메뉴 건너뛰기




Volumn 2011, Issue , 2011, Pages

Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid

Author keywords

[No Author keywords available]

Indexed keywords


EID: 79953281453     PISSN: 10853375     EISSN: 16870409     Source Type: Journal    
DOI: 10.1155/2011/589862     Document Type: Article
Times cited : (31)

References (48)
  • 7
    • 0016473805 scopus 로고
    • A branch and bound algorithm for the generalized assignment problem
    • Ross G. T., Soland R. M., A branch and bound algorithm for the generalized assignment problem Mathematical Programming 1975 8 91 103
    • (1975) Mathematical Programming , vol.8 , pp. 91-103
    • Ross, G.T.1    Soland, R.M.2
  • 8
    • 33845665257 scopus 로고    scopus 로고
    • Combining competitive scheme with slack neurons to solve real-time job scheduling problem
    • Chen R. M., Lo S. T., Huang Y. M., Combining competitive scheme with slack neurons to solve real-time job scheduling problem Expert Systems with Applications 2007 33 1 75 85
    • (2007) Expert Systems with Applications , vol.33 , Issue.1 , pp. 75-85
    • Chen, R.M.1    Lo, S.T.2    Huang, Y.M.3
  • 9
    • 1642264119 scopus 로고    scopus 로고
    • Secure distributed configuration management with randomised scheduling of system-administration tasks
    • Sandnes F. E., Secure distributed configuration management with randomised scheduling of system-administration tasks IEICE Transactions on Information and Systems 2003 E86-D 9 1601 1610
    • (2003) IEICE Transactions on Information and Systems , vol.E86-D , Issue.9 , pp. 1601-1610
    • Sandnes, F.E.1
  • 10
    • 70449635673 scopus 로고    scopus 로고
    • Hybridization of artificial immune systems and sequential quadratic programming for dynamic economic dispatch
    • Basu M., Hybridization of artificial immune systems and sequential quadratic programming for dynamic economic dispatch Electric Power Components and Systems 2009 37 9 1036 1045
    • (2009) Electric Power Components and Systems , vol.37 , Issue.9 , pp. 1036-1045
    • Basu, M.1
  • 12
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick S., Gelatt C. D. Jr., Vecchi M. P., Optimization by simulated annealing Science 1983 220 4598 671 680
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt Jr., C.D.2    Vecchi, M.P.3
  • 15
    • 0031122887 scopus 로고    scopus 로고
    • Ant colony system: A cooperative learning approach to the traveling salesman problem
    • PII S1089778X97033031
    • Dorigo M., Gambardella L. M., Ant colony system: a cooperative learning approach to the traveling salesman problem IEEE Transactions on Evolutionary Computation 1997 1 1 53 66 (Pubitemid 127771018)
    • (1997) IEEE Transactions on Evolutionary Computation , vol.1 , Issue.1 , pp. 53-66
    • Dorigo, M.1    Gambardella, L.M.2
  • 17
    • 1242287612 scopus 로고    scopus 로고
    • Genetic-algorithm-based real-time task scheduling with multiple goals
    • Oh J., Wu C., Genetic-algorithm-based real-time task scheduling with multiple goals Journal of Systems and Software 2004 71 3 245 258
    • (2004) Journal of Systems and Software , vol.71 , Issue.3 , pp. 245-258
    • Oh, J.1    Wu, C.2
  • 19
    • 73649119873 scopus 로고    scopus 로고
    • Unit commitment using a new integer coded genetic algorithm
    • Amjady N., Shirzadi A., Unit commitment using a new integer coded genetic algorithm European Transactions on Electrical Power 2009 19 8 1161 1176
    • (2009) European Transactions on Electrical Power , vol.19 , Issue.8 , pp. 1161-1176
    • Amjady, N.1    Shirzadi, A.2
  • 21
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen K., Lecocq H., A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version European Journal of Operational Research 2003 149 2 268 281
    • (2003) European Journal of Operational Research , vol.149 , Issue.2 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 23
    • 0037120685 scopus 로고    scopus 로고
    • Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties
    • DOI 10.1016/S0377-2217(01)00302-2, PII S0377221701003022
