xie, and X. Xiong, "Power system risk assessment using a hybrid method of fuzzy set and Monte Carlo simulation," IEEE Trans. Power Syst., vol. 23, no. 2, pp. 336-343, May 2008. (Pubitemid 351695811)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 336-343
    • Li, W.1    Zhou, J.2    Xie, K.3    Xiong, X.4
  • 35
    • 57749171830 scopus 로고    scopus 로고
    • Fuzzy multi-state system: General definition and performance assessment
    • Dec.
    • Y. Ding, M. J. Zuo, A. Lisnianski, and Z. G. Tian, "Fuzzy multi-state system: General definition and performance assessment," IEEE Trans. Reliab., vol. 57, no. 4, pp. 589-594, Dec. 2008.
    • (2008) IEEE Trans. Reliab. , vol.57 , Issue.4 , pp. 589-594
    • Ding, Y.1    Zuo, M.J.2    Lisnianski, A.3    Tian, Z.G.4
  • 36
    • 36049046129 scopus 로고    scopus 로고
    • Fuzzy universal generating functions for multi-state system reliability assessment
    • DOI 10.1016/j.fss.2007.06.004, PII S0165011407002692
    • Y. Ding and A. Lisnianski, "Fuzzy universal generating functions for multi-state system reliability assessment," Fuzzy Sets Syst., vol. 159, no. 3, pp. 307-324, Feb. 2008. (Pubitemid 350086689)
    • (2008) Fuzzy Sets and Systems , vol.159 , Issue.3 , pp. 307-324
    • Ding, Y.1    Lisnianski, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.