메뉴 건너뛰기




Volumn 164, Issue 2, 2011, Pages 81-87

The barker crossing: Royal engineers reconnect workington

(1)  Livesey, Caroline a  

a NONE

Author keywords

Disaster engineering; Footbridges; Military engineering

Indexed keywords

DESIGN AND CONSTRUCTION; EMERGENCY SERVICE; GREENFIELD;

EID: 79954997216     PISSN: 0965089X     EISSN: 17517672     Source Type: Journal    
DOI: 10.1680/cien.2011.164.2.81     Document Type: Article
Times cited : (3)

References (4)
  • 1
    • 79955004061 scopus 로고    scopus 로고
    • Army Equipment Support Publication 5420 - C-125
    • British Army, ministr y of defence, london
    • British Army (2007) Army Equipment Support Publication 5420 - C-125 Vol. 1 Issue 2, Logistic Support Bridge. ministr y of defence, london.
    • (2007) Logistic Support Bridge , vol.1 , Issue.2
  • 3
    • 79955006754 scopus 로고    scopus 로고
    • Cumbria County Council (2011) see http://www.cumbria.gov.uk/news/2009/november/25_11_2009-100422.asp (accessed 02/02/2011).
  • 4
    • 79955015954 scopus 로고    scopus 로고
    • met office (2011) see http://www.metoffice.gov.uk/climate/uk/extremes/#rainfall (accessed 02/02/2011).


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.