메뉴 건너뛰기




Volumn 1, Issue 1, 2009, Pages 141-148

Analysis of a process to capture the CO2 resulting from the pre-calcination of the limestone feed to a cement plant

Author keywords

Calcination; Cement plant; CO2 capture

Indexed keywords

CALCINERS; CAPTURE SYSTEM; CIRCULATING FLUIDIZED BED COMBUSTOR; CO2 CAPTURE; PRE-CALCINATION;

EID: 79955384710     PISSN: None     EISSN: 18766102     Source Type: Conference Proceeding    
DOI: 10.1016/j.egypro.2009.01.021     Document Type: Conference Paper
Times cited : (16)

References (11)
  • 4
    • 79955415819 scopus 로고    scopus 로고
    • Energy consumption and CO2 emissions from the world cement industry, Institute for Prospective Technological studies, European Commision
    • 2 emissions from the world cement industry, Institute for Prospective Technological studies, European Commision, 2003
    • (2003)
    • Szabó, L.1    Hidalgo, I.2    Ciscar, J.C.3    Soria, A.4    Russ, P.5
  • 5
    • 79955435230 scopus 로고    scopus 로고
    • CEMBUREAU, Best available techniques for the cement industry, A contribution from the European cement industry to the exchange of information and preparation of IPPC BAT REFERENCE. Document for the cement industry, 1999. Available at
    • CEMBUREAU, Best available techniques for the cement industry, A contribution from the European cement industry to the exchange of information and preparation of IPPC BAT REFERENCE. Document for the cement industry, 1999. Available at www.cembureau.be
  • 9
    • 0029278485 scopus 로고
    • New and efficient high-temperature processes with circulating fluid bed reactors
    • Reh L. New and efficient high-temperature processes with circulating fluid bed reactors. Chem. Eng. Technol. 18 (1995) 75-89
    • (1995) Chem. Eng. Technol. , vol.18 , pp. 75-89
    • Reh, L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.