메뉴 건너뛰기




Volumn , Issue , 2010, Pages 584-587

The effects of event selection based on soft constraint violation (ESSCV) in a modified PSO algorithm to solve class scheduling problems

Author keywords

Particle swarm optimization; Scheduling; Timetabling

Indexed keywords

CLASS SCHEDULING; EVENT SELECTION; EXECUTION TIME; INITIAL SOLUTION; LOCAL SEARCH HEURISTICS; PENALTY REDUCTION; PSO ALGORITHMS; SOFT CONSTRAINT; TIME SLOTS; TIMETABLING;

EID: 79953901411     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICCAIE.2010.5735148     Document Type: Conference Paper
Times cited : (4)

References (19)
  • 3
    • 33751191658 scopus 로고    scopus 로고
    • A hybrid particle swarm optimization for job shop scheduling problem
    • D. Y. Sha and C. Y. Hsu, "A hybrid particle swarm optimization for job shop scheduling problem, " Computers & Industrial Engineering, vol. 51, pp. 791-808, 2006.
    • (2006) Computers & Industrial Engineering , vol.51 , pp. 791-808
    • Sha, D.Y.1    Hsu, C.Y.2
  • 4
    • 33751236810 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
    • DOI 10.1016/j.ejor.2005.12.024, PII S0377221705008453
    • M. F. Tasgetiren, Y. C. Liang, M. Sevkli, and G. Gencyilmaz, "A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem, " European Journal of Operational Research, vol. 177, pp. 1930-1947, 2007. (Pubitemid 44780934)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1930-1947
    • Tasgetiren, M.F.1    Liang, Y.-C.2    Sevkli, M.3    Gencyilmaz, G.4
  • 5
    • 38049085312 scopus 로고    scopus 로고
    • A hybrid algorithm based on particle swarm optimization and simulated annealing for job shop scheduling
    • H. Ge, W. Du, and F. Qian, "A Hybrid Algorithm Based on Particle Swarm Optimization and Simulated Annealing for Job Shop Scheduling, " in Proc. Third International Conference on Natural Computation (ICNC 2007), 2007, vol. 3, pp. 715-719.
    • (2007) Proc. Third International Conference on Natural Computation (ICNC 2007) , vol.3 , pp. 715-719
    • Ge, H.1    Du, W.2    Qian, F.3
  • 7
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • DOI 10.1016/j.amc.2007.04.096, PII S009630030700553X
    • B. Jarboui, N. Damak, P. Siarry, and A. Rebai, "A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems, " Applied Mathematics and Computation, vol. 195, pp. 299-308, 2008. (Pubitemid 350213083)
    • (2008) Applied Mathematics and Computation , vol.195 , Issue.1 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 8
    • 38749118677 scopus 로고    scopus 로고
    • An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers
    • DOI 10.1016/j.cor.2006.12.013, PII S0305054806003169
    • B. Liu, L. Wang, and Y. H. Jin, "An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers, " Computers & Operations Research, vol. 35, pp. 2791-2806, 2008. (Pubitemid 351186803)
    • (2008) Computers and Operations Research , vol.35 , Issue.9 , pp. 2791-2806
    • Liu, B.1    Wang, L.2    Jin, Y.-H.3
  • 9
    • 33846646885 scopus 로고    scopus 로고
    • A TDMA scheduling scheme for many-to-one communications in wireless sensor networks
    • DOI 10.1016/j.comcom.2006.10.006, PII S0140366406004002, Nature-Inspired Distributed Computing
    • J. Mao, Z. Wu, and X. Wu, "A TDMA scheduling scheme for many-to-one communications in wireless sensor networks, " Computer Communications, vol. 30, pp. 863-872, 2007. (Pubitemid 46185563)
    • (2007) Computer Communications , vol.30 , Issue.4 , pp. 863-872
    • Mao, J.1    Wu, Z.2    Wu, X.3
  • 11
    • 34548613299 scopus 로고    scopus 로고
    • Ant colony optimization combined with taboo search for the job shop scheduling problem
    • K. L. Huang and C. J. Liao, "Ant colony optimization combined with taboo search for the job shop scheduling problem, " Comput. Oper. Res., vol. 35, pp. 1030-1046, 2008.
    • (2008) Comput. Oper. Res. , vol.35 , pp. 1030-1046
    • Huang, K.L.1    Liao, C.J.2
  • 13
    • 18444389480 scopus 로고    scopus 로고
    • Improved particle swarm optimization combined with chaos
    • DOI 10.1016/j.chaos.2004.11.095, PII S0960077905000330
    • B. Liu, L. Wang, Y. H. Jin, F. Tang, and D. X. Huang, "Improved particle swarm optimization combined with chaos, " Chaos, Solitons & Fractals, vol. 25, pp. 1261-1271, 2005. (Pubitemid 40643077)
    • (2005) Chaos, Solitons and Fractals , vol.25 , Issue.5 , pp. 1261-1271
    • Liu, B.1    Wang, L.2    Jin, Y.-H.3    Tang, F.4    Huang, D.-X.5
  • 15
    • 37249009707 scopus 로고    scopus 로고
    • A hybrid genetic algorithm and particle swarm optimization for multimodal functions
    • DOI 10.1016/j.asoc.2007.07.002, PII S1568494607000683
    • Y. T. Kao and E. Zahara, "A hybrid genetic algorithm and particle swarm optimization for multimodal functions, " Applied Soft Computing, vol. 8, pp. 849- 857, 2008. (Pubitemid 350266482)
    • (2008) Applied Soft Computing Journal , vol.8 , Issue.2 , pp. 849-857
    • Kao, Y.-T.1    Zahara, E.2
  • 18
    • 52949136333 scopus 로고    scopus 로고
    • Particle swarm optimization-based parameter identification applied to permanent magnet synchronous motors
    • vol. In Press, Corrected Proof.
    • L. Liu, W. Liu, and D. A. Cartes, "Particle swarm optimization-based parameter identification applied to permanent magnet synchronous motors, " Engineering Applications of Artificial Intelligence, vol. In Press, Corrected Proof.
    • Engineering Applications of Artificial Intelligence
    • Liu, L.1    Liu, W.2    Cartes, D.A.3
  • 19
    • 35348871210 scopus 로고    scopus 로고
    • PSO-based algorithm for home care worker scheduling in the UK
    • DOI 10.1016/j.cie.2007.06.002, PII S0360835207000927
    • C. Akjiratikarl, P. Yenradee, and P. R. Drake, "PSObased algorithm for home care worker scheduling in the UK, " Computers & Industrial Engineering, vol. 53, pp. 559-583, 2007. (Pubitemid 47588644)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.4 , pp. 559-583
    • Akjiratikarl, C.1    Yenradee, P.2    Drake, P.R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.