메뉴 건너뛰기




Volumn 38, Issue 7-8, 2004, Pages 773-795

Difficulties connected to the integration of resource management in operations management;Difficultés liées à l'intégration de la gestion des ressources dans le pilotage des opérations

Author keywords

Energy; Human resource; Integration; Operation management; Scheduling

Indexed keywords

INTEGER PROGRAMMING; INTEGRATION; PERSONNEL; SCHEDULING;

EID: 79955405332     PISSN: 12696935     EISSN: None     Source Type: Journal    
DOI: 10.3166/jesa.38.773-795     Document Type: Article
Times cited : (3)

References (23)
  • 1
    • 0017547182 scopus 로고
    • Workforce scheduling with cyclic demands and day-off constraints
    • Baker K. R. and Magazine M. J., "Workforce scheduling with cyclic demands and day-off constraints", Management Science, vol. 24, no 2, 1977, p. 161-167.
    • (1977) Management Science , vol.24 , Issue.2 , pp. 161-167
    • Baker, K.R.1    Magazine, M.J.2
  • 2
    • 0016091890 scopus 로고
    • Scheduling a full-time workforce to meet cyclic staffing requirements
    • Baker K. R., "Scheduling a full-time workforce to meet cyclic staffing requirements", Management Sciences, vol. 20, no 12, 1974, p. 1561-1568.
    • (1974) Management Sciences , vol.20 , Issue.12 , pp. 1561-1568
    • Baker, K.R.1
  • 3
    • 0041686582 scopus 로고    scopus 로고
    • L'implication des contraintes sur la capacité en ressources humaines sur l'ordonnancement et la gestion de production
    • Baptiste P., Kane H., Barakat O., « L'implication des contraintes sur la capacité en ressources humaines sur l'ordonnancement et la gestion de production », Journal européen des systèmes automatisés, vol. 34, no 2-3, 2000, p. 195-209.
    • (2000) Journal Européen des Systèmes Automatisés , vol.34 , Issue.2-3 , pp. 195-209
    • Baptiste, P.1    Kane, H.2    Barakat, O.3
  • 5
    • 0141749146 scopus 로고    scopus 로고
    • Total-site scheduling for better energy utilization
    • Cheung K.-Y., Hui C.-W., "Total-site scheduling for better energy utilization", Journal of Cleaner Production, vol. 12, no 2, 2004, p. 171-184.
    • (2004) Journal of Cleaner Production , vol.12 , Issue.2 , pp. 171-184
    • Cheung, K.-Y.1    Hui, C.-W.2
  • 7
    • 0036041229 scopus 로고    scopus 로고
    • An application of expert system for demand side management
    • El-Sebeay N., Yousef M. T., El-Alayly A. A., "An application of expert system for demand side management", Power System Management and Control Conference Publication no. 488, IEE, 2002, p. 228-232. (Pubitemid 35004496)
    • (2002) IEE Conference Publication , Issue.488 , pp. 228-232
    • El-Sebaey, N.1    Yousef, M.T.2    El-Alayly, A.A.3
  • 8
    • 0022026652 scopus 로고
    • WORK-FORCE SCHEDULING WITH CYCLIC REQUIREMENTS AND CONSTRAINTS ON DAYS OFF, WEEKENDS OFF, AND WORK STRETCH.
    • Emmons H., "Workforce scheduling with cyclic requirements and constraints on days-off and work stretch", IIE Transactions, vol. 17, no 1, 1985, p. 8-16. (Pubitemid 15524727)
    • (1985) IIE Transactions (Institute of Industrial Engineers) , vol.17 , Issue.1 , pp. 8-16
    • Emmons Hamilton1
  • 10
    • 0030212185 scopus 로고    scopus 로고
    • Scheduling research in multiple resource constrained job shops: A review and critique
    • Gargeya V. B., Deane R. H, "Scheduling research in multiple resource constrained job shops: A review and critique", International Journal of Production Research, vol. 34, no 8, 1996, p. 2077-2097. (Pubitemid 126525287)
    • (1996) International Journal of Production Research , vol.34 , Issue.8 , pp. 2077-2097
    • Gargeya, V.B.1    Deane, R.H.2
  • 11
    • 0032624548 scopus 로고    scopus 로고
    • Scheduling a workforce under annualized hours
    • Hung R., "Scheduling a workforce under annualized hours", International Journal of Production Research, vol. 37, no 11, 1999, p. 2419-2427.
    • (1999) International Journal of Production Research , vol.37 , Issue.11 , pp. 2419-2427
    • Hung, R.1
  • 12
    • 0030190193 scopus 로고    scopus 로고
    • Scheduling preventive overtime: A new approach for the automotive industry
    • Inman R. R., "Scheduling preventive overtime : a new approach for the automative industry", IEEE Transactions, vol. 28, no 7, 1996, p. 555-565. (Pubitemid 126760591)
    • (1996) IIE Transactions (Institute of Industrial Engineers) , vol.28 , Issue.7 , pp. 555-565
    • Inman, R.R.1
  • 13
    • 0041686582 scopus 로고    scopus 로고
    • Analyse et aménagement du temps de travail : Cas des heures supplémentaires et de l'intérim
    • Kane H., Baptiste P., Barakat O., « Analyse et aménagement du temps de travail : cas des heures supplémentaires et de l'intérim », Journal européen des systèmes automatisés, vol. 34, no 2-3, 2000, p. 195-209.
    • (2000) Journal Européen des Systèmes Automatisés , vol.34 , Issue.2-3 , pp. 195-209
    • Kane, H.1    Baptiste, P.2    Barakat, O.3
  • 14
    • 0031699840 scopus 로고    scopus 로고
    • Scheduling a Single Batch Processing Machine with Secondary Resource Constraints
    • Kempf K. G., Uzsoy R., Wang C.-S., "Scheduling a single batch processing machine with secondary resource constraints", Journal of Manufacturing Systems, vol. 17, no 1, 1998, p. 37-51. (Pubitemid 128447045)
    • (1998) Journal of Manufacturing Systems , vol.17 , Issue.1 , pp. 37-51
    • Kempf, K.G.1    Uzsoy, R.2    Wang, C.-S.3
  • 15
    • 0036885225 scopus 로고    scopus 로고
    • A material and energy flow model for co-production of heat and power
    • Kornohen J., "A material and energy flow model for co-production of heat and power", Journal of Cleaner Production, vol. 10, 2002, p. 537-544.
    • (2002) Journal of Cleaner Production , vol.10 , pp. 537-544
    • Kornohen, J.1
  • 16
    • 0141749146 scopus 로고    scopus 로고
    • Total-site scheduling for better energy utilization
    • Kwok-Yuen C., Chi-Wai H., "Total-site scheduling for better energy utilization", Journal of Cleaner Production, vol. 12, 2004, p. 171-184.
    • (2004) Journal of Cleaner Production , vol.12 , pp. 171-184
    • Kwok-Yuen, C.1    Chi-Wai, H.2
  • 17
    • 37349110993 scopus 로고
    • Annual hours: An idea whose time has come
    • November
    • Lynch P., "Annual hours: an idea whose time has come", Personnel Management, November 1985, p. 46-50.
    • (1985) Personnel Management , pp. 46-50
    • Lynch, P.1
  • 19
    • 33846034570 scopus 로고    scopus 로고
    • Managing green productivity: A case study
    • Mohanty R. P., Deshmukh S. G., "Managing green productivity: a case study", Work Study, vol. 48, no 5, 1999, p. 165-169.
    • (1999) Work Study , vol.48 , Issue.5 , pp. 165-169
    • Mohanty, R.P.1    Deshmukh, S.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.