    • Wan G., Yen B. P.-C., Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties European Journal of Operational Research 2002 142 2 271 281 (Pubitemid 34803133)
    • (2002) European Journal of Operational Research , vol.142 , Issue.2 , pp. 271-281
    • Wan, G.1    Yen, B.P.-C.2
  • 25
    • 37349117451 scopus 로고    scopus 로고
    • Multiprocessor system scheduling with precedence and resource constraints using an enhanced ant colony system
    • Lo S. T., Chen R. M., Huang Y. M., Wu C. L., Multiprocessor system scheduling with precedence and resource constraints using an enhanced ant colony system Expert Systems with Applications 2008 34 3 2071 2081
    • (2008) Expert Systems with Applications , vol.34 , Issue.3 , pp. 2071-2081
    • Lo, S.T.1    Chen, R.M.2    Huang, Y.M.3    Wu, C.L.4
  • 26
    • 33748320730 scopus 로고    scopus 로고
    • An ACO algorithm for a dynamic regional nurse-scheduling problem in Austria
    • DOI 10.1016/j.cor.2005.03.018, PII S0305054805001139
    • Gutjahr W. J., Rauner M. S., An ACO algorithm for a dynamic regional nurse-scheduling problem in Austria Computers and Operations Research 2007 34 3 642 666 (Pubitemid 44332694)
    • (2007) Computers and Operations Research , vol.34 , Issue.3 , pp. 642-666
    • Gutjahr, W.J.1    Rauner, M.S.2
  • 27
    • 74949126533 scopus 로고    scopus 로고
    • A hybrid particle swarm optimisation algorithm and fuzzy logic for process planning and production scheduling integration in holonic manufacturing systems
    • Zhao F., Hong Y., Yu D., Yang Y., Zhang Q., A hybrid particle swarm optimisation algorithm and fuzzy logic for process planning and production scheduling integration in holonic manufacturing systems International Journal of Computer Integrated Manufacturing 2010 23 1 20 39
    • (2010) International Journal of Computer Integrated Manufacturing , vol.23 , Issue.1 , pp. 20-39
    • Zhao, F.1    Hong, Y.2    Yu, D.3    Yang, Y.4    Zhang, Q.5
  • 29
    • 77049113541 scopus 로고    scopus 로고
    • A multi-swarm approach to multi-objective flexible job-shop scheduling problems
    • Liu H., Abraham A., Wang Z., A multi-swarm approach to multi-objective flexible job-shop scheduling problems Fundamenta Informaticae 2009 95 4 465 489
    • (2009) Fundamenta Informaticae , vol.95 , Issue.4 , pp. 465-489
    • Liu, H.1    Abraham, A.2    Wang, Z.3
  • 30
    • 70449527542 scopus 로고    scopus 로고
    • Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB
    • Chen R. M., Wu C. L., Wang C. M., Lo S. T., Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB Expert Systems with Applications 2010 37 3 1899 1910
    • (2010) Expert Systems with Applications , vol.37 , Issue.3 , pp. 1899-1910
    • Chen, R.M.1    Wu, C.L.2    Wang, C.M.3    Lo, S.T.4
  • 32
    • 33751236810 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
    • DOI 10.1016/j.ejor.2005.12.024, PII S0377221705008453
    • Tasgetiren M. F., Liang Y. C., Sevkli M., Gencyilmaz G., A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem European Journal of Operational Research 2007 177 3 1930 1947 (Pubitemid 44780934)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1930-1947
    • Tasgetiren, M.F.1    Liang, Y.-C.2    Sevkli, M.3    Gencyilmaz, G.4
  • 34
    • 76149135701 scopus 로고    scopus 로고
    • Novel scheduling strategy for downlink multiuser MIMO system: Particle swarm optimization
    • Hei Y., Li X., Yi K., Yang H., Novel scheduling strategy for downlink multiuser MIMO system: particle swarm optimization Science in China F 2009 52 12 2279 2289
    • (2009) Science in China F , vol.52 , Issue.12 , pp. 2279-2289
    • Hei, Y.1    Li, X.2    Yi, K.3    Yang, H.4
  • 35
    • 0036464756 scopus 로고    scopus 로고
    • The particle swarm-explosion, stability, and convergence in a multidimensional complex space
    • DOI 10.1109/4235.985692, PII S1089778X02022099
    • Clerc M., Kennedy J., The particle swarm-explosion, stability, and convergence in a multidimensional complex space IEEE Transactions on Evolutionary Computation 2002 6 1 58 73 (Pubitemid 34404564)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.1 , pp. 58-73
    • Clerc, M.1    Kennedy, J.2
