|
Volumn 96, Issue 7, 2011, Pages 775-784
|
New methods to determine the importance measures of initiating and enabling events in fault tree analysis
|
Author keywords
Enabling events; Fault tree analysis; Importance measures; Initiating events; Non coherent fault trees
|
Indexed keywords
CALCULATION METHODS;
DESIGN IMPROVEMENTS;
ENABLING EVENTS;
EXACT METHODS;
EXPECTED NUMBER OF FAILURES;
FAILURE DIAGNOSIS;
FAILURE FREQUENCY;
FAULT-TREES;
IMPORTANCE MEASURE;
IMPORTANCE MEASURES;
INITIATING EVENTS;
NON-COHERENT FAULT TREES;
SYSTEM FAILURES;
UPPER BOUND;
BINARY TREES;
FAULT TREE ANALYSIS;
LARGE SCALE SYSTEMS;
RELIABILITY ANALYSIS;
QUALITY ASSURANCE;
|
EID: 79955522171
PISSN: 09518320
EISSN: None
Source Type: Journal
DOI: 10.1016/j.ress.2011.02.001 Document Type: Article |
Times cited : (24)
|
References (16)
|