  • 36
    • 0035612930 scopus 로고    scopus 로고
    • Project Scheduling with Multiple Modes: A Genetic Algorithm
    • DOI 10.1023/A:1010902015091
    • Hartmann S., Project scheduling with multiple modes: a genetic algorithm Annals of Operations Research 2001 102 1 111 135 (Pubitemid 33634389)
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 111-135
    • Hartmann, S.1
  • 37
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor F. F., Heuristics for scheduling projects with resource restrictions and several resource-duration modes International Journal of Production Research 1993 31 11 2547 2558
    • (1993) International Journal of Production Research , vol.31 , Issue.11 , pp. 2547-2558
    • Boctor, F.F.1
  • 40
    • 0032482432 scopus 로고    scopus 로고
    • Collective dynamics of small-world networks
    • Watts D. J., Strogatz S. H., Collective dynamics of small-world networks Nature 1998 393 6684 440 442
    • (1998) Nature , vol.393 , Issue.6684 , pp. 440-442
    • Watts, D.J.1    Strogatz, S.H.2
  • 41
    • 12344305365 scopus 로고    scopus 로고
    • Scheduling in grid computing environment based on genetic algorithm
    • Lin J. N., Wu H. Z., Scheduling in grid computing environment based on genetic algorithm Journal of Computer Research and Development 2004 41 12 2195 2199
    • (2004) Journal of Computer Research and Development , vol.41 , Issue.12 , pp. 2195-2199
    • Lin, J.N.1    Wu, H.Z.2
  • 42
    • 79953272513 scopus 로고    scopus 로고
    • Project Scheduling Problem Library PSPLIB
    • Project Scheduling Problem Library,. PSPLIB, http://129.187.106.231/ psplib/
  • 43
    • 0032042933 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: A survey of recent developments
    • Herroelen W., De Reyck B., Demeulemeester E., Resource-constrained project scheduling: a survey of recent developments Computers Operations Research 1998 25 4 279 302
    • (1998) Computers Operations Research , vol.25 , Issue.4 , pp. 279-302
    • Herroelen, W.1    De Reyck, B.2    Demeulemeester, E.3
  • 44
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • DOI 10.1016/j.amc.2007.04.096, PII S009630030700553X
    • Jarboui B., Damak N., Siarry P., Rebai A., A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems Applied Mathematics and Computation 2008 195 1 299 308 (Pubitemid 350213083)
    • (2008) Applied Mathematics and Computation , vol.195 , Issue.1 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 45
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • Alcaraz J., Maroto C., Ruiz R., Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms Journal of the Operational Research Society 2003 54 6 614 626
    • (2003) Journal of the Operational Research Society , vol.54 , Issue.6 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 46
    • 0035612931 scopus 로고    scopus 로고
    • Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling
    • DOI 10.1023/A:1010954031930
    • Jzefowska J., Mika M., Rycki R., Waligra G., Wglarz J., Simulated annealing for multi-mode resource-constrained project scheduling Annals of Operations Research 2001 102 14 137 155 (Pubitemid 33634390)
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 137-155
    • Jozefowska, J.1    Mika, M.2    Rozycki, R.3    Waligora, G.4    Weglarz, J.5
  • 47
    • 55349145233 scopus 로고    scopus 로고
    • Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling
    • Chiang C. W., Huang Y. Q., Wang W. Y., Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling Journal of Intelligent and Fuzzy Systems 2008 19 4-5 345 358
    • (2008) Journal of Intelligent and Fuzzy Systems , vol.19 , Issue.45 , pp. 345-358
    • Chiang, C.W.1    Huang, Y.Q.2    Wang, W.Y.3
  • 48
    • 0040577754 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A comparison of exact algorithms
    • Hartmann S., Drexl A., Project scheduling with multiple modes: a comparison of exact algorithms Networks 1998 32 4 283 297 (Pubitemid 128365138)
    • (1998) Networks , vol.32 , Issue.4 , pp. 283-297
    • Hartmann, S.1    Drexl, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.